Att13_230052_Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- FA813725R0033
About this file
These are 35% design drawings for a project to replace a vault and fuel tank at Building 1032 on Tinker Air Force Base in Oklahoma. The project involves removing the existing underground concrete vault, fuel tank, associated underground fuel lines, conduit, and vent piping, and installing four new 200-gallon double-wall fuel storage tanks with required vents, gauges, sensors, and accessories. The drawings specify detailed demolition and installation procedures, including phased replacement of day tanks, new equipment pad construction, stainless steel fuel piping installation, and compliance with specific codes including UFC 3-460-01, ASME B31.3, and Oklahoma Corporation Commission regulations. The project requires a licensed underground storage tank installer and is limited to Tinker AFB Multiple Award Contract (MAC) BOA holders, with a planned site visit on 22 May 2025 from 9:00-10:00 AM CT at Building 1032.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT: (CEFT)
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
WWYK230052
REPLACE VAULT AND
FUEL TANK, B1032
KEY PLAN:
GENERAL NOTES:
DISCIPLINEPROJECT
LOCATION
1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
PL
AC
E
VA
UL
T
AN
D
FU
EL
T
AN
K, B
Ap r 2
TE
PA
- S R
M
G-101
S
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\
\2
3\
\0
_S up po rt\
0_ 3_
D ra w in gs
GE
NE
RA
L N
OT
ES
AN
D
VI
CI
NI
TY
M
AP
01 07
AERIAL IMAGE WITH UTILITIESC-100
DEMOLITION PLAN VAULT AND FUEL TANKCD-101
MECHANICAL DEMOLITION PLAN
M-101
MECHANICAL NEW WORK PLAN
4 MD-101
ELECTRICAL DEMOLITION PLANED-101
ELECTRICAL NEW WORK PLANE-1017
Rapcon Rd.
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Cr ut ch o
Cr ee k
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
Arnold St.
Ea st
D r.
SE 74th St
SE 59th St.
Ai r D ep ot
Patrol Rd.
St af f D r.
Reserve Rd.
5th Ave
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
7th St.
"H " A ve
M cN ar ne y Av e.
Mitchell Ave
Al er t R d.
Co ok
A ve
W es t D r.
"E "A ve
Extender Dr.
Sentry Rd.
34th St.
Twining Dr.
5th Ave.
Jo ne s
Globemaster Dr.
To w er R d.
Vanaman Rd.
In du st ria l B lv d.
So ut h St
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
Ai r D ep ot
Ai r D ep ot
"D " A ve
Perimeter Rd.
Rapcon Rd.
Reserve Rd
"L " A ve
Mercury Rd.
1st St.
Br ow n Dr
Po nd
R d.
O ld
A ir
De po t
Airey Dr.
General Motors Dr
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Vandenberg Dr.
Hi llt op R d.
Do rm ito ry
R d.
Dormitory Rd.
"M " A ve
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
Co m m od ity D r.
Doolittle Ave
W hi te D r.
3rd Ave.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Ai r D ep ot
B lv d
Turbine Dr. Turbine Dr.
Central Plant Dr.
6th St.6th St.
Falco n Dr.
Blackb ird
Dr.
W ey la nd
L oo p
Pegasus Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Ph an to m
D r.
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
La w re nc e
M un de ll
Nabors Dr.
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ta il
Fe at he r D r.
Holden Dr.
Ai re y C ir.
Smith Ct.
Ra ve n Ct
Air Dep ot Ai r D ep ot
Vanaman Rd.
1st St.
1st St.
TAXIWAY F
Ra w li ng s A ve
Mitc he ll A ve
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
Pr op ul sio n Dr
Stratofortress Dr.
96021
Arnold St.
TINKER AFB, OK
VICINITY MAP
BASE
OPERATIONS
B240
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
HRUSKOCY
GATE
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
PROJECT
LOCATION
35%
DESIGN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ap r 2
TE
PA
-S R
M
J
AL
LE
N
C-100
S
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\
\2
3\
\0
_S up po rt\
0_ 3_
D ra w in gs
AE
RI
AL
IM
AG
E
W
IT
H
UT
ILI
TI
ES
02 07
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
C-100
AERIAL IMAGE WITH UTILITIES
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
TNK-1F
TEMPORARY
LOCATION
M
TNK-1F
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
CD-101
DEMOLITION PLAN VAULT AND FUEL TANK
NTS
35%
DESIGN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ap r 2
TE
PA
-S R
M
J
AL
LA
N
CD-101
S
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ign \20
\20
\20
\0_
Su pp or t\0
_3 _D ra wi ng s\
DE
MO
LIT
IO
N
PL
AN
V
AU
LT
AN
D
FU
EL
T
AN
K
03 07
KEYED NOTES
REMOVE EXISTING CONCRETE VAULT AND FUEL TANK.
TEST FOR CONTAMINATED SOIL.
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ap r 2
TE
PA
-S R
M
T
AR
M
ST
R O
N G
MD101
S
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\
\2
3\
\0
_S up po rt\
0_ 3_
D ra w in gs
M
EC
HA
NI
CA
L
DE
MO
LIT
IO
N
PL
AN
04 07
MD101
MECHANICAL DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OKDEMOLITION GENERAL NOTES
A. ALL INFORMATION AND GENERAL ARRANGEMENTS SHOWN ON DRAWINGS ARE
DIAGRAMMATIC AND SHOW DESIGN INTENT FOR INFORMATION ONLY. CONTRACTOR SHALL
VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO DEMOLITION AND
CONSTRUCTION.
B. CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS, THEY ARE NOT INTENDED
TO DEPICT UNFORESEEN CONDITIONS THAT MAY ADVERSELY AFFECT THE MECHANICAL
SYSTEM DEMOLITION OR INSTALLATION. MECHANICAL CONTRACTOR SHALL FIELD VERIFY
EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
C. CONTRACTOR SHALL PROVIDE AN ADEQUATE CONSTRUCTION BARRIER TO PROTECT ALL
ADJACENT AREAS FROM DAMAGE DURING DEMOLITION AND CONSTRUCTION.
D. CONTRACTOR SHALL PROTECT CONDUIT, WIRING, UNDERGROUND PIPING AND DEVICES THAT
ARE TO BE MODIFIED AND/OR RE-INSTALLED.
E. ALL DEMOLISHED EQUIPMENT SHALL REMAIN PROPERTY OF THE US GOVERNMENT.
CONTRACTOR SHALL CONSULT WITH CONTRACTING OFFICER FOR DIRECTION ON PROPER
DISPOSAL OR STORAGE OF ALL DEMOLISHED EQUIPMENT.
F. COORDINATE ALL SHUTDOWNS AND REQUIRED WORK IN EACH SPACE WITH THE
USER/GOVERNMENT A MINIMUM OF FOUR WEEKS PRIOR TO STARTING ANY WORK.
G. REMOVAL OF THE UNDERGROUND FUEL STORAGE TANK WILL REQUIRE A LICENSED
OKLAHOMA CORPORATION COMMISSION (OCC) OPERATOR ON SITE AND A LICENSED OCC
ENVIRONMENTAL CONSULTANT TO PERFORM THE REQUIRED SOIL SAMPLING AND COMPLY
WITH OCC 165:25-1-56.
H. PRIOR TO ALL DEMOLITION WORK, REMOVE ANY FUEL FROM THE TANK AND UNDERGROUND
PIPING; TEST THE SURROUNDING SOIL TO DETERMINE IF THE TANK IS LEAKING AND IF
REMEDIATION IS REQUIRED; AND INSPECT THE UNDERGROUND PIPE INSULATION FOR
ASBESTOS CONTAINING MATERIAL (ACM).
DEMOLITION KEYED NOTES
DEMOLISH COMPLETELY THE EXISTING UNDERGROUND FUEL TANK WITH ITS ASSOCIATED
TANK TOP CONTAINMENT SUMP, MANHOLES WITH ITS COVER, FUEL SENSOR, FILL PIPE WITH
SPILL BUCKET, RISER , VENT, FUEL CONNECTION PIPES, FITTINGS, SUBMERGED FUEL
TRANSFER PUMP, ETC. DEMOLISH THE UNDERGROUND VAULT.
DEMOLISH THE EXISTING FUEL PIPING, PIPE FITTINGS, AND PIPE INSULATION FROM THE
UNDERGROUND TANK INTO B1032 AND UP TO THE CONNECTIONS ON THE DAY TANKS.
PHASING NOTES
1. DISCONNECT ONE OF THE EXISTING DAY TANKS FROM THE MAIN STORAGE TANK'S SUPPLY AND
RETURN LINES. DEMOLISH THE DISCONNECTED DAY TANK, AND ITS PIPING TO THE FIRE PUMP.
2. CONSTRUCT THE NEW EQUIPMENT PAD AND INSTALL THE NEW TANK. MAKE ALL NECESSARY
CONNECTIONS TO BRING THE FIRE PUMP BACK INTO SERVICE.
3. REPEAT PROCESS FOR ALL FOUR TANKS.
4. AFTER NEW TANKS ARE INSTALLED, DEMOLISH THE UNDERGROUND MAIN TANK, VAULT AND
ALL ITS PIPING INTO B1032.
UNDERGROUND
FOS FOS FOS FOS FOS FOS
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ap r 2
TE
PA
-S R
M
T
AR
M
ST
R O
N G
M-101
S
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
2\
0_ Su pp or t\0 _3
_D ra w in gs
M
EC
HA
NI
CA
L
NE
W
W
OR
KP
LA
N
05 07
M-101
MECHANICAL NEW WORK PLAN
SCALE: 1/4" = 1'-0"
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONSTRUCTION GENERAL NOTES
A. BASIS OF DESIGN FOR EACH OF THE NEW FUEL TANKS IS A 200 GALLON TRAMONT TRS
WITH 150% CONTAINMENT.
B. INSTALLATION OF THE NEW FUEL STORAGE TANK WILL REQUIRE A LICENSED OKLAHOMA
CORPORATION COMMISSION (OCC) OPERATOR.
C. TANK SHALL HAVE A NORMAL VENT AND EMERGENCY VENTS FOR BOTH THE PRIMARY
TANK AND THE SECONDARY CONTAINMENT SPACE.
D. TANK WILL BE ELECTRICALLY GROUNDED.
E. A LOCKABLE FILL CAP SHALL BE PROVIDED.
F. TANK SHALL BEAR THE WORDS " FLAMMABLE KEEP FIRE AWAY" ON EACH SIDE OF THE
TANK. THE LETTERS MUST BE A MINIMUM OF FOUR INCHES (4") HIGH.
G. TANKS SHALL BE SUPPORTED TO PREVENT THE CONCENTRATION OF EXCESSIVE LOADS
ON THE TANK AT THE POINTS OF SUPPORT. ALL FOUNDATIONS AND FASTENINGS SHALL BE
DESIGNED TO PROVIDE REASONABLE SAFETY UNDER ALL IMPOSED LOADS INCLUDING
WIND, EARTHQUAKE, VIBRATIONS, ETC. THE TANK SHALL BE INSTALLED ON FOUNDATIONS
IN SUCH A MANNER AS TO PERMIT EXPANSION AND CONTRACTION.
CONSTRUCTION KEYED NOTES
CODES
THE FUEL STORAGE SYSTEM (TANK, PIPING AND ACCESSORIES) SHALL COMPLY WITH THE
FOLLOWING CODES AND STANDARDS:
A. UFC 3-460-01, PETROLEUM FUEL FACILITIES
B. ASME B31.3, PROCESS PIPING
C. OKLAHOMA ADMINISTRATIVE CODE, TITLE 165, CHAPTER 25, UNDERGROUND STORAGE
TANKS
D. OKLAHOMA ADMINISTRATIVE CODE, TITLE 165, CHAPTER 26, ABOVEGROUND STORAGE
TANKS
INSTALL NEW 200 GALLON, DOUBLE WALL, FUEL STORAGE TANKS WITH REQUIRED VENTS,
GAUGES, SENSORS, AND DECALS. INSTALL THE TANKS ON NEW EQUIPMENT PADS AND
PROVIDE LIQUID SENSORS FOR INTERSTITIAL SPACES OF THE NEW FUEL TANK. CONNECT
THE EXISTING MONITORING SYSTEM TO THE NEW PIPING. INSTALL NEW, STAINLESS
STEEL FUEL PIPING FROM THE TANK TO THE GENERATOR. FUEL LINES SHALL COMPLY
WITH ASME B31.3. INSTALLATION AND IDENTIFICATION SHALL COMPLY WITH UFC 3-460-01
SECTION 9-3 AND NFPA 20, NFPA 30 AND NFPA 31.
INSTALL FOUR NEW, STAINLESS STEEL TANK FILL LINES TO THE SOUTHEAST EXTERIOR
AND TERMINATE IN A WALL MOUNTED SPILL CONTAINER BOX WITH BOTTOM CONNECTION.
ADD SIGNAGE WITH THE PUMP UNIQUE IDENTIFICATION ABOVE EACH HOSE CONNECTION.
PHASING NOTES
1. DISCONNECT ONE OF THE EXISTING DAY TANKS FROM THE MAIN STORAGE TANK'S SUPPLY AND
RETURN LINES. DEMOLISH THE DISCONNECTED DAY TANK, AND ITS PIPING TO THE FIRE PUMP.
2. CONSTRUCT THE NEW EQUIPMENT PAD AND INSTALL THE NEW TANK. MAKE ALL NECESSARY
CONNECTIONS TO BRING THE FIRE PUMP BACK INTO SERVICE.
3. REPEAT PROCESS FOR ALL FOUR TANKS.
4. AFTER NEW TANKS ARE INSTALLED, DEMOLISH THE UNDERGROUND MAIN TANK, VAULT
AND ALL ITS PIPING INTO B1032.
M-101
EQUIPMENT PAD DETAIL
NTS
TYP.
FOS FOS FOS FOS FOS FOS
M
IN
UN
LE
SS
N
OT
ED
OT
HE
RW
IS
E
EDGE OF EQUIPMENT, SEE OTHER
DRAWINGS FOR SIZE AND LOCATIONS
#3 @ 16" O.C. E.W.
MID-DEPTH
SAME AS PERIM DWLS
2'x2' NOMINAL INTERIOR
SPACING
#3 @ 16" w/ STD HOOK @
TOP PERIM. 3" EMBED
DRILL AND EPOXY
EXISTING CONC.
SLAB
DO NOT DAMAGE SLAB/GRADE
BM REINF w/ DWLS
NOTE:
LEAVE CONC. FINISH ROUGH,
DAMPEN SURFACE PRIOR TO
PAD PLACEMENT
1-1/2" (MIN) CLR
3" (MAX)
6" MIN
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ap r 2
TE
PA
-S R
M
M T
O W
N
SE
LL
ED-101
S
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\ s\
\2
2\
0_ Su pp or t\0 _3
_D ra w in gs
EL
EC
TR
IC
AL
D
EM
OL
IT
IO
N
PL
AN
06 07
ED-101
ELECTRICAL DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OKGENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. CONTRACTOR MUST VERIFY THE ELECTRICAL FIELD REQUIREMENTS AND
WORKING SPACE REQUIRED PER CODE.
KEYED NOTES
5 2
DISCONNECT AND REMOVE THE CIRCUIT THAT FEED THE FUEL TANK SUMP PUMP
PANEL L1, CIRCUITS #8, #10, #12. REMOVE ANY OTHER ASSOCIATED COMPONENT.
DISCONNECT AND REMOVE THE LEAK DETECTION CIRCUITS THAT FEED THE
FUEL TANK BACK TO THE MONITOR.
DISCONNECT THE ALARM HORN.
REMOVE ANY STUB-UP CONDUITS.
REMOVE DAY TANK AND MONITORING SYSTEM. LEAVING THE CONTROL AND
CONDUITS IN PLACE TO BE REUSED.
BUILDING MAIN DISCONNECT SWITCH
UH-2
AC-1
PFW-5
FTM-1
TNK-FP1TNK-FP2TNK-FP3TNK-FP4
CNTR_FS-1CNTR_FS-2CNTR_FS-3CNTR_FS-4
FA-1
BTSYS-1BTSYS-2BTSYS-3BTSYS-4
1032-PNL-L2
DISC-1
1032-PNL-L1
UNDERGROUND
W W
YK
RE
PL
AC
E
V
AU
LT
A
ND
FU
EL
T
AN
K, B
Ap r 2
TE
PA
-S R
M
T
AR
M
ST
R O
N G
E-101
S
ST
AR
R
J M
IT
C
H
EL
L
En gr
\D es ig n\
\2
3\
\0
_S up po rt|
0_ 3_
D ra w in gs
EL
EC
TR
IC
AL
N
EW
W
OR
K
PL
AN
07 07
E-101
ELECTRICAL NEW WORK PLAN
SCALE: 1/4" = 1'-0"
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OKGENERAL NOTES
KEYED NOTES
1 PROVIDE AND INSTALL NEW TANK MONITORING SYSTEM.
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. CONTRACTOR MUST VERIFY THE ELECTRICAL FIELD REQUIREMENTS AND
WORKING SPACE REQUIRED PER CODE.
3. NEW ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND
WORKMANSHIP MANNER PER NFPA 70 AND UFC 3-501-01 SPECIFICATIONS
UH-2
AC-1
PFW-5
CNTR_FS-1CNTR_FS-2CNTR_FS-3CNTR_FS-4
FA-1
BTSYS-1BTSYS-2BTSYS-3BTSYS-4
1032-PNL-L2
DISC-1
1032-PNL-L1
| 07-230052-E101-E-101.pdf |
| Sheets and Views |
| E-101 |
| 06-230052-ED101-ED-101.pdf |
| Sheets and Views |
| ED-101 |
| 05-230052-M101-M-101.pdf |
| Sheets and Views |
| M-101 |
| 04-230052-MD101-MD101.pdf |
| Sheets and Views |
| MD101 |
| 03-230052-CD101-CD101.pdf |
| Sheets and Views |
| CD101 |
| 02-230052-C100-C-100.pdf |
| Sheets and Views |
| C-100 |
| 07-230052-E101-E-101.pdf |
| Sheets and Views |
| E-101 |
File details come from the government source that posted it. Updated .