This document is a detailed technical specification (Section 33 56 10) for factory-fabricated fuel storage tanks, specifically focusing on aboveground double-wall steel tanks for the Department of Defense. The specification provides comprehensive requirements for tank design, materials, components, and installation, including detailed provisions for tank construction, protective coatings, venting, level alarm systems, tank gauges, and quality control testing.
Key technical requirements include a 30-year manufacturer's warranty, double-wall steel tank construction conforming to UL 142 standards, independent level alarm systems with four programmable setpoints (high, high-high, low, and low-low levels), mechanical and automatic tank gauging systems, and specific testing protocols. The specification mandates strict installation procedures, requires tank inspection reports by a certified inspector, and calls for a two-hour training session for government personnel on system operation and maintenance. Tanks must be labeled with product information, tank number, and hazardous material identification, and must be installed with safety features like antisplash deflectors and dielectric bushings.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 33 56 10
FACTORY-FABRICATED FUEL STORAGE TANKS
05/19, CHG 1: 11/20
PART 1 GENERAL
1.1 SUMMARY
This section defines the requirements for factory-fabricated fuel storage tanks.
1.1.1 Related Sections
1.1.1.1 Earthwork
Excavation and backfilling for tanks must be as specified in Section
31 00 00 EARTHWORK.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO HB-17 (2002; Errata 2003; Errata 2005, 17th Edition) Standard Specifications for Highway Bridges
AMERICAN PETROLEUM INSTITUTE (API)
API MPMS 2.2A (1995; R 2017) Manual of Petroleum Measurement Standards Chapter 2-Tank Calibration Section 2A-Measurement and Calibration of Upright Cylindrical Tanks by the Manual Tank Strapping Method
API MPMS 2.2E (2004; Errata 2009; R 2009) Petroleum and Liquid Petroleum Products - Calibration of Horizontal Cylindrical Tanks - Part 1:
Manual Methods
API RP 540 (1999; R 2004) Electrical Installations in Petroleum Processing Plants
API RP 1615 (2011) Installation of Underground Petroleum Storage Systems
API RP 2003 (2015; 8th Ed) Protection Against Ignitions Arising out of Static, Lightning, and Stray Currents
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.5 (2020) Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME BPVC SEC VIII D1 (2019) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
ASTM INTERNATIONAL (ASTM)
ASTM A27/A27M (2020) Standard Specification for Steel Castings, Carbon, for General Application
ASTM A48/A48M (2022) Standard Specification for Gray Iron Castings
ASTM A193/A193M (2024a) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A194/A194M (2024) Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or Both
ASTM A307 (2021) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM A563 (2021; E 2022a) Standard Specification for Carbon and Alloy Steel Nuts
ASTM B26/B26M (2018; E 2018) Standard Specification for Aluminum-Alloy Sand Castings
ASTM D3308 (2012; R 2017) Standard Specification for PTFE Resin Skived Tape
ASTM F436 (2011) Hardened Steel Washers
ASTM F844 (2019; R 2024) Standard Specification for Washers, Steel, Plain (Flat), Unhardened for General Use
ASTM F1554 (2020) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 142 (2007; Errata 2014) Recommended Practice for Grounding of Industrial and Commercial Power Systems - IEEE Green Book
IEEE 1100 (2005) Emerald Book IEEE Recommended Practice for Powering and Grounding
Electronic Equipment
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2020) Enclosures for Electrical Equipment (1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 30 (2024; TIA 24-1) Flammable and Combustible Liquids Code
NFPA 30A (2024; ERTA 1 2023) Code for Motor Fuel Dispensing Facilities and Repair Garages
NFPA 31 (2024; TIA 23-1) Standard for the Installation of Oil-Burning Equipment
NFPA 70 (2023; ERTA 1 2024; TIA 24-1) National Electrical Code
NFPA 77 (2024; ERTA 1 2023) Recommended Practice on Static Electricity
NFPA 407 (2022; TIA 24-2) Standard for Aircraft Fuel Servicing
NFPA 704 (2022) Standard System for the Identification of the Hazards of Materials for Emergency Response
NFPA 780 (2023) Standard for the Installation of Lightning Protection Systems
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC QP 3 (2010) Standard Procedure for Evaluating Qualifications of Shop Painting Applicators
SSPC QS 1 (2015) Standard Procedure for Evaluating a Contractor's Advanced Quality Management System
STEEL TANK INSTITUTE (STI)
STI 020-50-1000 (2010) ACT-100 Specification for External Corrosion Protection of FRP Composite Steel USTs
STI 700-50-5007 (2010) Installation Instructions for Shop Fabricated Aboveground Tanks for Flammable, Combustible Liquids
STI F911 (1998; Reissued 2009) Standard for Diked Aboveground Storage Tanks
STI P3 (2011) Specification and Manual for
External Corrosion Protection of Underground Steel Storage Tanks
STI SP001 (2018, 6th Ed) SP001 Standard for The Inspection of Aboveground Storage Tanks
STI SP131 (2014) SP131 Standard for Inspection & Repair Underground Steel Tanks
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-161 (2005; Rev G; Notice 1 2010) Identification Methods for Bulk Petroleum Products Systems Including Hydrocarbon Missile Fuels
UL SOLUTIONS (UL)
UL 58 (2018) UL Standard for Safety Steel Underground Tanks for Flammable and Combustible Liquids
UL 80 (2007; Reprint Oct 2024) Standard for Steel Tanks for Oil-Burner Fuels and Other Combustible Liquids
UL 142 (2006; Reprint Jan 2021) UL Standard for Safety Steel Aboveground Tanks for Flammable and Combustible Liquids
UL 1316 (2018; Reprint Mar 2019) UL Standard for Safety Fiber Reinforced Underground Tanks for Flammable and Combustible Liquids
UL 1746 (2007; Reprint Dec 2014) External Corrosion Protection Systems for Steel Underground Storage Tanks
UL 2085 (1997; Reprint Sep 2010) Protected Aboveground Tanks for Flammable and Combustible Liquids
1.3 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for Contractor Quality Control approval and are provided to the Government for information only.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Grounding and Bonding
SD-03 Product Data
Aboveground Storage Tank (Double Wall Steel); G
Tank Protective Coatings; G
Atmospheric Vent; G
Emergency Vent; G
Independent Level Alarm System; G
Tank Gauges; G
SD-06 Test Reports
Aboveground Storage Tank Tightness Tests; G, Tank Manufacturer's Tests
Tank Fill Tests
Tank Inspection Reports; G
SD-07 Certificates
Contractor Qualifications; G
Manufacturer's Certification; G
State Certification; G
Pollution Liability Insurance
Permitting
Registration
Licensed Personnel
Demonstrations
SD-08 Manufacturer's Instructions
Aboveground Storage Tank
Independent Level Alarm System
Tank Gauges
SD-10 Operation and Maintenance Data
Aboveground Storage Tank; G
Independent Level Alarm System; G
Tank Gauges; G
1.4 QUALITY ASSURANCE
1.4.1 Contractor Qualifications
Each installation Contractor must have successfully completed at least 5 projects of the same scope, and the same size or larger within the last 3 years and demonstrated specific installation experience in regard to the specific system installation to be performed. Each installation Contractor must have taken, if applicable, manufacturer's training courses on the installation of storage tanks and must meet all applicable licensing requirements in the state. If applicable, state certified installers must be provided by the Contractor. Installers must also be trained and certified by the manufacturer to install the equipment and materials being installed and must be STI certified. Installers must submit certification from the manufacture and Oklahoma Corporation Commission (OCC). If installing underground storage tanks and piping systems, installation Contractor must have Pollution Liability Insurance.
Submit a letter listing prior projects, the date of construction, a point of contact for each prior project, the scope of work of each prior project, and a detailed list of work performed. The letter must also provide evidence of prior manufacturer's training, state licensing, and other related information.
1.4.2 Regulatory Requirements
1.4.2.1 Permitting
Obtain necessary permits in conjunction with the installation of storage tanks as required by federal, state, or local authority.
1.4.2.2 Registration
Obtain and complete all tank registration forms required by federal, state, and local authorities. Submit all completed tank registration forms within 30 days after contract award to the Contracting Officer. The Contracting Officer will ensure the Base Environmental staff for the DoD Installation submits the forms to the proper regulatory agencies.
1.4.2.3 Licensed Personnel
Tank installers must be licensed/certified by the state when the state requires licensed installers.
1.5 DELIVERY, STORAGE, AND HANDLING
Handle, store, and protect system components and materials to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer, upon recommendation by Base Environmental for the DoD Installation. Replace damaged or defective items.
1.6 PROJECT/SITE CONDITIONS
Exposed moving parts, parts that produce high operating temperatures and pressures, parts that may be electrically energized, and parts that may be a hazard to operating personnel must be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Install safety devices so that proper operation of equipment is not impaired.
1.7 WARRANTY
All factory-fabricated storage tanks must come with a manufacturer's warranty of a minimum period of 30 years. All warranty paperwork will be completed and submitted by Contractor to both the tank and system component manufacturers, the Contracting Officer, and the Base Environmental for the DoD Installation. This includes all applicable completed manufacturers' equipment installation checklists.
PART 2 PRODUCTS
2.1 ELECTRICAL WORK
Provide controllers, integral disconnects, contactors, controls, and control wiring with their respective pieces of system components. Provide electrical system components, including motors and wiring, as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Any wiring required for the operation specified herein, but not shown on the electrical plans, must be provided under this section in accordance with Section 26 20 00
INTERIOR DISTRIBUTION SYSTEM.
2.1.1 Grounding and Bonding
Grounding and bonding must be in accordance with NFPA 70, NFPA 77, NFPA 407, NFPA 780, API RP 540, API RP 2003, IEEE 142, and IEEE 1100. Provide jumpers to overcome the insulating effects of gaskets, paints, or nonmetallic components.
2.2 MATERIALS AND SYSTEM COMPONENTS
Provide materials and system components that are standard products of a manufacturer regularly engaged in the manufacturing of such products, that are of a similar material, design and workmanship. Provide materials and system components that have been in satisfactory commercial or industrial use for a minimum 3 years prior to bid opening. The 3 year period must include applications of the system components and materials under similar circumstances and of similar size. Provide materials and system components that have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 3 year period.
Internal parts and components of system components, piping, piping components, and valves that could be exposed to fuel during system operation must not be constructed of zinc coated (galvanized) metal, brass, bronze, or other copper alloys. Do not install cast iron bodied valves in piping systems that could be exposed to fuel during system operation.
2.3 NAMEPLATES
Attach nameplates to all specified system components defined herein. List on each nameplate the manufacturer's name, address, contract number, component type or style, model or serial number, catalog number, capacity or size, and the system that is controlled. Construct plates of stainless steel. Install nameplates in prominent locations with nonferrous screws, nonferrous bolts, or permanent adhesive. Minimum size of nameplates must b e one by 2.5 inches. Provide manufacturer's storage tank nameplates as required. Accurately align all lettering on nameplates.
2.4 ABOVEGROUND STORAGE TANK
2.4.1 Aboveground Storage Tank (Double Wall Steel)
Provide a factory-assembled unit that includes a factory-fabricated primary storage tank and an integral secondary containment. Tank assembly must be in accordance with NFPA 30, NFPA 31, and be designed and manufactured for a rectangular installation. Primary storage tank must be factory-welded, steel that conforms to UL 142. Tank assembly must be mounted on the tank manufacturer's standard UL listed support skid. Tank assembly must have lifting lugs that allow tank relocation. Provide a minimal 5 gal spill container on the tank fill line. The container must be lockable and must contain any spillage encountered at the tank during tank filling operations.
2.4.1.1 Double Wall Steel Tank
The secondary containment (outer) tank must be a factory-fabricated, steel type that fully-encloses the primary storage (inner) tank. The entire tank assembly must conform to UL 142 and bear the UL 142 label. The interstitial space between the primary tank and the secondary containment tank must be both pressure testable and verifiable. The primary storage tank must be supported within the secondary containment tank reservoir with steel tank saddles, or other similar supports, fabricated and installed by the tank manufacturer.
2.5 TANK PROTECTIVE COATINGS
2.5.1 Interior Surfaces
Coat 100 percent of a metal tank's interior surfaces including all metal piping and metal appurtenances as specified with the manufacturer's standard coating system.
2.5.2 Exterior Surfaces, Aboveground Tanks
Protect the exterior surfaces of each aboveground tank with the manufacturer's standard coating system as modified herein.
2.5.3 Tank Labeling
Tank must be labelled with the following information at a minimum:
a. Product Stored and Tank Capacity (Per MIL-STD-161).
b. Tank Number and Facility Number.
c. NFPA 704 Diamond Hazmat Label.
2.6 TANK COMPONENTS
2.6.1 Tank Piping Penetrations
Provide a welded-in-place double tapered National Pipe Thread (NPT) coupling for each tank piping connection. All unused or spare tank piping penetrations must be sealed with steel plugs.
2.6.2 Tank Striker/Impact Plates
Provide an interior striker/impact plate under each tank manhole and pipe connection. Each plate must be a minimum of 1/4 inch in thickness, be larger in diameter than the tank penetration, fit the curvature of the tank bottom, and be completely coated in the same fashion as the interior tank bottom coating. Each plate must be welded to the tank bottom at the factory (full circumference connection). The welds must be non-destructive tested using the appropriate means.
2.6.3 Manual Gauging/Sampling Hatch
Provide a combination gauging and sampling hatch assembly. The assembly must include a bronze top-seal type adapter with a corresponding locking type cap (adapter and cap both externally-mounted to the top of the tank) and a steel stilling well pipe. The stilling well pipe must be a minimum 4 inches in size and extend downward through the top of the tank to within 3 inches of the tank bottom.
2.6.4 Tank Venting
2.6.4.1 Atmospheric Vent
Provide atmospheric, updraft type cap. Cap must be constructed of aluminum or carbon steel. Cap must have an internal brass or bronze insect screen, minimum 40-mesh. Cap must prevent rain, snow, or ice from entering the vent piping.
2.6.4.2 Emergency Vent
Vent must be the normally-closed, UL listed type that vents outward and upward. Vent must conform with NFPA 30 and UL 142 and must be sized by the tank manufacturer. Provide vent with the cubic feet per minute (cfm) rating permanently labeled on the vent's exterior. For double wall or protected type tanks, provide a second emergency vent to protect the interstitial space.
2.7 INDEPENDENT LEVEL ALARM SYSTEM
Provide an independent level alarm system that will monitor 4 programmable liquid level setpoints. The system must delineate between each individual setpoint [as well as each individual tank]. The system must produce an audible and visible alarm in the event of monitoring an alarm condition.
Mechanically-actuated float assemblies must be field adjustable. The system must be totally independent of the tank gauging system.
2.7.1 Setpoints
Configure the alarm system's 4 setpoints in accordance with the following.
a. High Level Setpoint. Produce an alarm condition when a tank's liquid level rises above 90 percent capacity.
b. High-High Level Setpoint. Produce an alarm condition when a tank's liquid level rises above 95 percent capacity.
c. Low Level Setpoint. Produce an alarm condition when a tank's liquid level drops below 65 percent capacity.
d. Low-Low Level Setpoint. Produce an alarm condition when a tank's liquid level drops below 50 percent capacity.
2.7.2 Independent Level Alarm Control Panel
Install the control panel for the alarm system in a standard industrial enclosure. Panel doors must swing left or right.
2.7.2.1 Audible Alarm
Panel must have external speakers that produce a buzzer sound of 70 decibels or greater in the event of a detected alarm condition.
2.7.2.2 Visual Alarm
Panel must have a visual alarm that illuminates in the event of a detected alarm condition. The visual alarm must include either individual lights for each alarm condition or must include a single light and a liquid crystal display (LCD) panel that displaces information regarding each alarm condition.
2.7.2.3 Acknowledge Switch
Panel must have a manual acknowledge switch that will deactivate the audible alarm. The acknowledge switch must not deactivate subsequent audible alarms unless depressed manually again for each occurrence. Under no circumstance must this acknowledgement switch extinguish the visual alarms until the alarm condition has been corrected. The acknowledge switch must be an integral component located on the front of the control panel. The switch must be either a key switch or push button.
2.7.2.4 Test Pushbutton
Panel must have a manual test pushbutton that will enable operators to verify that the panel is powered, and the visual and audible alarms are working properly.
2.8 TANK GAUGES
2.8.1 Mechanical Clock Gauge
Gauge must be the level sensing, mechanically actuated type that provides the tank level readout in a sealed glass cap contained in a gauge box.
Gauge must be accurate to plus or minus 1/4 inch and must measure the liquid level over the full range of a tank's height. Gauge must have vapor tight seals to prevent condensation from fogging the viewing glass.
2.8.2 Automatic Tank Gauge System (ATG)
Gauge system must be the mechanically or electronically actuated type that can continuously monitor a tank's usable liquid level storage capacity.
The system must provide a digital readout of a tank's liquid level in terms of inches and gallons. The system must be accurate to plus or minus 1/16 inch. The system must measure water accumulation in inches from 3/4 to 5 inches off the bottom of a storage tank. Construct system components to be chemically compatible with the fuel to be handled. For each tank monitored, provide a sending unit that transmits the digital readout from a tank to the electronic monitoring/alarm panel defined in Section 33 01 50.31 LEAK DETECTION FOR FUELING SYSTEMSstandard industrial enclosure.
Panel doors must swing left or right. The panel must display the digital readout of each monitored tank on an LCD mounted exterior to the panel.
The panel must also have external controls to allow operators to toggle between information on the LCD without having to open the panel.
2.9 ACCESSORIES
2.9.1 Concrete Anchor Bolts
Concrete anchors must conform to ASTM F1554, hot-dipped galvanized.
2.9.2 Bolts and Studs
Carbon steel bolts and studs must conform to ASTM A307, Grade B, hot-dipped galvanized. Stainless steel bolts and studs that conform to ASTM A193/A193M, Grade 8.
2.9.3 Nuts
Carbon steel nuts must conform to ASTM A563, Grade A, hex style, hot-dipped galvanized. Stainless steel nuts must conform to ASTM A194/A194M, Grade 8.
2.9.4 Washers
Provide flat circular washers under each bolt head and each nut. Washer materials must be the same as the connecting bolt and nut. For ASTM F1554 concrete anchors, use ASTM F436, Type 1, hot-dipped galvanized washers.
For ASTM A307 bolts and studs, carbon steel washers must conform to ASTM F844, hot-dipped galvanized. Stainless steel washers must conform to ASTM A194/A194M, Grade 8.
2.9.5 Polytetrafluoroethylene (PTFE) Tape
Tape must conform to ASTM D3308.
PART 3 EXECUTION
3.1 INSTALLATION
Install work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Handle storage tanks with extreme care to prevent damage during placement and install in accordance with the manufacturer's installation instructions and NFPA 30, NFPA 30A, or NFPA 31 as applicable. Inspect the exterior surface of each tank for obvious visual damage prior to and during the placement of each storage tank. Repair surface damage to a storage tank according to manufacturer's requirements before proceeding with the system installation. Provide the termination of fill lines within a tank with an antisplash deflector.
Provide nylon dielectric bushings on pipe connections to a steel tank.
3.1.1 Aboveground Storage Tank
Install aboveground storage tanks in accordance with STI 700-50-5007 (STI R912) except as modified herein. Place tank that is less than 5,000 gallons on a level surface.
3.1.1.1 Steel Aboveground Storage Tank Handling
Store, handle, and place externally coated steel tanks with care and in a manner that will minimize damage to the coating and will not reduce its protective value. Place coated tanks in position carefully and with a minimum amount of handling. Repair any damaged tank coating in accordance with the appropriate UL or STI standard (UL 1746, STI 020-50-1000, or UL 58). Do not move the tank unless it is empty.
3.1.1.2 Steel Aboveground Tank Installation Procedures
Tanks should be secured to the associated tank pad per tank manufacturer's recommendations using fasteners installed through the tank saddle base plate.
3.1.2 System Components
Properly level, align, and secure system components in place in accordance with manufacturer's instructions. Provide supports for system components, appurtenances, and pipe as required. Install anchors, bolts, nuts, washers, and screws where required for securing the work in place. Sizes, types, and spacings of anchors and bolts not indicated or specified must be as required for proper installation.
3.2 FIELD QUALITY CONTROL
3.2.1 Aboveground Storage Tank Tightness Tests
Perform tightness tests on each aboveground storage tank prior to making piping connections. Perform testing in accordance with STI 700-50-5007 (STI R912)except as modified herein. Gauges used to monitor the tests must have a scale with a maximum limit of 15 psig. Repair leaks discovered during the tightness tests in accordance with tank manufacturer's instructions. Following any repair, re-test the tank until the tank successfully passes the testing requirements of this paragraph.
3.2.2 Tank Manufacturer's Tests
In addition to the tests required herein, perform any additional tests (i.e., leak tests, cathodic protection verification tests, etc.) on each storage test that is required by the tank manufacturer's written test procedures. Manufacturer's tests that are redundant to tests already required by this specification will only be performed once per tank.
Repair all leaks discovered during the tests in accordance with manufacturer's instructions. Following tank repairs, re-test the tank until the tank successfully passes the manufacturer's testing requirements.
3.2.3 System Commissioning
System commissioning must conform to Section 33 08 55 FUEL DISTRIBUTION
SYSTEM START-UP (NON-HYDRANT).
3.2.4 Tank Inspection Reports
Prior to system commissioning, a STI SP001 certified inspector must inspect the completed aboveground tank in accordance with STI SP001 and deliver a full report to the Contracting Officer. The report must include a record of ultrasonic thickness measurements (UTMs), exclusive of the coating, of each single wall aboveground tank shell. The report must include the tank dataplate information and photograph of the tank data plate. Provide electronic copies of the tank inspection reports to Service Headquarters, Service Control Points, and DLA-Energy. The paper and electronic copies of the report and UTMs must be provided to the Contracting Officer for filing with the tank's "as-built drawings."
3.3 DEMONSTRATIONS
Conduct a training session for designated Government personnel in the operation and maintenance procedures related to the system components and systems specified herein. Include pertinent safety operational procedures in the session as well as physical demonstrations of the routine maintenance operations. Furnish instructors who are familiar with the installation/system components and systems, both operational and practical theories, and associated routine maintenance procedures. The training session must consist of a total of 2 hours of normal working time and must start after the system is functionally completed, but prior to final system acceptance. Submit a letter, at least 14 working days prior to the proposed training date, scheduling a proposed date for conducting the onsite training.
3.4 Tank Fill Tests
Tank fill tests must not be performed until after the flushing, cleaning, and adjusting requirements defined in Section 33 08 55 FUEL DISTRIBUTION SYSTEM START-UP (NON-HYDRANT). For the tank fill tests, initially fill each storage tank with fuel in order to verify the tank level alarm system operates properly and the tank overfill protection device functions as designed. Stop filling each tank immediately once the overfill devices operates. Do not overfill any storage tank more than the 98 percent level. Drain the system below the low liquid level setpoint to verify operation of the low level alarm. Correct and retest any problems with the level alarm system or the overfill device until each operate as specified herein. During the tests, verify that all tank gauges are calibrated and operating appropriately.
3.5 FIELD PAINTING
Do not paint stainless steel and aluminum surfaces. Do not coat system components or components provided with a complete factory coating. Prior to any field painting, clean surfaces to remove dust, dirt, rust, oil, and grease.