RESPONSES_TO_QUESTIONS_FOR_MACC-SOLICITATION-FA5685-14-R-0013_-4_July_14.rtf

RTF text file 411 KB Posted

Attached to
MACC Solicitation # FA5685-14-R-0013
Solicitation number
FA5685-14-R-0013
Issued by

About this file

See Attachment.

Text of this file

RESPONSESE TO QUESTIONS FOR MACC “FA5685‐14‐R‐0013” PROPOSAL-4 July 2014

Resolution of LJYC 10‐1052 RPR Replace Roll‐up Doors, ODC Bldg. #977 project’s concept drawings are not big enough to read. Could you please provide bigger scanned copy of drawings?

39 CES/CECED Response: AutoCadd dwgs provided.

Contents of 3.3. DESIGN DEVELOPMENT (65%) SUBMISSION sections in Attachement 2_MACC_Design_Guide_2014.doc file were described as 100% completion instead of 65%. Same issue under contents of 3.4. CONTRACT DOCUMENTS (95%) SUBMISSION section. Under this section completion percentage of contents were described as 100% instead of 95%. What they mean?

39 CES/CECED Response: At the 65% submittal, the submittal documents are not preliminary in nature. The 65% is a “draft final” submittal. The 95% submittal should only be to clarify any ambiguities and fix formating problems. The 100% submittal should be the polished package, as it will be submitted to CONS, more of a “back check of any final errors identified at the 95% submittal.

We would like to confirm one item from the scope of the mock project, "Renovate Building 444" The following item in SOW combines many items to be demolished in different areas; we wanted to be sure not to miss some part of the design. Basing on this and other sections in SOW, we understand that mechanical room will totally be cleaned from all equipment and piping including the existing domestic hot and cold water piping. All the fan coil units in the rooms c/w drain (condense) piping, heating/cooling water piping and all ventilation related items in toilets shall also be demolished. Domestic hot/cold water piping, waste water piping and fixtures in toilets and building other than mechanical room contents shall NOT be demolished. New hot water generations system and replaced hot/cold water piping in mechanical room will be connected to existing plumbing system in the building. There is NO REPLACEMENT/REDESIGN of whole plumbing system in the building. Please confirm.

1.1.3.2. Design removal and replacement of existing piping system for hot and cold water system at mechanical room, existing domestic hot water generator system c/w piping and insulation, waste water system c/w air vent, existing fan coil units and their related piping at rooms, existing exhaust and ventilation system at the toilets, all ductwork etc 39 CES/CECED Response: Please consider REPLACEMENT&REDESIGN of whole plumbing system in the building.

Please refer to Solicitation No. FA5685‐14‐R‐0013 page 39 of 46, para (b) Last Sentence, which reads “Relevancy in regards to magnitude includes contracts/projects with a value of up to

$1.5M annually, or a combined value of $1.5M annually.

Does this mean that relevant projects in scope exceeding #1.5M per project cannot be submitted for as a Past Performance? Also combined value of projects if exceeds $1.5M annually will they be considered un‐acceptable?

Pease clarify this statement and if possible demonstrate it with an example to avoid confusion.

Response: The $1.5M can reflect one individual project or a combination of projects over a year timeframe.

Please refer to page 7 of 46, para CLIN/MINIMUM/MAXIMUM first sentence where it reads the guaranteed minimum order amount for this contract is $250,00 should this have been

$2.500,00. Please verify

Response: The guaranteed minimum order amount for this contract will be $250.00.

Shall we be correct in assuming that the Net Amounts indicated on page 3,4,5&6 of 46 shall be filled in for their corresponding years deriving from the summation of Price Schedule and be all added up and shown on SF Form 1442 block 22.

Response: Yes the amounts on the referenced pages should reflect the net amounts for each corresponding years deriving from the summation of the Schedule of Itemsand be all added up and shown on SF Form Block 22.

The provided cost breakdown documents (INC 1101) on the back side of the page indicates %10 for overhead and %10 for profit for the Seed projects. Is it compulsory to use these figures?

Response: Please disregard the 10% figure for overhead and 10% for profit on the back of the form.

Please refer to page 40 of 46, the Table pertaining to the page count of the Volumes. Volume II is limited to 75 pages where 10 pages per seed project and 45 pages for Mock Design project is specified, In this case can we assume that QCP is not subject to the page count?

Response: Yes, the QCP is not considered part of the page count. Once QCP will be sumitted to cover the MACC contract itself and will not be required for invidual projects. If you unique requirments task orders arise and require unique QCP, that will addressed at the stage of issuing the RFQ for that requirement.

Content of the QCP (para 3.2.1) is generally prepared for a %100 design complete and or awarded projects. If we are to prepare the QCP for an open end project we shall not be able to furnish some of the requirements such as Definable Features of Work since we do not know what the project is and what the Definable Features of Work are.

Response: Each offeror should develop the QCP based off all anctipate work that will be accomplished under the MACC. The Goal of the proposed QCP is not to cover just the identified seed projects, but to also cover projects that would fall under any project that would be considered gerneral contruction. As stated in para 3.2.1 (i), the list will be agreed upon during the project cordination meeting. Once QCP will be sumitted to cover the MACC contract itself and will not be required for invidual projects.

Will separate QC plans be submitted for each seed project? If yes, 10 pages is not sufficient for each seed project. If no, one General QCP of the firm will be acceptable and the number of pages limited to?

Response: Once QCP will be sumitted to cover the MACC contract itself and will not be required for invidual projects. Each submitted QCP should have a limit 25 pages.

IAW 01.45.04.00 par 3.2.1, content of the QCP resumes of the QC personnel should be submitted with this proposal. This will increase the page number of the QCP. Will these pages for the resume be counted in the page limitation?

Response: The pages for resumes will not be counted in the page limitation.

Shop Drawings, Material Catalogs and Technical Literatures included in the 10 page limitation of the Technical Capabilities?

Response: All offerors will be limited to 25 pages per seed project to include Shop Drawings, Material Catalogs and Technical Literatures.

If sub‐contracting plan is requested, under what cover it will be included? Will there be any page limitation?

Response: Sub-contracting plans should be submitted under the cover for the individual seed project or mock design project for each it will be used. Sub-contracting plans will be fall within the same page limitation of the Techncial Capability limitation of 25 pages.

Are sub‐contracting commitment letters included in the page limitations?

Response: Sub‐contracting commitment letters will not be included in the page limitations.

Will there be a compensation for the efforts and expenses that will be incurred in the design of Mock Project, although classified as %65 but actually should be considered as %100 since all drawings, specifications, calculations and Cost Estimate are requested to be at % 100 levels, as depicted in the Design Guide for MACC.

Based on our experiences, the Government compensates a certain amount of $s, for the expenses incurred for the design, even to the non‐awardees.

Response: Offerors will not be compensated for cost associated with preparation for the Mock Design project.

We believe we can reach a more reliable cost for the basic year and for the option years of the price schedule if the items listed are identified with their special characteristics such as their makes, model and sizes. Otherwise it will be beguiling and cause wrong evaluations. As it is, the items listed in the schedule are described by names and their prices may vary due to the size, make and origin. Could these be clarified and supplemented with further information?

Architectural Line item 1: Lara Glass, Glass Brick 80mm thick, Clear Wavy
Architectural Line item 3: Izocam Glasswool WallInsulation, 5 cm thick
Architectural Line item 4: Izocam Extruded Polystrene Foam Insulation, 5cm thick
Architectural Line item 23: a)Armstrong Fine Fissured, 9121M
b)Armstrong Optima, 2372M
Architectural Line item 24:Armstrong Ceramaguard

The site visit for this project has been conducted on 25 June 2014 and the proposals are expected to be turned in by 14 July 2014. Which gives us only 19 days to prepare a complicated project design (Mock project) along with other documents. This seems to be insufficient proposal preparation duration. Could the proposal due date be extended to a future date.

Seed Project#3 “LJYC_11‐1009 Repair Roof Bldg.”; Is it required to excavate around the perimeter of Bldg.475 and install stranded bare copper for grounding?

The contractor must only test if the grounding is good. The project does not include replacement of the building perimeter grounding.

In the Schedule of Items Architecture Item#12 the Brand Name & Properties of Overhead Doors/Roll‐up Doors (360x400) has not been defined, would you please give more information.

Hormann Decotherm Roll-up Door

In the Schedule of Items Architecture Item#13 the Properties of Automatic Aluminum Sliding Glass Doors (300x220) has not been defined, would you please give more information.

Geze Sliding Door, EC Drive (300x220cm)

In the Schedule of Items Architecture Item#19 the Brand Name & Properties of Electronic Card Operated Door Lock has not been defined, would you please give more information.

Kaba C-Lever Compact

In the Schedule of Items Architecture Item#46 the Properties of Stainless Steel Sink (Franke) has not been defined, would you please give more information.

Franke AMX 611, Inox

Would you please clarify the dimensions of Roll Up Doors for the Bldg#977.

AutoCadd dwgs provided.

In the Schedule of Items Pumps Item#1, 2, 3, 4, 5 the Properties of Vertical Pumps, Submersible Pumps, Diesel/Natural Gas Fueled Engine Pump, Centrifugal Pumps, Sump Pump has not been defined, would you please give more information.

39 CES/CECED Response:

Item:1 Q :25 m3/h ,Hm:48 mss Item:2 Q :140 m3/h ,Hm:70 mss (Stainless steel) Item:3 Q :290 m3/h ,Hm:40 mss c/w diesel motor drives Item:4 Q :40 m3/h ,Hm:30 mss (Stainless steel) Item:5 Q :30 m3/h ,Hm:20 mss All pumps must be mechanical sealed type.

In the Schedule of Items Fire Protection System Item#1 the Properties of Wet Chemical Fire Hood Suppression System has not been defined, would you please give more information.

39 CES/CECED Response:

Fire suppression system full load type DUAL AGENT WET CHEMICAL (ANSUL PIRANHA 10 OR EQUAL

In the Schedule of Items Fire Protection System Item#3 the Properties of Fire Pumps has not been defined, would you please give more information.

39 CES/CECED Response:

575 GPM 45 PSI -3000 RPM, 20 HP, 380 V, 50 Hz, CLASS F INSULATION.

In the Schedule of Items HVAC Item#1 the Properties of Boiler has not been defined, would you please give more information.

39 CES/CECED Response:

Viessmann VITOPLEX 200 for diesel fuel (120 kw) or equal

In the Schedule of Items HVAC Item#14 the Properties of Water‐based Liquid Chillers has not been defined, would you please give more information.

39 CES/CECED Response:

Air cooled water chiller, 114 kw cooling capacity for Condenser Ambient Temperature (40 °C) and Evaporator Leaving Temperature(9 °C) , 380 V , 50 hZ, power input:40.2 kw, R-410 gas, COP :2.84 , Scroll compressor (Trane CGAM or equal)

In the Schedule of Items HVAC Item#15, 16 the Properties of VRF Outdoor Unit, VRF Indoor Unit has not been defined, would you please give more information.

39 CES/CECED Response:

Outdoor Unit (MITSUBISHI ELECTRIC PURY-P350 YJM-A or Equal) COOLING CAPACITY : 40 kW HEATING CAPACITY : 45 kW

COMPRESSORS : INVERTER CONTROLLED,SCROLL HERMETIC

POWER INPUT

COOLING: 11.33 kW
HEATING: 10.89 kW
ELECTRIC: 380 V / 50 Hz
REFRIGERANT: R410

Indoor Unit CEILING CASETTE TYPE, 4 WAY AIR SUPPLY (MITSUBISHI ELECTRIC PLFY-P40 VBM-E or Equal) COOLING CAPACITY : 4.50 kW HEATING CAPACITY : 5.00 kW

AIR FLOW(max./min) : 480/660 m3/h
FAN MOTOR: 60 Watt

ELECTRIC: 220V, 1ph, 50Hz

In the Schedule of Items HVAC Item#21 the Properties of Air Handling Units has not been defined, would you please give more information.

39 CES/CECED Response Air Handling unit (HSK or Equal)

TYPE :HORIZONTAL - MIXING AIR

SUMMER OUTDOOR AIR DATA :38/26 °C DB/WB

WINTER OUTDOOR AIR DATA :0°C DT - %90 RH

FRESH AIR :4595m3/h

FILTERS

EU4 FILTER :PANEL TYPE, CLEANABLE

EU5 BAG FILTER :SYNTHETIC, 7 CELL (AT LEAST)

HEATING CAPACITY :200 KW

ENTERING AIR TEMP :16 °C DB

LEAVING AIR TEMP :27 °C DB

ENTERING / LEAVING WATER TEMP :90/70°C COLD WATER

COIL MAX. FACE VELOCITY :2.5 m/s MAX.

COOLING CAPACITY :315 KW

ENTERING AIR TEMP :25/17.6 °C DB

LEAVING AIR TEMP :12.5/11.8 °C DB

ENTERING / LEAVING WATER TEMP :7/12°C HOT WATER

COIL MAX. FACE VELOCITY :2.5 m/s MAX.

SUPPLY FAN

TYPE:PLUG TYPE, WITH FREQ.INVERTER
AIR FLOW RATE:56.725 m3/h

EX. STATIC PRESSURE :500Pa

RPM:1261
POWER:37 KW

VOLT/PHASE/HERTZ :380/3/50

EXHAUST FAN

TYPE :PLUG TYPE, WITH FREQ.INVERTER

AIR FLOW RATE :52.130 m3/h EX. STATIC PRESSURE :650Pa

RPM: 1386

POWER :30 KW

VOLT/PHASE/HERTZ:380/3/50

In the Schedule of Items HVAC Item#24 the Properties of Rooftop Air Package Type has not been defined, would you please give more information.

39 CES/CECED Response:

PACKAGED TYPE AIR CONDITIONING UNIT, HEAT PUMP TYPE COMPLETE WITH AUTOMATIC CONTROL SYSTEM and ECONOMIZER (CARRIER 50 UH 120 or equal)

COOLING CAPACITY: 109.5 kW (WITH E.R.M.-ENERGY RECOVERY MODULE) HEATING CAPACITY: 138.6 kW (WITH E.R.M.-ENERGY RECOVERY MODULE)

COP: 3.14

ELECTRICITY: 380 V, 3 Ph., 50 Hz.

REFRIGERANT: R410-A

In the Schedule of Items HVAC Item#39 the Properties of Variable Air Volume Boxes has not been defined, would you please give more information.

39 CES/CECED Response:

Max. 3 W (for dc voltage), Flow :576 m3/h (for 5. 2 m/s air velocity), Torque: min. 4 Nm, 6 Nm starting torque (TROX TVR-Easy / 200 OR equal)

In the Schedule of Items Fuels Item#1 the Properties of Fuel Pump has not been defined, would you please give more information.

39 CES/CECED Response:

Piusi E-120 or equal

In the Schedule of Items Fuels Item#2 the Properties of Fuel Storage Tank has not been defined, would you please give more information.

39 CES/CECED Response:

10000 gallons new above ground type, double walled fuel tank c/w leak detection system ( Afriso K19 or Equal), magnetic level gauge and overfill prevention valve with spill container on the new fuel storage tanks.(OPW 1-2100 and 61-SO or Equal)

For PVC pipes, no other product is approved at Incirlik Air Base except WavinAS. However there are unapproved makes in the PPL (Preferred Product List) Can we use the prices of these products in the Unit Price Listing for the Base year and the following 4 option years.

39 CES/CECED Response:

Please consider WavinAS or equal for building interior sewer line installations. Others can be used for out of building applications where criteria are not as stringent. We will provide updated PPL.

For PPRC pipes, no other product is approved at Incirlik Air Base except Aquatherm. However there are unapproved makes in the PPL (Preferred Product List) Can we use the prices of these products in the Unit Price Listing for the Base year and the following 4 option years.

39 CES/CECED Response:

Please consider Aquatherm or equal for building HVAC/potable domestic installations. Others can be used for out of building applications where criteria are not as stringent. We will provide updated PPL.

Seed Project#2 “LJYC_10‐1081 Repair Walk‐In Freezers Dining Facility, Bldg#965”; Where the exterior units of the existing freezers and coolers are located at?

39 CES/CECED Response:

On roof.

Seed Project#2 “LJYC_10‐1081 Repair Walk‐In Freezers Dining Facility, Bldg#965; Is it required to remove all the panels of the existing freezers and coolers.

39 CES/CECED Response:

Yes.

In the Schedule of items Electrical section item#14: Please clarify if the CCV type ring main unit indicated is motorized or not?

39 CES/CECED Response: RMU shall be considered as motorized (ABB or equal)

In the Schedule of items Electrical section item#45: Please clarify if the 50kVA Generator, 380V, 50Hz is indoor type or outdoor type?

39 CES/CECED Response: Generator shall be considered as indoor standby generator (Caterpillar or equal).

Other files

File Type Posted
FA5685-14-R-0013-0015.doc DOC document
Bldg._475_Drawings.pdf PDF
Revised_Bldg._____475_SOW_______01_Aug_14.docx DOCX document
FA5685-14-R-0013-0014.doc DOC document
FA5685-14-R-0013-0012.doc DOC document
RESPONSE___8_MACC_Solicitation_FA5685-14-R-0013.docx DOCX document
Attachment___31.docx DOCX document
Response___7-Solicitation___FA5685-14-R-0013.docx DOCX document
Attachement___32.pdf PDF
FA5685-14-R-0013-0011.doc DOC document
RESPONSE___6_MACC_Solicitation_FA5685-14-R-0013.docx DOCX document
RESPONSE___5_MACC_Solicitation_FA5685-14-R-0013.docx DOCX document
FA5685-14-R-0013-0010.doc DOC document
Questions___4_Response_to_MACC_Solicitation-FA5685-14-R-0013.docx DOCX document
Attachment___30_Gypsumboard_Wall_Detail.pdf PDF
FA5685-14-R-0013-0009.doc DOC document
Attachment___29_MACC_CIVIL-STRUCTURAL_DRAWINGS_____1.PDF PDF
Attachement___28_MACC_CIVIL-STRUCTURAL_DRAWINGS.PDF PDF
Response___3_to_MACC_Questions-FA5685-14-R-0013.docx DOCX document
FA5685-14-R-0013-0008.doc DOC document
Attachment___26_Section_H-4.docx DOCX document
Attachement___27_Supplement_to_2014_MACC_General_Specifications.docx DOCX document
FA5685-14-R-0013-0007.doc DOC document
INC-1104_Design_Review_Checklist.doc DOC document
Past_Performance_Questionnarie__PPQ.docx DOCX document
PPL_Jun_2014.xls XLS spreadsheet
FA5685-14-R-0013-00005.doc DOC document
Responses___2_to_Questions_for__MACC_Solicitation-5_July_14.docx DOCX document
FA5685-14-R-0013-0004.doc DOC document
FA5685-14-R-0013-0001.doc DOC document
Attachment___11_SOW_LJYC_10-1081.pdf PDF
Attachment___23_INC-1101_KTR_Cost_Estimate.xlsx XLSX spreadsheet
Attachment___7_INC-1101_Cost_Estimate.xlsx XLSX spreadsheet
Attachment___25_INC-1108_Design_Review_Checklist.xlsx XLSX spreadsheet
Attachment___5_Site_Visit_Reservation_Form3_FA5685-14-R-0013.docx DOCX document
Attachment___15_LJYC___1081_PPL__Feb_2012.xls XLS spreadsheet
Attachment___14_Drawings_LJYC_10-1081.pdf PDF
Attachment___6_SOW_LJYC_10-1052.pdf PDF
Attachment___24_INC-1106_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment___8_LJYC_10-1052_INC_1106.xls XLS spreadsheet
Attachement___2_MACC_Design_Guide_2014.docx DOCX document
Attachment___3__Past_Performance_Questionnaire.docx DOCX document
Attachment___22_SOS_for_MOCK_Project_Ren_B_444.doc DOC document
Attachment___10_PPL_Feb_2012.xls XLS spreadsheet
Attachment___19_INC-1106_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment___17_LJYC_11-1009_Repair_Roof_Bldg..pdf PDF
Attachment___16_Asbestos_Register_List.pdf PDF
Attachment___18_INC-1101_Cost_Price_Breakdown.xlsx XLSX spreadsheet
Attachment___21_LJYC___11-1009.xls XLS spreadsheet
Attachment___13_LJYC_10-1081_INC-1101.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .