This is a solicitation for an indefinite-delivery, indefinite-quantity contract to provide Air Damage Repair materials to the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency. Required products include ADR kits, concrete release agent packaged in 5-gallon buckets, and shipping services. The estimated contract value is between $400,000 to $500,000. Offerors must submit proposals by May 17, 2021 responding to factors covering technical approach, past performance, and pricing. The agency intends to make a single award to the lowest priced technically acceptable offeror with acceptable past performance and determined responsible. The contract will have a 5-year ordering period for supplies delivered to locations in the United States and overseas.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix YY Release Agent, Concrete, 5-gal bucket
1. Introduction: Under the ADR Modernization Program, concrete release agent is used to protect tools, equipment and metal forms from building up material during concrete construction operations.
2. Concrete Release Agent
2.1. The contractor shall verify the concrete release agent is a ready-to-use, petroleum based, chemically neutral, diesel free material.
2.1.1. The contractor shall verify the concrete release agent is packaged in 5-gal buckets with a lid. The lid must contain a retractable spout for easy application.
2.2. The concrete release agent unit of issue for this IDIQ is one (1) each.
2.3. If orders are larger than five (5) buckets, material shall be delivered on a pallet. A single pallet shall not exceed twelve (12) buckets.
2.4. Buckets shall be secured to the pallet with poly strapping (plastic banding straps).
2.5. Pallets shall be shrink wrapped with plastic. Plastic wrap shall be a minimum of 6-mil.
2.6. The contractor shall include a copy for the Safety Data Sheets (SDS) with all concrete release agent Task Orders.