26 08 00.pdf

PDF 13 KB Posted

Attached to
Tinker AFB MAC BOA WWYK230052, Replace Vault and Fuel Tank, B1032
Solicitation number
FA813725R0033
Issued by

About this file

This document is a technical specification section (26 08 00) for Apparatus Inspection and Testing at Tinker Air Force Base in Oklahoma, dated April 2019. The specification outlines requirements for a qualified testing organization to perform acceptance tests and inspections on electrical distribution systems and generation equipment. Key requirements include:

The testing organization must be independent of equipment suppliers and manufacturers, have at least 5 years of experience testing electrical systems, and employ a lead engineering technician certified by NETA or NICET. Specific equipment to be tested includes diesel generator sets, underground electrical distribution (medium voltage cables and grounding systems), automatic transfer switches, and low voltage switchgear. The contractor must submit test procedure reports 45 days prior to testing, and a representative from the testing organization must be present when equipment is initially energized and placed in service. Final system acceptance is contingent upon satisfactory completion of all specified acceptance tests and inspections.

View the file

Other files

File Type Posted
10 44 16.pdf PDF
33 08 55.pdf PDF
Att12_230052_Submittal Register_r2.pdf PDF
03 39 00.00 10.pdf PDF
03 30 00.pdf PDF
32 13 14.pdf PDF
10_230052_SOW_BWR_Revision_r1.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
03 20 00.00 10.pdf PDF
31 23 16.pdf PDF
32 16 13.pdf PDF
07 92 00.pdf PDF
32 92 19.pdf PDF
33 52 40.pdf PDF
33 52 23.15.pdf PDF
32 31 13.pdf PDF
03 11 13.00 10.pdf PDF
32 11 23.pdf PDF
Att12_230052_Submittal Register_r2.xlsx XLSX spreadsheet
26 05 00.00 40.pdf PDF
32 12 10.1.pdf PDF
31 00 00.pdf PDF
31 23 06.pdf PDF
26 00 00.00 20.pdf PDF
06 10 00.pdf PDF
33 56 10.pdf PDF
32 01 22.pdf PDF
31 23 15.pdf PDF
32 92 23.pdf PDF
02 41 00.pdf PDF
32 12 10.2.pdf PDF
WWYK230052 RFI responses COR Signed.pdf PDF
Sign-in Sheet WWYK230052 B1132.pdf PDF
Solicitation - FA813725R0033.pdf PDF
Wage Determination.pdf PDF
Att13_230052_Drawings.pdf PDF
Att12_230052_Submittal Register_r1.xlsx XLSX spreadsheet
ENG-34-066-58-75.pdf PDF
2 EAL List - BLANK to Contractors.xlsx XLSX spreadsheet
Att10_230052_SOW_BWR_Revision_24 April.pdf PDF
Fire Pump from WWYK180027.pdf PDF
B1032 from WWYK180027 IFC PLAN SET.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 26 08 00

APPARATUS I NSPECTI ON AND TESTI NG

04/17

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

I NTERNATI ONAL ELECTRI CAL TESTI NG ASSOCI ATI ON ( NETA)

NETA ATS ( 2013) St andar d f or Accept ance Test i ng Speci f i cat i ons f or El ect r i cal Power Equi pment and Syst ems

1. 2 RELATED REQUI REMENTS

Sect i on 26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS appl i es t o t hi s sect i on wi t h addi t i ons and modi f i cat i ons speci f i ed her ei n.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed al l submi t t al s. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 06 Test Repor t s

Accept ance t est s and i nspect i ons

SD- 07 Cer t i f i cat es

Qual i f i cat i ons of or gani zat i on, and l ead engi neer i ng t echni c i an

Accept ance t est and i nspect i ons pr ocedur e

1. 4 QUALI TY ASSURANCE

1. 4. 1 Qualifications

Cont r act or shal l engage t he ser vi ces of a qual i f i ed t est i ng or gani zat i on t o pr ovi de i nspect i on, t est i ng, cal i br at i on, and adj ust ment of t he el ect r i cal di st r i but i on syst em and gener at i on equi pment l i s t ed i n par agr aph ent i t l ed " Accept ance Test s and I nspect i ons" her ei n.

Or gani zat i on shal l be i ndependent of t he suppl i er , manuf act ur er , and i nst al l er of t he equi pment . The or gani zat i on shal l be a f i r st t i er subcont r act or . No wor k r equi r ed by t hi s sect i on of t he speci f i cat i on shal l be per f or med by a second t i er subcont r act or .

a. Submi t name and qual i f i cat i ons of or gani zat i on. Or gani zat i on shal l have been r egul ar l y engaged i n t he t est i ng of el ect r i cal mat er i al s, devi ces, i nst al l at i ons, and syst ems f or a mi ni mum of 5 year s. The or gani zat i on shal l have a cal i br at i on pr ogr am, and t est i nst r ument s used shal l be cal i br at ed i n accor dance wi t h NETA ATS.

Apr i l 2019 Page 1 SECTI ON 26 08 00

b. Submi t name and qual i f i cat i ons of t he l ead engi neer i ng t echni c i an per f or mi ng t he r equi r ed t est i ng ser vi ces. I ncl ude a l i s t of t hr ee compar abl e j obs per f or med by t he t echni c i an wi t h speci f i c names and t el ephone number s f or r ef er ence. Test i ng, i nspect i on, cal i br at i on, and adj ust ment s shal l be per f or med by an engi neer i ng t echni c i an, cer t i f i ed by NETA or t he Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es ( NI CET) wi t h a mi ni mum of 5 year s ' exper i ence i nspect i ng, t est i ng, and cal i br at i ng el ect r i cal di st r i but i on and gener at i on equi pment , syst ems, and devi ces.

1. 4. 2 Accept ance Test s and I nspect i ons Repor t s

Submi t cer t i f i ed copi es of i nspect i on r epor t s and t est r epor t s. Repor t s shal l i ncl ude cer t i f i cat i on of compl i ance wi t h speci f i ed r equi r ement s, i dent i f y def i c i enci es, and r ecommend cor r ect i ve act i on when appr opr i at e.

Type and neat l y bi nd t est r epor t s t o f or m a par t of t he f i nal r ecor d.

Submi t t est r epor t s document i ng t he r esul t s of each t est not mor e t han 10 days af t er t est i s compl et ed.

1. 4. 3 Accept ance Test and I nspect i ons Pr ocedur e

Submi t t est pr ocedur e r epor t s f or each i t em of equi pment t o be f i el d t est ed at l east 45 days pr i or t o pl anned t est i ng dat e. Do not per f or m t est i ng unt i l af t er t est pr ocedur e has been appr oved.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

3. 1 ACCEPTANCE TESTS AND I NSPECTI ONS

Test i ng or gani zat i on shal l per f or m accept ance t est s and i nspect i ons. Test met hods, pr ocedur es, and t est val ues shal l be per f or med and eval uat ed i n accor dance wi t h NETA ATS, t he manuf act ur er ' s r ecommendat i ons, and par agr aph ent i t l ed " Fi el d Qual i t y Cont r ol " of each appl i cabl e speci f i cat i on sect i on. Test s i dent i f i ed as opt i onal i n NETA ATS ar e not r equi r ed unl ess ot her wi se speci f i ed. Equi pment shal l be pl aced i n ser vi ce onl y af t er compl et i on of r equi r ed t est s and eval uat i on of t he t est r esul t s have been compl et ed. Cont r act or shal l suppl y t o t he t est i ng or gani zat i on compl et e set s of shop dr awi ngs, set t i ngs of adj ust abl e devi ces, and ot her i nf or mat i on necessar y f or an accur at e t est and i nspect i on of t he syst em pr i or t o t he per f or mance of any f i nal t est i ng. Cont r act i ng Of f i cer shal l be not i f i ed at l east 14 days i n advance of when t est s wi l l be conduct ed by t he t est i ng or gani zat i on. Per f or m accept ance t est s and i nspect i ons on appl i cabl e equi pment and syst ems speci f i ed i n t he f ol l owi ng sect i ons:

a. Sect i on 26 32 14. 00 10 DI ESEL- GENERATOR SET, STATI ONARY 15- 300 KW, STANDBY APPLI CATI ONS. Funct i onal engi ne shut down t est s, v i br at i on base- l i ne t est , and l oad bank t est shal l not be per f or med by t he t est i ng or gani zat i on. These t est s shal l be per f or med by t he st ar t - up engineer.

b. Sect i on 33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON. Medi um vol t age cabl es and gr oundi ng syst ems onl y.

Apr i l 2019 Page 2 SECTI ON 26 08 00

c. Sect i on 26 36 00. 00 10 AUTOMATI C TRANSFER SWI TCHES

d. Sect i on 26 23 00 LOW VOLTAGE SWI TCHGEAR

3. 2 SYSTEM ACCEPTANCE

Fi nal accept ance of t he syst em i s cont i ngent upon sat i sf act or y compl et i on of accept ance t est s and i nspect i ons.

3. 3 PLACI NG EQUI PMENT I N SERVI CE

A r epr esent at i ve of t he appr oved t est i ng or gani zat i on shal l be pr esent when equi pment t est ed by t he or gani zat i on i s i ni t i al l y ener gi zed and pl aced i n ser vi ce.

- - End of Sect i on - -

Apr i l 2019 Page 3 SECTI ON 26 08 00

File details come from the government source that posted it. Updated .