Appendix Y - Flowable Fill 20-ft ISO.pdf

PDF 432 KB Posted

Attached to
Air Damage Repair (ADR) Material
Solicitation number
FA805121R3002
Issued by

About this file

This is a request for proposal from the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency for an Air Damage Repair Material indefinite-delivery, indefinite-quantity contract with a five-year ordering period. The solicitation requests proposals for kits containing 20-foot ISO containers pre-packed with 12 supersacks each filled with 3,000 pounds of flowable fill material, racks, cargo bars, desiccant strips, an inflatable dunnage bag, and combination locks. Proposals are due by May 17, 2021 and award will be made to the lowest price technically acceptable offeror with acceptable past performance that is determined responsible. Pricing is firm-fixed price for the kits on the attached price sheet with estimated annual quantities for evaluation purposes only. The total small business set-aside contract has a minimum guarantee of $400,000 to $500,000 for the first order and allows orders up to $10 million individually or in combination.

View the file

Other files

File Type Posted
ADR Materials price sheet.xlsx XLSX spreadsheet
Questions and Answers 2.docx DOCX document
Questions and Answers 2.docx DOCX document
Questions and Answers 1.docx DOCX document
Combined Synopsis Solicitation FA8051-21-R-3002 ADR Materials QA1.docx DOCX document
Appendix DD - Expedient Spall Repair Material.pdf PDF
Appendix II - FRP Grout material 5-ft ISO.pdf PDF
Appendix UU - Yellow Airfield Paint 5-gal Bucket.pdf PDF
Appendix CCC - Asphalt Cold Patch 50-lb bucket.pdf PDF
Appendix S - Rapid Set Concrete in 5-gal Bucket.pdf PDF
Appendix GG - FRP Grout Material.pdf PDF
Appendix AA - Pelletized Asphalt 5-gal Bucket.pdf PDF
Appendix H - Wire Basket Top.pdf PDF
Appendix P - Supersack Lined 3-ft x 3-ft x 3-ft.pdf PDF
Appendix NN - Fast Trac 246 20-ft ISO.pdf PDF
Offeror Representations and Certifications attachement FA8051-21-R-3002.docx DOCX document
Appendix EE - Expedient Spall Repair 5-gal Bucket.pdf PDF
Appendix U - Rapid Set Concrete 20-ft ISO.pdf PDF
Appendix LL - Fast Trac 246 Concrete 5-gal Bucket.pdf PDF
Appendix XX - Mineral Spirits 1-gal.pdf PDF
Appendix KK - Fast Trac 246 Training Capping Material.pdf PDF
Appendix I - Wire Basket Bottom.pdf PDF
Appendix E - Inflatable Dunnage Bag.pdf PDF
Appendix G - Supersack Rack.pdf PDF
Appendix YY - Release Agent Concrete 5-gal bucket.pdf PDF
Appendix Z - Pelletized Asphalt Material.pdf PDF
Appendix BB - Pelletized Asphalt Supersack.pdf PDF
Appendix MM - Fast Trac 246 Training Capping Material Supersack.pdf PDF
Appendix OO - Joint Sealant 29-oz Tube.pdf PDF
Appendix W - Flowable Fill 5-gal Bucket.pdf PDF
Appendix SS - Backer Rod.pdf PDF
Appendix VV - White Airfield Paint 5-gal Bucket.pdf PDF
Appendix PP - Expansion Material 4-in x 0.pdf PDF
Appendix FF - Expedient Spall Repair material 5-ft ISO.pdf PDF
Appendix M - Snap Hook Ratchet Strap HD 2-in.pdf PDF
FA8051-21-R-3002 ADR Materials SOW.docx DOCX document
Appendix RR - Plastic Zip Strip 0.5-in x 0.pdf PDF
Appendix C - ISO Container 8-ft x 8-ft x 5-ft FRP Grout Kit.pdf PDF
Appendix Q - Supersack Unlined 2-ft x 2-ft x 2-ft.pdf PDF
Appendix A - ISO Container 8-ft x 8-ft x 20-ft.pdf PDF
Appendix JJ - Citric Acid.pdf PDF
Appendix ZZ - Release Agent Asphalt 5-gal bucket.pdf PDF
Appendix B - ISO Container 8-ft x 8-ft x 5-ft Spall Repair Kit.pdf PDF
Appendix AAA - Curing Compound 5-gal bucket.pdf PDF
FA8051-21-R-3002 ADR Materials price sheet.xlsx XLSX spreadsheet
Appendix R - Rapid Set Concrete Material.pdf PDF
Appendix J - Bucket Riser.pdf PDF
Appendix HH - FRP Grout 5-gal Bucket.pdf PDF
Appendix TT - Black Airfield Paint 5-gal Bucket.pdf PDF
Appendix V - Flowable Fill Material.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix Y

Flowable Fill, 20-ft ISO

1. Introduction. The Air Force Civil Engineer Center (AFCEC) has developed an updated

Airfield Damage Repair (ADR) concept of operations under the ADR Modernization

Program that provides updated capabilities to rapidly repair damaged airfield pavements.

2. Scope.

2.1. The contractor shall purchase, modify, prepare, stock, and deliver 20-ft long International

Standards Organization (ISO) cargo containers to selected AF locations in accordance with the detailed technical requirements of this SOW.

2.2. Flowable Fill, ISO, unit of issue for this IDIQ shall be a kit to include all of the following items:

2.2.1. One (1) each 20-ft ISO container; the contractor shall verify that all ISO containers meet the specifications and follow all procurement processes in Appendix A.

2.2.2. Twelve (12) each 3,000-lb supersacks; the contractor shall verify that all 3,000-lb supersacks meet the specifications in Appendix P.

2.2.3. Twelve (12) each supersack racks; the contractor shall verify that all supersack racks meet the specifications in Appendix G.

2.2.4. Four (4) each cargo bars; the contractor shall verify that all cargo bars meet the specifications in Appendix D.

2.2.5. Four (4) each desiccant strips; the contractor shall verify that all desiccant strips meet the specifications in Appendix F.

2.2.6. One (1) each inflatable dunnage bag; the contractor shall verify that all inflatable dunnage bags meet the specifications in Appendix E. The intent is to keep the top rows of material from side-to-side movement. The contractor shall install the inflatable dunnage bag based on packing diagram in paragraph 3.

2.2.7. Twelve (12) each supersacks filled with Flowable Fill; the contractor shall verify that all Flowable Fill meets the specifications in Appendix V. The packing diagram is depicted in paragraph 3.

2.2.8. Two (2) each locks, combination; after completion of packing, the contractor shall lock the cargo doors using two locks that meets the specification in Appendix O. The combination to be used will be provided per task order.

2.3. The contractor shall provide all loading and unloading capability for fully packed and sealed ISO containers with a 44,000-lbs maximum gross weight to include place of origin, shipping dock, and final destination. The contractor shall weigh fully loaded ISO containers and provide weigh scale documentation to transport driver. The contractor shall provide door to door delivery without assistance.

2.4. The contractor shall provide monthly updates to the 772 ESS/PKD and AFCEC/CXXM with the first report due not later than 30 calendar days after task order award and every

30 days thereafter until task order completion. Each task order monthly update shall include at minimum an updated overall project schedule and status of all containers.

3. Packing Layout.

Desiccant Strips

(4 per ISO)

Metal Racks with Supersacks

(single layer)

Cargo Bars

(double layer)

(double layer)

Inflatable Dunnage Bag

(1 per ISO)

(single layer)

ISO Interior Dimensions

19'-10"(L) x 8'(W) x 8'-6"(H)

Desiccant Poles

Racks with

Supersacks

(12 each per ISO)

Inflatable Dunnage Bag

(1 per ISO)

Cargo Bars

File details come from the government source that posted it. Updated .