Appendix GG - FRP Grout Material.pdf

PDF 396 KB Posted

Attached to
Air Damage Repair (ADR) Material
Solicitation number
FA805121R3002
Issued by

About this file

This solicitation is for an indefinite delivery/indefinite quantity contract for Air Damage Repair material kits and related shipping services. The Air Force seeks to award a single total small business set-aside contract for a base period of five years. Required products include ADR kits, tri-talon anchors, FRP grout material, and related items. Offerors must meet specifications in Attachments A through CCC and provide pricing on the attached price sheet. Technical proposals are limited to 50 pages and past performance to 10 pages. The closing date for proposals is 17 May 2021. Award will be made to the lowest price technically acceptable offeror with acceptable past performance and responsibility determination.

View the file

Other files

File Type Posted
ADR Materials price sheet.xlsx XLSX spreadsheet
Questions and Answers 2.docx DOCX document
Questions and Answers 2.docx DOCX document
Questions and Answers 1.docx DOCX document
Combined Synopsis Solicitation FA8051-21-R-3002 ADR Materials QA1.docx DOCX document
Appendix DD - Expedient Spall Repair Material.pdf PDF
Appendix II - FRP Grout material 5-ft ISO.pdf PDF
Appendix UU - Yellow Airfield Paint 5-gal Bucket.pdf PDF
Appendix CCC - Asphalt Cold Patch 50-lb bucket.pdf PDF
Appendix S - Rapid Set Concrete in 5-gal Bucket.pdf PDF
Appendix AA - Pelletized Asphalt 5-gal Bucket.pdf PDF
Appendix H - Wire Basket Top.pdf PDF
Appendix P - Supersack Lined 3-ft x 3-ft x 3-ft.pdf PDF
Appendix NN - Fast Trac 246 20-ft ISO.pdf PDF
Offeror Representations and Certifications attachement FA8051-21-R-3002.docx DOCX document
Appendix EE - Expedient Spall Repair 5-gal Bucket.pdf PDF
Appendix U - Rapid Set Concrete 20-ft ISO.pdf PDF
Appendix LL - Fast Trac 246 Concrete 5-gal Bucket.pdf PDF
Appendix XX - Mineral Spirits 1-gal.pdf PDF
Appendix KK - Fast Trac 246 Training Capping Material.pdf PDF
Appendix I - Wire Basket Bottom.pdf PDF
Appendix E - Inflatable Dunnage Bag.pdf PDF
Appendix G - Supersack Rack.pdf PDF
Appendix YY - Release Agent Concrete 5-gal bucket.pdf PDF
Appendix Z - Pelletized Asphalt Material.pdf PDF
Appendix BB - Pelletized Asphalt Supersack.pdf PDF
Appendix MM - Fast Trac 246 Training Capping Material Supersack.pdf PDF
Appendix OO - Joint Sealant 29-oz Tube.pdf PDF
Appendix W - Flowable Fill 5-gal Bucket.pdf PDF
Appendix SS - Backer Rod.pdf PDF
Appendix VV - White Airfield Paint 5-gal Bucket.pdf PDF
Appendix PP - Expansion Material 4-in x 0.pdf PDF
Appendix FF - Expedient Spall Repair material 5-ft ISO.pdf PDF
Appendix M - Snap Hook Ratchet Strap HD 2-in.pdf PDF
FA8051-21-R-3002 ADR Materials SOW.docx DOCX document
Appendix RR - Plastic Zip Strip 0.5-in x 0.pdf PDF
Appendix C - ISO Container 8-ft x 8-ft x 5-ft FRP Grout Kit.pdf PDF
Appendix Q - Supersack Unlined 2-ft x 2-ft x 2-ft.pdf PDF
Appendix A - ISO Container 8-ft x 8-ft x 20-ft.pdf PDF
Appendix JJ - Citric Acid.pdf PDF
Appendix ZZ - Release Agent Asphalt 5-gal bucket.pdf PDF
Appendix B - ISO Container 8-ft x 8-ft x 5-ft Spall Repair Kit.pdf PDF
Appendix AAA - Curing Compound 5-gal bucket.pdf PDF
FA8051-21-R-3002 ADR Materials price sheet.xlsx XLSX spreadsheet
Appendix R - Rapid Set Concrete Material.pdf PDF
Appendix J - Bucket Riser.pdf PDF
Appendix Y - Flowable Fill 20-ft ISO.pdf PDF
Appendix HH - FRP Grout 5-gal Bucket.pdf PDF
Appendix TT - Black Airfield Paint 5-gal Bucket.pdf PDF
Appendix V - Flowable Fill Material.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix GG FRP Grout Material

1. Introduction. Under the ADR Modernization Program, Fiberglass Re-enforced Polymer (FRP) matting system, grout material is utilized within the FRP grout kit. FRP grout material is used to secure tri-talon anchors in the asphalt airfield pavement structure for the FRP matting system. The FRP mortal material is packaged in 5-gal buckets to allow mixing in close proximity to FRP matting system being installed on airfields.

2. Spall Repair/FRP Grout Material.

2.1. The Engineering Research and Development Center (ERDC), Vicksburg, MS, is the Department of Defense’s lead pavement research facility for roadways, permanent airfields, contingency airfields, and railroads. ERDC is the approving agency for all Air Force ADR related repair materials. Due to the critical nature of performing emergency airfield repairs, presumably after an act of war, and the requirement to support heavy aircraft loads, materials must be pre-qualified for procurement and use. Failure of the materials to meet performance metrics could result in failure to restore flight operations, failure in contingency operations plans, damage to or loss of individual aircraft, material and personnel. Currently, nine products meet the spall repair/grout performance specifications. Although, contractor must verify product compliance with AFCEC/CXXM per task order.

2.1.1. ERDC/AFCEC recommend using any of the approved material above with aggregate being smaller than 3/8-inch minus, such as material #7 on the list (Rapid Set Mortar Mix by CTS Cement Corp); due to the nature of placing the mortar material for securing the tri-talon anchors.

2.2. Feasibility:

2.2.1. The minimum packing requirements are:

2.2.1.1.5-gal Bucket - The bucket must allow for the addition of water and mixing operation.

Buckets will be shipped palletized and shrink wrapped.

2.2.2. Shelf Life –The minimum shelf life requirements for the material are:

2.2.2.1.Outside Covered – minimum 18 months.

2.2.2.2.ISO Container Stored – minimum 36 months.

2.2.3. Safety/Hazardous Chemical Issues – The material’s SDS will be evaluated against that of standard cementitious material. If additional precautions are required, the effect to the spall repair process will be evaluated and if deemed unacceptable, the material will be rejected.

3. Tri-Service Spall Repair/Grout Certification Requirements

Test Description Testing Specifics Criteria

Compressive Strength ASTM C39

≥ 3000 psi @ 2-hr ≥ 5000 psi @ 1 day ≥ 5000 psi @ 7 day ≥ 5000 psi @ 28 days

Flexural Strength ASTM C78

≥ 350 psi @ 2-hr ≥ 600 psi @ 7 days ≥ 600 psi @ 28 days

Bond Strength ASTM C882 Repair Material to Repair Material ≥ 1000 psi @ 1 day

Repair Material to Ordinary PCC ≥ 1000 psi @ 1 day

Modulus of Elasticity ASTM C469 2 ≤ x ≤ 6 Mpsi @ 2-hr 2 ≤ x ≤ 6 Mpsi @ 28 day

Time of Set ASTM C191 Initial Set: ≥ 15-min Final Set: 25 - 35-min

Slump ASTM C143 Within 5-min of added water ≥ 3 inch

Length Change ASTM C157 Stored in air - 0.04% ≤ x ≤ +0.03%

@ 28 day Stored in water Coeff. of Thermal Expansion

ASTM C 531

Begin test @ 7 days ≤ 12∙10‐6 °F‐1

Shrinkage Potential ASTM C1581 ≤ 40 με @ 14 days

No cracking @ 28 days

File details come from the government source that posted it. Updated .