32 01 22.pdf

PDF 17 KB Posted

Attached to
Tinker AFB MAC BOA WWYK230052, Replace Vault and Fuel Tank, B1032
Solicitation number
FA813725R0033
Issued by

About this file

This document is a technical specification for bituminous rejuvenation of pavement surfaces at Tinker Air Force Base. The specification details requirements for a chemical rejuvenating agent composed of a petroleum resin-oil base emulsified with water, with specific physical and chemical properties defined by ASTM test methods. The rejuvenation process involves preparing the surface by removing loose material, applying the rejuvenator at a rate of 0.06 gallons per square yard (with a ±20% variation), and spreading mineral aggregate to absorb excess material.

The specification outlines detailed technical requirements for equipment and application, including bituminous storage tanks capable of heating material under controlled temperatures, a bituminous distributor that can spray material in uniform laps, and power brooms and blowers. The mineral aggregate used must meet specific gradation requirements, with precise percentages passing through different sieve sizes. If the application rate is determined to be more than 20% below the approved rate, subsequent applications must be made within 24 hours to ensure adequate penetration into the pavement surface.

View the file

Other files

File Type Posted
10 44 16.pdf PDF
33 08 55.pdf PDF
Att12_230052_Submittal Register_r2.pdf PDF
03 39 00.00 10.pdf PDF
03 30 00.pdf PDF
32 13 14.pdf PDF
10_230052_SOW_BWR_Revision_r1.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
03 20 00.00 10.pdf PDF
31 23 16.pdf PDF
32 16 13.pdf PDF
07 92 00.pdf PDF
32 92 19.pdf PDF
33 52 40.pdf PDF
33 52 23.15.pdf PDF
32 31 13.pdf PDF
03 11 13.00 10.pdf PDF
32 11 23.pdf PDF
Att12_230052_Submittal Register_r2.xlsx XLSX spreadsheet
26 05 00.00 40.pdf PDF
32 12 10.1.pdf PDF
31 00 00.pdf PDF
31 23 06.pdf PDF
26 08 00.pdf PDF
26 00 00.00 20.pdf PDF
06 10 00.pdf PDF
33 56 10.pdf PDF
31 23 15.pdf PDF
32 92 23.pdf PDF
02 41 00.pdf PDF
32 12 10.2.pdf PDF
WWYK230052 RFI responses COR Signed.pdf PDF
Sign-in Sheet WWYK230052 B1132.pdf PDF
Solicitation - FA813725R0033.pdf PDF
Wage Determination.pdf PDF
Att13_230052_Drawings.pdf PDF
Att12_230052_Submittal Register_r1.xlsx XLSX spreadsheet
ENG-34-066-58-75.pdf PDF
2 EAL List - BLANK to Contractors.xlsx XLSX spreadsheet
Att10_230052_SOW_BWR_Revision_24 April.pdf PDF
Fire Pump from WWYK180027.pdf PDF
B1032 from WWYK180027 IFC PLAN SET.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB, OK TAFB Technical Specifications 2019

April 2019 Section 32 01 22 Page 1

SECTION 32 01 22

BITIMINOUS REJUVENATION

PART 1 GENERAL

1.1 Scope

This specification covers the rejuvenation of existing bituminous airfield pavements, roads, streets, parking areas, and other general applications by the use of a chemical rejuvenator.

1.2 Submittals

Government approval of all materials is required prior to use. The following is to be submitted in accordance with Section 01 33 00;

SUBMITTAL PROCEDURES: SD-03 Product Data SD-04 Samples SD-07 Certificates SD-08 Manufacturer’s Instructions

PART 2 PRODUCTS

2.1 Rejuvenator

The asphalt rejuvenating agent shall be composed of a petroleum resin-oil base uniformly emulsified with water and shall conform to the following physical and chemical requirements:

Property Test Method Requirement

Viscosity, S.F at 77 oF, sec. ASTM D 244 15 - 40

Residue, % 1 ASTM D 244(mod.) 0 – 65 (min)

Sieve Test, % ASTM D 244 (Mod.) 0.10 (max.)

Viscosity @ 140 oF, ASTM D 2170 80 - 500 Centistokes 2

Flash Point, Cleveland Open ASTM D 92 350 (min.)

Cup (COC), oF 3

1 ASTM D 244 Modified Evaporation Test for percent residue is made by heating 50 gm samples to 300 F until foaming ceases; then cool immediately and calculate results.

2 Viscosity on residue obtained from evaporation test.

3 Flash point on residue from evaporation test.

April 2019 Section 32 01 22 Page 2

2.2 Aggregate

Gradation of mineral aggregate shall meet the following requirements:

Sieve Percent by Designation Weight Passing No. 16 100 No. 30 40-75 No. 50 4-12 No. 100 0-5

PART 3 EXECUTION

3.1 Bituminous Storage Tanks

Bituminous Storage Tanks shall be capable of heating the bituminous material under effective and positive control at all times to the required temperature.

3.2 Bituminous Distributor

Bituminous Distributor shall be designed and equipped to spray the bituminous material in a uniform double to triple lap at the temperature recommended by the manufacturer, at variable widths, and at readily determined and controlled rates from 0.04 to 0.2 gallons per square yard, plus or minus 5 percent.

3.3 Brooms and Blowers

Brooms and Blowers shall be of the power type.

3.4 Preparation of Surface

Immediately before applying the rejuvenator, all loose material, dirt, clay, or other objectionable material shall be removed from the surface to be treated.

3.5 Application of Rejuvenator

The rejuvenator shall be uniformly applied over the surface at a rate of 0.06 gallons per square yard, with an allowable variation of plus or minus 20 percent. Materials shall be applied at the temperature recommended by the manufacturer.

3.6 Excess Rejuvenator Material

Approved mineral aggregate shall be provided by the Contractor and shall be spread in sufficient quantity to effectively blot up any excess rejuvenator material remaining on the treated pavement surface after 24 hours.

April 2019 Section 32 01 22 Page 3

3.7 Insufficient Rejuvenator Material

When it is determined by the Contracting Officer that the actual application rate of the rejuvenator is more than 20 percent below the approved application rate, subsequent application(s) shall be made within 24 hours to ensure adequate penetration into the pavement surface.

- End of Section -

Part 1 General
part 2 PRODUCTS
2.1 Rejuvenator
2.2 Aggregate
part 3 EXECUTION
3.1 Bituminous Storage Tanks
3.2 Bituminous Distributor
3.3 Brooms and Blowers
3.4 Preparation of Surface
3.5 Application of Rejuvenator
3.6 Excess Rejuvenator Material
3.7 Insufficient Rejuvenator Material