03 11 13.00 10.pdf

PDF 17 KB Posted

Attached to
Tinker AFB MAC BOA WWYK230052, Replace Vault and Fuel Tank, B1032
Solicitation number
FA813725R0033
Issued by

About this file

This technical specification document (Section 03 11 13.00 10) provides detailed requirements for structural cast-in-place concrete forming at Tinker Air Force Base in Oklahoma for a 2019 project. The specification covers formwork materials, system design, installation procedures, and quality control requirements, with key technical details including surface finish standards (SF-1.0 for non-public surfaces, SF-3.0 for public view surfaces), formwork design methodology based on ACI 347 guidelines, and specific requirements for fiber voids and form materials.

The document mandates specific technical standards for concrete forming, including compliance with American Concrete Institute (ACI) standards, use of factory-fabricated pan-form units for concrete joists and slabs, and precise installation requirements for fiber voids. Contractors must submit detailed documentation including shop drawings, form removal schedules, product data, and design calculations at least 10 days before fabrication. The specification emphasizes contractor responsibility for formwork design, engineering, and construction, with strict requirements for load-bearing capacity, material performance, and surface tolerances.

View the file

Other files

File Type Posted
10 44 16.pdf PDF
33 08 55.pdf PDF
Att12_230052_Submittal Register_r2.pdf PDF
03 39 00.00 10.pdf PDF
03 30 00.pdf PDF
32 13 14.pdf PDF
10_230052_SOW_BWR_Revision_r1.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
03 20 00.00 10.pdf PDF
31 23 16.pdf PDF
32 16 13.pdf PDF
07 92 00.pdf PDF
32 92 19.pdf PDF
33 52 40.pdf PDF
33 52 23.15.pdf PDF
32 31 13.pdf PDF
32 11 23.pdf PDF
Att12_230052_Submittal Register_r2.xlsx XLSX spreadsheet
26 05 00.00 40.pdf PDF
32 12 10.1.pdf PDF
31 00 00.pdf PDF
31 23 06.pdf PDF
26 08 00.pdf PDF
26 00 00.00 20.pdf PDF
06 10 00.pdf PDF
33 56 10.pdf PDF
32 01 22.pdf PDF
31 23 15.pdf PDF
32 92 23.pdf PDF
02 41 00.pdf PDF
32 12 10.2.pdf PDF
WWYK230052 RFI responses COR Signed.pdf PDF
Sign-in Sheet WWYK230052 B1132.pdf PDF
Solicitation - FA813725R0033.pdf PDF
Wage Determination.pdf PDF
Att13_230052_Drawings.pdf PDF
Att12_230052_Submittal Register_r1.xlsx XLSX spreadsheet
ENG-34-066-58-75.pdf PDF
2 EAL List - BLANK to Contractors.xlsx XLSX spreadsheet
Att10_230052_SOW_BWR_Revision_24 April.pdf PDF
Fire Pump from WWYK180027.pdf PDF
B1032 from WWYK180027 IFC PLAN SET.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 03 11 13. 00 10

STRUCTURAL CAST- I N- PLACE CONCRETE FORMI NG

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN CONCRETE I NSTI TUTE I NTERNATI ONAL ( ACI )

ACI 117 ( 2010; Er r at a 2011) Speci f i cat i ons f or Tol er ances f or Concr et e Const r uct i on and Mat er i al s and Comment ar y

ACI 301 ( 2010; ERTA 2015) Speci f i cat i ons f or St r uct ur al Concr et e

ACI 347 ( 2004; Er r at a 2008; Er r at a 2012) Gui de t o For mwor k f or Concr et e

ASTM I NTERNATI ONAL ( ASTM)

ASTM C578 ( 2015b) St andar d Speci f i cat i on f or Ri gi d, Cel l ul ar Pol yst yr ene Ther mal I nsul at i on

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

For mwor k; G For m Removal Schedul e; G

SD- 03 Pr oduct Dat a

For m Mat er i al s

SD- 04 Sampl es

Fi ber Voi ds; G

SD- 05 Desi gn Dat a

Calculations

SD- 06 Test Repor t s

Apr i l 2019 Page 1 SECTI ON 03 11 13. 00 10

Inspection

SD- 07 Cer t i f i cat es

Fi ber Voi ds

1. 3 DELI VERY, STORAGE, AND HANDLI NG

St or e f i ber voi ds above gr ound l evel i n a dr y l ocat i on. Keep f i ber voi ds dr y unt i l i nst al l ed and over l ai d wi t h concr et e.

PART 2 PRODUCTS

2. 1 SYSTEM DESCRI PTI ON

The desi gn, engi neer i ng, and const r uct i on of t he f or mwor k i s t he r esponsi bi l i t y of t he Cont r act or . Desi gn f or mwor k i n accor dance wi t h met hodol ogy of ACI 347 f or ant i c i pat ed l oads, l at er al pr essur es, and st r esses, and capabl e of wi t hst andi ng t he pr essur es r esul t i ng f r om pl acement and vi br at i on of concr et e. Compl y wi t h t he t ol er ances speci f i ed i n Sect i on 03 30 00 CAST- I N- PLACE CONCRETE, par agr aph TOLERANCES FOR FORM CONSTRUCTI ON. However , f or sur f aces wi t h an ACI Cl ass A sur f ace desi gnat i on, l i mi t t he al l owabl e def l ect i on f or f aci ng mat er i al bet ween st uds, f or st uds bet ween wal er s and wal er s bet ween br aci ng t o 0. 0025 t i mes t he span. Desi gn t he f or mwor k as a compl et e syst em wi t h consi der at i on gi ven t o t he ef f ect s of cement i t i ous mat er i al s and mi xt ur e addi t i ves such as f l y ash, cement t ype, pl ast i c i zer s, accel er at or s, r et ar der s, ai r ent r ai nment , and ot her s. Moni t or t he adequacy of f or mwor k desi gn and const r uct i on pr i or t o and dur i ng concr et e pl acement as par t of t he Cont r act or ' s appr oved Qual i t y Cont r ol Pl an. Submi t desi gn anal ysi s and cal cul at i ons f or f or m desi gn and met hodol ogy used i n t he desi gn. Submi t at l east 10 days ei t her bef or e f abr i cat i on on si t e or bef or e del i ver y of pr ef abr i cat ed f or ms.

2. 2 FORM MATERI ALS

Submi t manuf act ur er ' s dat a, i ncl udi ng l i t er at ur e descr i bi ng f or m mat er i al s, accessor i es, and f or m r el easi ng agent s.

2. 2. 1 Formwork

Compl y wi t h ACI 301 Sect i on 2. Pr ovi de f or sur f aces not exposed t o publ i c v i ew a sur f ace f i ni sh SF- 1. 0. Pr ovi de f or sur f aces exposed t o publ i c v i ew a sur f ace f i ni sh SF- 3. 0. Pat ch hol es and def ect s i n accor dance wi t h ACI 301. Submi t f or m r emoval schedul e i ndi cat i ng el ement and mi ni mum l engt h of t i me f or f or m r emoval .

2. 2. 2 Ret ai n- I n- Pl ace Met al For ms

Use r et ai n- i n- pl ace met al f or ms f or concr et e s l abs and r oof s as speci f i ed i n Sect i on 05 30 00 STEEL DECKS.

2. 2. 3 Pan- For m Uni t s

Use f act or y- f abr i cat ed pan- f or m uni t s of t he appr oxi mat e sect i on i ndi cat ed f or one- way or t wo- way concr et e j oi st and sl ab const r uct i on. Uni t s must consi st of st eel or mol ded f i ber gl ass concr et e f or m pans. Fur ni sh c l osur e uni t s as r equi r ed.

Apr i l 2019 Page 2 SECTI ON 03 11 13. 00 10

2. 2. 4 Fi ber Voi ds

Fi ber voi ds must be t he pr oduct of a r eput abl e manuf act ur er r egul ar l y engaged i n t he commer ci al pr oduct i on of f i ber voi ds. Const r uct t he voi ds of doubl e f aced, cor r ugat ed f i ber boar d. Fabr i cat e t he cor r ugat ed f i ber boar d of wet st r engt h paper l i ner s, i mpr egnat ed wi t h par af f i n, and l ami nat ed wi t h moi st ur e r esi st ant adhesi ve, wi t h a boar d st r engt h of 275 psi . Voi ds whi ch ar e i mpr egnat ed wi t h par af f i n af t er const r uct i on, i n l i eu of bei ng const r uct ed wi t h par af f i n i mpr egnat ed f i ber boar d, ar e accept abl e. Desi gn voi ds t o suppor t not l ess t han 1000 psf . To pr event separ at i on dur i ng concr et e pl acement f i ber voi ds, assembl e wi t h st eel or pl ast i c bandi ng at 4 f eet on cent er maxi mum, or by adequat e st apl i ng or gl ui ng as r ecommended by t he manuf act ur er . Fi ber voi ds pl aced under concr et e s l abs and t hat ar e 8 i nches i n dept h may be heavy dut y " waf f l e box" t ype, const r uct ed of par af f i n i mpr egnat ed cor r ugat ed f i ber boar d.

Submi t one sampl e uni t of f i ber voi ds pr i or t o i nst al l at i on of t he voi ds and cer t i f i cat es at t est i ng t hat f i ber voi ds conf or m t o t he speci f i ed requirements.

2. 3 FI BER VOI D RETAI NERS

2. 3. 1 Pol yst yr ene Ri gi d I nsul at i on

Pol yst yr ene r i gi d i nsul at i on must conf or m t o ASTM C578, Type V, VI , or VI I , squar e edged. Si ze: 1- 1/ 2 i nches t hi ck by 16 i nches i n hei ght by 3 f eet i n l engt h, unl ess ot her wi se i ndi cat ed.

2. 3. 2 Pr ecast Concr et e

Pr ecast concr et e uni t s must have a compr essi ve st r engt h of not l ess t han 2500 psi , r ei nf or ced wi t h 6 i nch by 6 i nch by W1. 4 WWF wi r e mesh, and 12 i nches ( hei ght ) by 3 f eet ( l engt h) by 1- 5/ 8 i nches ( t hi ckness) i n s i ze unl ess i ndi cat ed.

PART 3 EXECUTI ON

3. 1 INSTALLATION

3. 1. 1 Formwork

Compl y wi t h ACI 301 Sect i on 2 wi t h sur f ace t ol er ances i n accor dance wi t h

ACI 117.

3. 1. 2 Fi ber Voi ds

Pl ace voi ds on a smoot h f i r m dr y bed of sui t abl e mat er i al , t o avoi d bei ng di spl aced ver t i cal l y, and set t i ght , wi t h no buckl ed car t ons, i n or der t hat hor i zont al di spl acement cannot t ake pl ace. Seal t he ends of each sect i on of voi d by di ppi ng i n par af f i n, wi t h any addi t i onal cut t i ng of voi ds at t he j obsi t e f i el d di p i n t he same t ype of seal er , unl ess l i ner s and f l ut es ar e compl et el y i mpr egnat ed wi t h par af f i n. Pr i or t o pl aci ng r ei nf or cement , cover t he ent i r e f or med ar ea f or s l abs wi t h a 4 x 8 f eet mi ni mum f l at sheet s of f i ber voi d cor r ugat ed f i ber boar d. Seal j oi nt s wi t h a moi st ur e r esi st ant t ape havi ng a mi ni mum wi dt h of 3 i nches. I f voi ds ar e dest r oyed or damaged and ar e not capabl e of suppor t i ng t he desi gn l oad, r epl ace pr i or t o pl aci ng of concr et e.

Apr i l 2019 Page 3 SECTI ON 03 11 13. 00 10

3. 1. 3 Fi ber Voi d Ret ai ner s

I nst al l f i ber voi d r et ai ner s, cont i nuousl y, on bot h s i des of f i ber voi ds pl aced under gr ade beams i n or der t o r et ai n t he cavi t y af t er t he f i ber voi ds bi odegr ade.

3. 2 INSPECTION

I nspect f or ms and embedded i t ems i n suf f i c i ent t i me pr i or t o each concr et e pl acement t o cer t i f y t o t he Cont r act i ng Of f i cer t hat t hey ar e r eady t o r ecei ve concr et e. Repor t t he r esul t s of each i nspect i on i n wr i t i ng.

Submi t f i el d i nspect i on r epor t s f or concr et e f or ms and embedded i t ems.

- - End of Sect i on - -

Apr i l 2019 Page 4 SECTI ON 03 11 13. 00 10

File details come from the government source that posted it. Updated .