INC-1101 (Front) TOTAL
| CONTRACTOR | | | | | ADDRESS | | | | | | {END}{UP} | {DOWN 52}~ | {/ Block;Erase} | This is NOT a comprehensive cost estimation macro. The User |
| GOVERNMENT | | | | | Incirlik Air Base, Adana / TURKEY | | | | | | {UP 52} | {/ Block;Copy} | {RIGHT 3} | is required to do many of the revisions manually. The User |
| CONTRACT FOR (Work to be performed) | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | | | {/ Protection;Disable} | {ESC}{UP 53} | {DOWN 33}~ | must be capable of using a spreadsheet with minimum help. |
| RPR REPLACE ROLL-UP DOORS OFFICIAL DOCUMENT CENTER B 977 | | | | | | $0.00 | | | | | {/ Block;Copy} | .{DOWN 52} | {RIGHT 5} | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | WORK LOCATION : | | | | | {DOWN 52} | {RIGHT 12}~~ | {/ Block;Erase} | The cost form is prepared for Quattro Pro version 4.0. The printer |
| | | LJYC 10-1052 | | | Incirlik Air Base, Adana / TURKEY | | | | | {RIGHT 12}~ | {/ Protection;Enable} | {RIGHT 1} | selected is Canon Laser Printer LPB-4. Hovewer, as the program's |
| | UNIT OF | | MATERIAL COST | | | LABOR COST | | $ | $ | {DOWN 53}~ | | {DOWN 33}~ | soft fonts are used, changing a printer should not present problems. |
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | | $ | $ | OTHER | LINE | {/ Protection;Enable} | | {RIGHT 3} | |
| NO | | | | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | | | {/ Block;Erase} | It is possible that, at the first trials, problems with page fitting may |
| | | | | | | RATE | | COSTS | | | | {DOWN 33}~ | arise. The User should experiment with the size of the first |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | | | {LEFT 8} | font on the font table. |
| R E C A P I T U L A T I O N | | | | | | | | | | | | {/ Protection;Enable} | |
| | | | | | | | | | | | | | The User is recommended to work in protected mode initially to avoid |
| 1 | DESIGN | | | | 0.00 | 0.00 | | 0.00 | 0.00 | 0.00 | | | | |
| 2 | ARCHITECTURAL | | | | 0.00 | 0.00 | | 0.00 | 0.00 | 0.00 | | | | |
| 3 | ELECTRICAL | | | | 0.00 | 0.00 | | 0.00 | 0.00 | 0.00 | | | | |
TOTAL - 0 - 0 - 0 - 0 - 0
| DESIGN | | |
| 1 | DESIGN | | |
| DESIGN TOTAL | - 0 | - 0 |
| ARCHITECTURAL |
| 1 | REMOVAL OF EXISTING ROLL-UP DOORS & FRAMES C/W HARDWARE AND ACCESSORIES |
| 2 | DEMOLITION OF EXISTING CONCRETE BLOCK MASONRY WALLS NEARBY THE TWO OVERHEAD SECTIONAL DOORS |
| 3 | PROVIDE AND INSTALL NEW INSULATED ROLL-UP DOOR IDENTICAL WITH THE EXISTING ONES |
| 4 | CONSTRUCT AND INSTALL TUBULAR STEEL FRAME C/W HANGERS |
| 5 | PROVIDE AND INSTALL NEW ROLL-UP DOOR FOR PACKAGE DELIVERY WINDOW |
| 6 | PROVIDE AND INSTALL NEW ROLL-UP DOOR FOR NEW SERVICE WINDOW |
| 7 | CONSTRUCT NEW CONCRETE BLOCK MASONRY WALLS |
| 8 | PLASTERING OF NEW CONCRETE BLOCK MASONRY WALL SURFACES |
| 9 | REPAIRING OF DAMAGED EXISTING WALL SURFACES |
| 10 | PROVIDE & INSTALL TERMOBREAK ALUMINUM WINDOWS WITH 4+9+8 MM THICK INSULATING GLASS AND ALL REQUIRED ACCESSORIES |
| 11 | PROVIDE & INSTALL 3 CM THICK MARBLE WINDOW SILLS |
| 12 | PAINTING OF NEW CMU WALL EXTERIOR SIDE |
| 13 | PAINTING OF INTERIOR NEW AND EXISTING WALL/CEILING SURFACES WITH ACRYLIC BASED PAINTS C/W PUTTYING AND PRIMERING IN ORGANIZATION MAIL HOLDING AREA |
| 14 | MISCELLANEOUS ITEMS AND SITE CLEAN-UP |
TOTAL - 0 - 0 - 0 - 0 - 0
| ELECTRICAL | | | | | |
| 1 | ELECTRICAL DEMOLISH WORKS | | | | | |
| 2 | PROVIDE AND INSTALL EMT CONDUIT, WIRING, JUNCTION BOX, AND DISCONNECT SWITCH FOR ROLL-UP DOOR | | | | | |
| 3 | PROVIDE AND INSTALL EMT CONDUIT, WIRING, AND JUNCTION BOX FOR SECURITY SYSTEM OF ROLL-UP DOORS | | | | | |
| 4 | PROVIDE AND INSTALL BUZZER C/W CONDUIT AND WIRING | | | | | |
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
&"Arial,İtalik"&8Engineer's Final&"Courier,Regular"&12 &"Arial,Kalın"&10CONSTRUCTION COST ESTIMATE BREAKDOWN &"Arial,Kalın"&10
SHEET NO. &P OF &N
&"Times New Roman,Bold"&10Form INC-1101, Construction Cost Estimate Breakdown. (Rev 2, Nov 2009) &"Arial,Bold"&10FOR OFFICIAL USE ONLY&"Courier,Regular"&12
INC-1101 (Back) TOTAL
INSTRUCTIONS FOR COMPLETING Form INC-1101
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to |
| permit itemizing of all direct costs. |
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square |
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). |
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be |
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract |
| will be issued. Otherwise, the contractor is responsible for determining quantity estimates. |
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. |
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. |
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract |
| and of significant dollar value. |
Col 10 Line Total. Self-explanatory.
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last |
| page as follows. |
| TOTAL MATERIAL COSTS | | $ | 0.00 |
| | | ------------------------------- |
| TOTAL LABOR COSTS | | $ | 0.00 |
| | | ------------------------------- |
| TOTAL OTHER DIRECT COSTS | | $ | 0.00 |
| | | ------------------------------- |
| TOTAL COSTS | | $ | 0.00 |
| | | ------------------------------- |
| OVERHEAD | % | $ | 0.00 |
| | | ------------------------------- |
| SUBTOTAL | | $ | 0.00 |
| | | ------------------------------- |
| PROFIT | % | $ | 0.00 |
| | | ------------------------------- |
| TOTAL PRICE | | $ | 0.00 |
| DATE : | December 2013 | FIRM NAME | |
| | | ----------------------------------------------------------------- |
| TITLE: | PROJECT ENGINEER | BY | |
| ---------------------------------------------------------- | | ----------------------------------------------------------------- |
INSTRUCTIONS TO OFFERORS
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from |
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data |
| (see ASPR 3-807.3(e) and 3-807.4). |
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this |
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and |
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of |
| a. The existing, verifiable data. |
| b. The judgmental factors applied in projecting from known data to the estimate, and |
| c. The contingencies used by the offeror in his proposed price. |
In short, the offeror's estimating process itself needs to be disclosed.
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), |
| and made available to the contracting officer or his authorized representative upon request. |
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate |
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection |
| with any negotiations prior to contract award. |
| (Reverse of INC-1101, MAY 08) |