Appendix PP - Expansion Material 4-in x 0.pdf
PDF 159 KB Posted
- Attached to
- Air Damage Repair (ADR) Material
- Solicitation number
- FA805121R3002
About this file
This is a request for proposal from the Department of the Air Force Materiel Command Installation Contracting Agency for Air Damage Repair materials. The solicitation seeks fixed price proposals for ADR kits, shipping services, and related items. Proposals are due by May 17, 2021 and must not exceed page limits. The agency intends to make a single award to the lowest price technically acceptable offeror with acceptable past performance and responsibility. The total small business set-aside contract will have a base period of five years for ordering ADR materials and services to support the ADR Modernization Program. Pricing will be evaluated for reasonableness, balance, and total evaluated price. Technical factors include meeting specifications and providing a shipping and logistics plan. Relevant past performance within the last five years will also be considered. The solicitation includes numerous FAR and DFARS provisions and clauses.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix PP Expansion Material; 4-in x 0.5-in x 10-ft
1. Introduction. Under the ADR Modernization Program, when expansion joints are required within a pavement, joint assemblies supporting both expansion material and dowels will be installed before placing concrete. Accurate location and alinement of expansion material and dowels are necessary for proper functioning of joints.
2. Expansion Material.
2.1. The contractor shall verify that the expansion material be made from cane or other suitable fibers of a cellulosic nature securely bound together and then uniformly saturated with asphalt; or strips formed from granulated cork securely bound together by a suitable asphalt binder and encased between two (2) layers of saturated felt or two (2) layers of glass-fiber felt.
2.2. The contractor shall verify that the expansion material be of such character as not to be deformed or broken by twisting, bending, or other ordinary handling when exposed to atmospheric conditions.
2.3. The contractor shall verify that the expansion material width is 4-in.
2.4. The contractor shall verify that the expansion material thickness is 0.5-in.
2.5. The contractor shall verify that the expansion material length is 10-ft.
2.6. Expansion material, 4-in x 0.5-in x 10-ft unit of issue shall be a set (ST) of eighteen
(18) each.
File details come from the government source that posted it. Updated .