Response___7-Solicitation___FA5685-14-R-0013.docx

DOCX document 17 KB Posted

Attached to
MACC Solicitation # FA5685-14-R-0013 Federal contract opportunity
Solicitation number
FA5685-14-R-0013
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

See Attachment.

View the file

Other files for this federal contract opportunity

Other files attached to MACC Solicitation # FA5685-14-R-0013, newest first.
File Type Posted
FA5685-14-R-0013-0015.doc DOC document
Bldg._475_Drawings.pdf PDF
Revised_Bldg._____475_SOW_______01_Aug_14.docx DOCX document
FA5685-14-R-0013-0014.doc DOC document
FA5685-14-R-0013-0012.doc DOC document
RESPONSE___8_MACC_Solicitation_FA5685-14-R-0013.docx DOCX document
Attachment___31.docx DOCX document
Attachement___32.pdf PDF
RESPONSE___6_MACC_Solicitation_FA5685-14-R-0013.docx DOCX document
RESPONSE___5_MACC_Solicitation_FA5685-14-R-0013.docx DOCX document
FA5685-14-R-0013-0010.doc DOC document
Questions___4_Response_to_MACC_Solicitation-FA5685-14-R-0013.docx DOCX document
FA5685-14-R-0013-0009.doc DOC document
Attachment___30_Gypsumboard_Wall_Detail.pdf PDF
Attachment___29_MACC_CIVIL-STRUCTURAL_DRAWINGS_____1.PDF PDF
Response___3_to_MACC_Questions-FA5685-14-R-0013.docx DOCX document
Attachment___26_Section_H-4.docx DOCX document
FA5685-14-R-0013-0008.doc DOC document
Attachement___27_Supplement_to_2014_MACC_General_Specifications.docx DOCX document
FA5685-14-R-0013-0007.doc DOC document
Past_Performance_Questionnarie__PPQ.docx DOCX document
INC-1104_Design_Review_Checklist.doc DOC document
PPL_Jun_2014.xls XLS spreadsheet
FA5685-14-R-0013-00005.doc DOC document
Responses___2_to_Questions_for__MACC_Solicitation-5_July_14.docx DOCX document
FA5685-14-R-0013-0004.doc DOC document
FA5685-14-R-0013-0001.doc DOC document
Attachment___5_Site_Visit_Reservation_Form3_FA5685-14-R-0013.docx DOCX document
Attachment___6_SOW_LJYC_10-1052.pdf PDF
Attachment___14_Drawings_LJYC_10-1081.pdf PDF
Attachment___15_LJYC___1081_PPL__Feb_2012.xls XLS spreadsheet
Attachment___24_INC-1106_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment___22_SOS_for_MOCK_Project_Ren_B_444.doc DOC document
Attachement___2_MACC_Design_Guide_2014.docx DOCX document
Attachment___3__Past_Performance_Questionnaire.docx DOCX document
Attachment___13_LJYC_10-1081_INC-1101.xlsx XLSX spreadsheet
Attachment___9_Drawings_LJYC_10-1052.pdf PDF
Attachment___16_Asbestos_Register_List.pdf PDF
Attachment___8_LJYC_10-1052_INC_1106.xls XLS spreadsheet
Attachment___10_PPL_Feb_2012.xls XLS spreadsheet
Attachment___19_INC-1106_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment___17_LJYC_11-1009_Repair_Roof_Bldg..pdf PDF
Attachment___21_LJYC___11-1009.xls XLS spreadsheet
Attachment___18_INC-1101_Cost_Price_Breakdown.xlsx XLSX spreadsheet
Attachment___20_Drawings_-_LJYC_11-1009_Repair_Roof_Bldg._475.pdf PDF
Attachment___7_INC-1101_Cost_Estimate.xlsx XLSX spreadsheet
Attachment___25_INC-1108_Design_Review_Checklist.xlsx XLSX spreadsheet
Attachment___12_LJYC_10-1081_INC-1101_-_Untabulated.xlsx XLSX spreadsheet
MACC_Solicitation___FA5685-14-R-0013-13_June_14.doc DOC document
Attachement___1_2014_MACC_General_Specifications_Guide.pdf PDF
Show all 50

MACC Solicitation # FA5685-14-R-0013 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q # 1: There are many information like resume, tables, personnel names in QC plan so that how is going to be redacted?

Response: Please refer to Section D-4 (page 40) of solicitaiton.

Q # 2: As far as we understood, VBR will review proposal package as a non-government personnel. They are familiar that tables, personnel, format and resumes which it is belong to which contractor is. If they review it, even proposal package will be redacted, it is going to be definable by them. Is it fair opportunity for us?

Response: All offerors will be evaluated based on the technical evaluation factors as delineated in Section M of the solicitation. As specified in the amendment, the Government reserves the right to utilize Non-Government Advisors in accordance with AFFARS MP 5315.3 Section-1.4.5.2.

Q # 3: IAW the seed project 3, Rpr Roof and Windows Bldg 475, we are requested to provide shop drawing but we have no information about existing roof structure. Also, IAW the SOW, metal structure will be need on the stair hall but we don’t know existing structure steel or wooden? Please provide us detail information regarding the steel structure.

Response: There are TIFF files from building 475, but none show what the roof addition of the metal roof nor its structural system. The existing stairwell structure is made out of reinforced concrete. The parapet may only be CMU block, and may need to be strengthened. In order to prepare the shop drawings, the contractor will have to remove panels to see what is underneath, after award.

1- LJYC-11-1009 Repair Roof Bldg. 475, According to the Autocad drawings there is 2 options for the roof. option 1 is replacing all the roofincluding an extension , option 2 is replacing the north side of the roof including an extension on the staircase.

1. According to sow there is only work items for option 2, could you provide work items for option one?

Response: We have removed the two options, and replaced with only one. See Item Nos. 7 and 8.

Government Response: Either of the two options on sheet A1 can be used, or a third option can be proposed by the contractor. The entire roof must be reskinned in any of the designs. Yellow highlighting on drawing A1 is included for clarity on that option, so that contractors understand that that portion of the roof must also be reskinned.

1. For option 1 could you provide cross section of the existing roof?

Response: No, we cannot provide as-built drawings, because they do not exist.

• July 24, 2014 dated Questions& Answers

Question 13: SF 1442 page 37 of 46 The seed project # 3 item e requires “tie new and existing structures together.”

To perform “tie new and existing structures together” work, we have to know existing structures details. There are no details/drawings for Bldg. 475 roof structures on the Government provided drawings. Please provide Bldg. 475 existing roof structure details/drawings.

Response: Since this is a design-build project, the contractor is expected to design the roof. As mentioned above, the solicitation package has enough information for the contractor to prepare a reasonable bid price.

SF 1442 page 37 of 46 proposal package requirements:

3. Project LJYC 11-1009 (Repair Roof and Windows Communication Bldg. 475). Offerors shall also address the following items in their proposal:

a. Protection for existing built up roof.

b. Protect stair roof which contains Asbestos Containing Material from damage.

c. Calculate and install insulation to meet AF requirements per 2014 MACC General Specifications. Prevent insulation from contact with built up roof and water damage.

d. Seal insulation against water and air infiltration.

e. Join existing roof and new roof on one level and tie new and existing structures together.

SF 1442 page 38 of 46 states that provide narrative including “…a sound approach and method for accomplishing work requirements for all three (3) seed projects listed above with the appropriate skills, equipment, and materials, in the appropriate quantities to meet standards IAW 2014 MACC General Specifications Guide.”

How are we going to provide seed project # 3 requirements especially “Join existing roof and new roof on one level and tie new and existing structures together” narrative for an unknown roof structure with our proposal?

Response: Since this is a design-build project, the contractor is expected to design the roof. As mentioned above, the solicitation package has enough information for the contractor to prepare a reasonable bid price.

While the Government does not have roof structural type information and details, how narratives will be evaluated? Could you please clarify urgently?

Response: If your narrative proposal approximates the ideas in the concept drawing and statement of work, it should be looked upon favorably. Sketches are acceptable to help in your narrative description.

Could you please revise/reduce requirements of seed Project # 3 due to above mentioned missing existing roof condition information.

Response: As mentioned above, We have removed the two options from the SOW, and replaced them with only one. See Item Nos. 7 and 8. The solicitation drawings have been updated to reflect this change.

File details come from the government source that posted it. Updated .