Attachment___19_INC-1106_Schedule_of_Material_Submittals.xls
XLS spreadsheet 199 KB Posted
- Attached to
- MACC Solicitation # FA5685-14-R-0013 Federal contract opportunity
- Solicitation number
- FA5685-14-R-0013
About this file
Attachment 19
View the file
Other files for this federal contract opportunity
Show all 50
MACC Solicitation # FA5685-14-R-0013 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | SUBMITTAL SCHEDULE | NTP+10 D | ||||||||||||||||||||
| 2 | SAFETY PLAN | 3 | ||||||||||||||||||||
| 3 | QUALITY CONTROL PLAN | 3 | ||||||||||||||||||||
| 4 | KEY PERSONNEL LIST | 3 | ||||||||||||||||||||
| 5 | PROGRESS SCHEDULE | 3 | ||||||||||||||||||||
| 6 | EQUIPMENT DELIVERY SCHEDULE | 3 | ||||||||||||||||||||
| 7 | NOTICES FOR PROJECT COMPLETION AND FINAL INSPECTION | 3 | ||||||||||||||||||||
| 8 | OPERATION AND MAINTENANCE MANUALS (Hardcopy: 1 original, 2 copies and 1 CD) | 3 | ||||||||||||||||||||
| 9 | AS BUILT DATA (1 Original, 1 Red Line) | 1 | ||||||||||||||||||||
| 10 | HAZARDOUS MATERIAL LIST IN AF FORM 3952 | 3 | ||||||||||||||||||||
| 11 | PHASING PLAN | 3 |
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 4, May 2011)
ARCHITECTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ARCHITECTURAL | ||||||||||||||||||||||
| 1 | GYPSUM BOARD & WATER RESISTANT TYPE GYPSUM BOARD WALL COVERING C/W STEEL STUDS & RUNNERS | |||||||||||||||||||||
| 2 | GYPSUM BOARD CEILING COVERING C/W STEEL BOX PROFILE (40X60 MM.) | |||||||||||||||||||||
| 3 | SHOP DRAWINGS FOR GYPSUM BOARD CEILING AND WALL COVERING | |||||||||||||||||||||
| 4 | HOLLOW CORE CONCRETE BLOCK UNITS. SPECS. SEC. 04300 | |||||||||||||||||||||
| 5 | NEW STEEL INTERIOR STAIRS, HANDRAILS AND EDGE STRIPS (NOSING) | |||||||||||||||||||||
| 6 | WROUGHT IRON BALCONY RAILINGS | |||||||||||||||||||||
| 7 | SHOP DRAWINGS FOR WROUGHT IRON BALCONY RAILINGS | |||||||||||||||||||||
| 8 | EXTERIOR STEEL DOORS AND FRAMES W/ LOUVER | |||||||||||||||||||||
| 9 | NP STEEL BEAMS AND COLUMS FOR CARPORT AND BALCONY SUPPORTS | |||||||||||||||||||||
| 10 | CLAY TILE APPEREANCE PROFILED STEEL SHEET METAL ROOF PANELS, 0.70 MM. THICK & 32 DENSITY POLYSTRENE FOAM | |||||||||||||||||||||
| 11 | CLAY TILE APPEREANCE STEEL SHEET METAL ROOF PANELS | |||||||||||||||||||||
| 12 | DOOR CLOSER | |||||||||||||||||||||
| 13 | DOOR STOP | |||||||||||||||||||||
| 14 | DOOR LOCK | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | WALNUT VENEERED CORE WOOD INTERIOR DOOR | |||||||||||||||||||||
| 16 | METAL THRESHOLD FOR EXTERIOR DOOR | |||||||||||||||||||||
| 17 | ALUMINUM WINDOW C/W HARDWARE AND ALL REQUIRED ACCESSORIES | |||||||||||||||||||||
| 18 | SHOP DRW. FOR ALUMINUM WINDOWS | |||||||||||||||||||||
| 19 | ALUMINUM DOORS C/W HARDWARE AND ALL REQUIRED ACCESSORIES | |||||||||||||||||||||
| 20 | ALUMINUM ROOF LOUVER | |||||||||||||||||||||
| 21 | DOOR KNOCK / PEEP HOLE | |||||||||||||||||||||
| 22 | FIRE EXTINGUISHER CABINET | |||||||||||||||||||||
| 23 | NATURAL MARBLE WINDOW SILLS AND FLOOR TILES TO MATCH TO EXISTING MARBLE TILES | |||||||||||||||||||||
| 24 | GYPSUM PUTTY | |||||||||||||||||||||
| 25 | NON-SKID GRANITE CERAMIC FLOOR TILE | |||||||||||||||||||||
| 26 | CERAMIC WALL TILE | |||||||||||||||||||||
| 27 | READY MIXED JOINT GROUT FOR FLOOR AND WALL TILES | |||||||||||||||||||||
| 28 | SYNTHETIC PAINT & PRIMER FOR GALVANIZED METAL SURFACE | |||||||||||||||||||||
| 29 | SILICONE BASED INTERIOR & EXTERIOR PAINTS, AND PRIMER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | READY MIXED COLORED PLASTER | |||||||||||||||||||||
| 31 | NATURAL GRANITE COUNTER TOP | |||||||||||||||||||||
| 32 | CHROME PLATED OR STAINLESS STEEL HANDRAIL WITH ACCESSORIES FOR STAIRS | |||||||||||||||||||||
| 33 | HIGH PRESSURE LAMINATE KITCHEN TOP & BOTTOM CABINETS, C/W SHELVES, DRAWERS & ALL ACC. | |||||||||||||||||||||
| 34 | NATURAL WALNUT VENEERED CLOSETS, BOOKCASES, COUNTERS C/W SHELVES, DRAWERS & ALL ACC. | |||||||||||||||||||||
| 35 | ELECTROSTATIC PAINTED ALUMINUM & PLEXIGLASS BATHTUB/SHOWERTUB CABINET WITH SLIDING DOORS | |||||||||||||||||||||
| 36 | MIRROR | |||||||||||||||||||||
| 37 | 90% HUMIDITY RESISTANT TYPE, ACOUSTICAL SUS. CEILING SYS., C/W RUNNERS, HANGERS & ACC. | |||||||||||||||||||||
| 38 | SHOP DRAWINGS FOR ACOUSTICAL SUSPENDED CEILING TILES, C/W RUNNERS, HANGERS AND ACCESSORIES | |||||||||||||||||||||
| 39 | LAMINATED VANITY COUNTER WITH GRANITE COUNTER TOP | |||||||||||||||||||||
| 40 | LAMINATED MEDICINE CABINET | |||||||||||||||||||||
| 41 | STAINLESS STEEL TOWEL BARS (600 MM.) AND HOOKS | |||||||||||||||||||||
| 42 | 1 MM. THICK HOT DIP GALVANIZED, PAINTED TRAPEZOIDAL SHEET METAL PANELS | |||||||||||||||||||||
| 43 | LAMINATED SAFETY THERMAL GLASS (4+4)+6+4 MM. | |||||||||||||||||||||
| 44 | PAPER TOWEL DISPENSER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 45 | PAPER TOWEL DISPENSER | |||||||||||||||||||||
| 46 | LAVATORY TRAP | |||||||||||||||||||||
| 47 | CLOSET FLUSH VALVE | |||||||||||||||||||||
| 48 | FACTORY PAINTED GUTTERS AND, FLASHING C/W ACCESSORIES | |||||||||||||||||||||
| 49 | KILN DRY PROCESSED IMPREGNATED SOLID WOOD POST, RIDGE BEAM, PURLINS AND RAFTERS | |||||||||||||||||||||
| 50 | ORIENTED STRAND BOARD (OSB) 11 MM. THICK | |||||||||||||||||||||
| 51 | FACTORY PAINTED DOWNSPOUTS C/W ACCESSORIES | |||||||||||||||||||||
| 52 | LAMINATED SAFETY THERMAL GLASS (4+4)+6+4 MM. PVB 1,52 MM. THICK | |||||||||||||||||||||
| 53 | PLASTOMER POLYMER BITUMEN WATER PROOFING MEMBRANES & PRIMER | |||||||||||||||||||||
| 54 | CONCRETE SEALANT MATERIAL | |||||||||||||||||||||
| 55 | GLASS WOOL INSULATION, 50 MM. THICK | |||||||||||||||||||||
| 56 | NEW 4" PVC PLUMBING VENTILATION PIPE C/W NECESSARY FLASHING | |||||||||||||||||||||
| 57 | ASBESTOS CONTAINER | |||||||||||||||||||||
| 58 | CARPET TILE, ADHESIVE AND LAMINATED BASEBOARD | |||||||||||||||||||||
| 59 | ELECTROSTATIC PAINTED BLAST RESISTANT WINDOWS AND DOORS / FRAMES MAXIMUM BLAST PRESSURE (REFLECTED PRESSURE) SHALL BE 24 PSI IN ACCORDANCE WITH 25.00 M. STANDOF DISTANCE | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 60 | SHOP DRAWINGS FOR BLAST RESISTANT WINDOWS AND DOORS INDICATING THE EXACT DIMENSIONS OF THE WINDOWS&DOORS , ELEVATIONS AT 1/20 OR 1/25 SCALE & ALL DETAILS AT 1/1 OR AT 1/2 SCALE | |||||||||||||||||||||
| 61 | LAMINATED TEMPERED SAFETY THERMAL GLASS, COLOR:BRONZE (REFLECTED) | |||||||||||||||||||||
| 62 | PANIC HARDWARE, DOUBLE AND SINGLE | |||||||||||||||||||||
| 63 | ADHERENCE STRENGTHENING PRIMER, READY MIXED CEMENT BASED PLASTER AND FINISH COAT | |||||||||||||||||||||
| 64 | POLYMER BITUMEN WATERPROOFING, ROOF INSULATION | |||||||||||||||||||||
| 65 | Ω "OMEGA" SHAPED SHEET STEEL ROOFING SUPPORT MEMBER | |||||||||||||||||||||
| 66 | ALL TYPES OF PROFILES AND ACCESSORIES FOR THE INSTALLATION OF STANDING SEAM ROOFING SYSTEM | |||||||||||||||||||||
| 67 | POLYPROPYLEN VAPOR BARRIER | |||||||||||||||||||||
| 68 | 0.7 mm. THICK HOT DIP GALVANIZED AND COIL COATED SHEET STEEL ROOFING SYSTEM WITH STANDING SEAM | |||||||||||||||||||||
| 69 | 11 mm THICK OSB PANEL | |||||||||||||||||||||
| 70 | ALL TYPES OF EDGE, RIDGE AND MISCELLANEOUS PROFILE | |||||||||||||||||||||
| 71 | MISCELLANEOUS GRILL, LOUVER, DUCT, ANTENNA ETC. PENETRATION | |||||||||||||||||||||
| 72 | 3 mm THICK BITUMINOUS MEMBRANE | |||||||||||||||||||||
| 73 | 0.7 mm THICK TRAPEZOIDAL ROOFING PANEL | |||||||||||||||||||||
| 74 | 100 mm DIAMETER GALV. STEEL PIPE DOWNSPOUTS C/W INSTALLATION ACCESSORIES | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 75 | RAISED FLOOR SYSTEM | |||||||||||||||||||||
| 76 | SHOP DRAWINGS FOR RAISED FLOOR SYSTEM | |||||||||||||||||||||
| 77 | SILICONE BASED PAINT AND PRIMER | |||||||||||||||||||||
| 78 | READY MIXED COLORED PLASTER | |||||||||||||||||||||
| 79 | SYNTHETIC ENAMEL PAINT AND PRIMER | |||||||||||||||||||||
| 80 | METAL PRIMER FOR GALVANIZED SURFACES | |||||||||||||||||||||
| 81 | WOOD PROTECTIVE STAIN WITH VARNISH AND IMPREGNATE COAT | |||||||||||||||||||||
| 82 | EPOXY RESIN BASED PAINT AND PRIMER | |||||||||||||||||||||
| 83 | CEMENT BASED POLYMER MODIFIED SURFACE REPAIR GROUT | |||||||||||||||||||||
| 84 | AQCRYLIC RESIN BASED SEAL MATERIAL | |||||||||||||||||||||
| 85 | WATER BASED SATIN PAINT AND PRIMER | |||||||||||||||||||||
| 86 | SILICONE BASED INTERIOR PAINT AND PRIMER | |||||||||||||||||||||
| 87 | CEMENT BASED POLYMER MODIFIED REPAIR&FINISHING GROUT | |||||||||||||||||||||
| 88 | SOLVENT CONTAINING ACRYLIC RESIN BASEDCONCRETE SEAL MATERIAL | |||||||||||||||||||||
| 89 | EPOXY RESIN BASED PRIMER &NON-SKID MATERIAL | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 89 | EPOXY RESIN BASED PRIMER &SELF LEVELING MATERIAL, QUARTZ SAND & NON-SKID MATERIAL | |||||||||||||||||||||
| 90 | ONE COMPNENT POLYURETHANE BASED COLD JOINT SEALANT | |||||||||||||||||||||
| 91 | ||||||||||||||||||||||
| 92 | ||||||||||||||||||||||
| 93 | ||||||||||||||||||||||
| 94 | ||||||||||||||||||||||
| 95 | ||||||||||||||||||||||
| 96 | ||||||||||||||||||||||
| 97 | ||||||||||||||||||||||
| 98 | ||||||||||||||||||||||
| 99 | ||||||||||||||||||||||
| 100 | ||||||||||||||||||||||
| 101 | ||||||||||||||||||||||
| 102 | ||||||||||||||||||||||
| 103 |
FUEL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| FUEL | ||||||||||||||||||||||
| 1 | PE COATED FUEL PIPING | |||||||||||||||||||||
| 2 | FUEL PUMPS | |||||||||||||||||||||
| 3 | HLVD SYSTEM | |||||||||||||||||||||
| 4 | GATE VALVE PN 16 | |||||||||||||||||||||
| 5 | BALL VALVE PN 16 | |||||||||||||||||||||
| 6 | COATING | |||||||||||||||||||||
| 7 | CHECK VALVE | |||||||||||||||||||||
| 8 | PRESSURE RELIF VALVE | |||||||||||||||||||||
| 9 | SAFETY DEVICE | |||||||||||||||||||||
| 10 | CLAYTON VALVE | |||||||||||||||||||||
| 11 | INSULATION FLANGE | |||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 |
FIRE PROTECTION
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| FIRE PROTECTION | ||||||||||||||||||||||
| 1 | FIRE PUMPS | |||||||||||||||||||||
| 2 | JOCKEY PUMPS | |||||||||||||||||||||
| 3 | WATER STORAGE TANKS | |||||||||||||||||||||
| 4 | FIRE PROTECTION PIPING & ACCESSORIES | |||||||||||||||||||||
| 5 | BACKFLOW PREVENTERS | |||||||||||||||||||||
| 6 | POST INDICATOR VALVES | |||||||||||||||||||||
| 7 | OS&Y VALVES | |||||||||||||||||||||
| 8 | VALVES |
(GATE, CHECK, BALL, GLOBE ETC.)
| 9 | TEST & DRAIN VALVES | |||||||||||||||||||||
| 10 | BUTTERFLY VALVES | |||||||||||||||||||||
| 11 | ALARM CHECK VALVE ASSEMBLY | |||||||||||||||||||||
| 12 | SPRINKLER HEADS & ACCESSORIES | |||||||||||||||||||||
| 13 | FLOW SWITCHES | |||||||||||||||||||||
| 14 | SUPERVISORY SWITCHES | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | SUPPORTS & HANGERS | |||||||||||||||||||||
| 16 | HYDRAULIC CALCULATIONS | |||||||||||||||||||||
| 17 | HOOD FIRE SUPPRESSION SYSTEMS | |||||||||||||||||||||
| 18 | SHOP DRAWINGS OF FIRE PROTECTION SYSTEMS | |||||||||||||||||||||
| 19 | TESTING ADJUSTING & BALANCING | |||||||||||||||||||||
| 20 | RETARDING CHAMBER | |||||||||||||||||||||
| 21 | WATER GONG | |||||||||||||||||||||
| 22 | TEMPER SWITCH | |||||||||||||||||||||
| 23 | FLOW SWITCH | |||||||||||||||||||||
| 24 | PRESSURE SWITCH | |||||||||||||||||||||
| 25 | ||||||||||||||||||||||
| 26 | ||||||||||||||||||||||
| 27 | ||||||||||||||||||||||
| 28 | ||||||||||||||||||||||
| 29 |
HVAC
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| HVAC | ||||||||||||||||||||||
| 1 | PACKAGED TYPE A/C UNITS | |||||||||||||||||||||
| 2 | AIR HANDLING UNITS | |||||||||||||||||||||
| 3 | CONDENSER UNITS | |||||||||||||||||||||
| 4 | CHILLER UNITS | |||||||||||||||||||||
| 5 | BOILERS | |||||||||||||||||||||
| 6 | WATER HEATERS | |||||||||||||||||||||
| 7 | POWER VENTILATORS | |||||||||||||||||||||
| 8 | DUCTWORK | |||||||||||||||||||||
| 9 | DUCT ACCESSORIES (GRILLES, DAMPERS ETC.) | |||||||||||||||||||||
| 10 | VIBRATION ISOLATORS | |||||||||||||||||||||
| 11 | INSULATION (DUCT, PIPE, EQUIPMENT ETC.) | |||||||||||||||||||||
| 12 | WATER TANKS | |||||||||||||||||||||
| 13 | HEAT EXCHANGERS | |||||||||||||||||||||
| 14 | PUMPS | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | HYDRONIC SPECIALTIES | |||||||||||||||||||||
| 16 | PIPES & FITTINGS | |||||||||||||||||||||
| 17 | SUPPORTS & HANGERS | |||||||||||||||||||||
| 18 | COLD STORAGE & ACCESSORIES | |||||||||||||||||||||
| 19 | SHOP DRAWING OF HVAC SYSTEMS | |||||||||||||||||||||
| 20 | TESTING ADJUSTING & BALANCING | |||||||||||||||||||||
| 21 | VALVES ( GATE, BALL, CHECK, GLOBE ETC.) | |||||||||||||||||||||
| 22 | PPRC PIPING | |||||||||||||||||||||
| 23 | SPLIT SYSTEM HEAT PUMP UNIT | |||||||||||||||||||||
| 24 | SPLIT SYSTEM A/C UNIT | |||||||||||||||||||||
| 25 | FAN COIL UNIT | |||||||||||||||||||||
| 26 | EXPANSION TANK | |||||||||||||||||||||
| 27 | AUTOMATIC CONTROL SYSTEM | |||||||||||||||||||||
| 28 | VRV HVAC SYSTEM | |||||||||||||||||||||
| 29 | WATER SOFTENER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | BALANCE VALVE | |||||||||||||||||||||
| 31 | ||||||||||||||||||||||
| 32 | ||||||||||||||||||||||
| 33 | ||||||||||||||||||||||
| 34 | ||||||||||||||||||||||
| 35 | ||||||||||||||||||||||
| 36 | ||||||||||||||||||||||
| 37 | ||||||||||||||||||||||
| 38 | ||||||||||||||||||||||
| 39 | ||||||||||||||||||||||
| 40 | ||||||||||||||||||||||
| 41 | ||||||||||||||||||||||
| 42 | ||||||||||||||||||||||
| 43 | ||||||||||||||||||||||
| 44 |
PLUMBING
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| PLUMBING | ||||||||||||||||||||||
| 1 | PPRC PIPES & ACCESSORIES | |||||||||||||||||||||
| 2 | LAVATORY | |||||||||||||||||||||
| 3 | WATER CLOSET | |||||||||||||||||||||
| 4 | URINAL | |||||||||||||||||||||
| 5 | SHOWER TUBS | |||||||||||||||||||||
| 6 | BATH TUBS | |||||||||||||||||||||
| 7 | MIXING FAUCET | |||||||||||||||||||||
| 8 | SHOWER MIXING VALVE | |||||||||||||||||||||
| 9 | SHOWER HEADS | |||||||||||||||||||||
| 10 | TRAPS | |||||||||||||||||||||
| 11 | FLOOR DRAIN | |||||||||||||||||||||
| 12 | CLEAN OUT | |||||||||||||||||||||
| 13 | FLUSH VALVES | |||||||||||||||||||||
| 14 | BALL COCK UNITS | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | STRAINERS | |||||||||||||||||||||
| 16 | BACKFLOW PREVENTERS | |||||||||||||||||||||
| 17 | VACUUM BREAKERS | |||||||||||||||||||||
| 18 | IRRIGATION SYSTEM C/W ACCESSORIES | |||||||||||||||||||||
| 19 | SHOP DRAWING OF PLUMBING SYSTEMS | |||||||||||||||||||||
| 20 | TESTING ADJUSTING & BALANCING | |||||||||||||||||||||
| 21 | INSULATION | |||||||||||||||||||||
| 22 | VALVES ( GATE, BALL, CHECK, GLOBE ETC.) | |||||||||||||||||||||
| 23 | PUMPS | |||||||||||||||||||||
| 24 | HYDRONIC SPECIALTIES | |||||||||||||||||||||
| 25 | SUPPORTS & HANGERS | |||||||||||||||||||||
| 26 | AIR VENT | |||||||||||||||||||||
| 27 | WATER HAMMER ARRESTOR | |||||||||||||||||||||
| 28 | RP TYPEBACK FLOW PREVENTER | |||||||||||||||||||||
| 29 | DC TYPE BACK FLOW PREVENTER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | VACUUM BREAKER | |||||||||||||||||||||
| 31 | BALANCE VALVE | |||||||||||||||||||||
| 32 | ||||||||||||||||||||||
| 33 | ||||||||||||||||||||||
| 34 | ||||||||||||||||||||||
| 35 | ||||||||||||||||||||||
| 36 | ||||||||||||||||||||||
| 37 | ||||||||||||||||||||||
| 38 | ||||||||||||||||||||||
| 39 | ||||||||||||||||||||||
| 40 | ||||||||||||||||||||||
| 41 | ||||||||||||||||||||||
| 42 | ||||||||||||||||||||||
| 43 | ||||||||||||||||||||||
| 44 |
CIVIL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| CIVIL | ||||||||||||||||||||||
| 1 | SUBBASE COURSE | |||||||||||||||||||||
| 2 | AGGREGATE BASE COURSE | |||||||||||||||||||||
| 3 | JOINT SEAL | |||||||||||||||||||||
| 4 | BACKER ROD | |||||||||||||||||||||
| 5 | JOINT REMOVAL EQUIPMENT | |||||||||||||||||||||
| 6 | HIGH WATER PRESSURE EQUIPMENT | |||||||||||||||||||||
| 7 | AIR COMPRESSOR EQUIPMENT | |||||||||||||||||||||
| 8 | DOUBLE BLADE CONCRETE SAW CUTTING MACHINE | |||||||||||||||||||||
| 9 | BACKER ROD INSTALLATION EQUIPMENT | |||||||||||||||||||||
| 10 | VACUUM EQUIPMENT | |||||||||||||||||||||
| 11 | COMPACTION TEST FOR BASE COURSE | |||||||||||||||||||||
| 12 | GALVANIZED STEEL POST FOR FENCE | |||||||||||||||||||||
| 13 | GALVANIZED STEEL FENCE | |||||||||||||||||||||
| 14 | GALVANIZED STEEL BRACKET | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | GALVANIZED BARBED WIRE | |||||||||||||||||||||
| 16 | STEEL OUTRIGGER | |||||||||||||||||||||
| 17 | SHOP DRAWING FOR CHAIN LINK FENCE AND FENCE GATES C/W ALL ACCESSORIES AND SECURITY BEAM | |||||||||||||||||||||
| 18 | SHOP DRAWING FOR DITCH CROSSING | |||||||||||||||||||||
| 19 | SHOP DRAWING FOR JOINT PLAN FOR CONCRETE AREAS | |||||||||||||||||||||
| 20 | ASPHALT CEMENT | |||||||||||||||||||||
| 21 | PLAYGROUND EQUIPMENT AND FALL ZONE | |||||||||||||||||||||
| 22 | SHOP DRAWING FOR PLAYGROUND EQUIPMENT AND FALL ZONE INSTALLATION | |||||||||||||||||||||
| 23 | SHOP DRAWINGS FOR NEW ASPHALT ROAD SHOWING THE ELEVATIONS | |||||||||||||||||||||
| 24 | ASPHALT MIX DESIGN | |||||||||||||||||||||
| 25 | SHOP DRAWINGS FOR NEW DUCT BANKS | |||||||||||||||||||||
| 26 | SHOP DRAWINGS FOR NEW HEADWALLS | |||||||||||||||||||||
| 27 | YELLOW AND WHITE PAINT | |||||||||||||||||||||
| 28 | SELECT FILL COMPACTION TEST | |||||||||||||||||||||
| 29 | PLANT MIX | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | SHOP DRAWING FOR STORM DRAIN PROFILES C/W RIM AND INVERT ELEVATIONS | |||||||||||||||||||||
| 31 | SELECT FILL MATERIAL | |||||||||||||||||||||
| 32 | SEED | |||||||||||||||||||||
| 33 | AIR CLEARANCE SAMPLING FOR ASBESTOS | |||||||||||||||||||||
| 34 | ASBESTOS ABATEMENT CERTIFICATION | |||||||||||||||||||||
| 35 | CRANE TYPE AND PROPERTIES | |||||||||||||||||||||
| 36 | GLASS BEADS | |||||||||||||||||||||
| 37 | SHOP DRAWING FOR DRAINAGE CHANNEL | |||||||||||||||||||||
| 38 | TOPSOIL | |||||||||||||||||||||
| 39 | FERTILIZER | |||||||||||||||||||||
| 40 | SHOP DRAWING FOR INSTALLATION OF THE BULLET TRAP | |||||||||||||||||||||
| 41 | WATER STOP FOR WALL EXPANSION JOINT | |||||||||||||||||||||
| 42 | CAST IRON FRAME AND COVER FOR DRAINAGE SYSTEM | |||||||||||||||||||||
| 43 | STORM DRAINAGE PIPE C/W WATERTIGHT JOINT (RCP,PCP,PVC) | |||||||||||||||||||||
| 44 | PRIMER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 45 | TACK COAT | |||||||||||||||||||||
| 46 | SEAL COAT | |||||||||||||||||||||
| 47 | ASPHALT BINDER COURSE | |||||||||||||||||||||
| 48 | ASPHALT WEARING COURSE | |||||||||||||||||||||
| 49 | WATER BASED TRAFFIC PAINT |
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
STRUCTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | FORMWORK | |||||||||||||||||||||
| 2 | REINFORCING STEEL | |||||||||||||||||||||
| 3 | READY MIXED CONCRETE | |||||||||||||||||||||
| 4 | CONCRETE CURING MATERIALS | |||||||||||||||||||||
| 5 | CONCRETE MASONRY UNITS | |||||||||||||||||||||
| 6 | METAL ITEMS | |||||||||||||||||||||
| 7 | WOOD OR STEEL FORM MATERIAL | |||||||||||||||||||||
| 8 | PLYWOOD | |||||||||||||||||||||
| 9 | WELDED STEEL WIRE FABRIC | |||||||||||||||||||||
| 10 | DOWELS | |||||||||||||||||||||
| 11 | FORM TIES | |||||||||||||||||||||
| 12 | FORM RELESE AGENT | |||||||||||||||||||||
| 13 | CORNERS | |||||||||||||||||||||
| 14 | NAILS, SPIKES, LAG BOLTS, THROUGH BOLTS, ANCHORAGE | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | TIE WIRE | |||||||||||||||||||||
| 16 | CHAIRS, BOLSTERS, BAR SUPPORTS, SPACERS | |||||||||||||||||||||
| 17 | BONDING AGENT | |||||||||||||||||||||
| 18 | NON-SHRINK GROUT | |||||||||||||||||||||
| 19 | CONSTRUCTION JOINT DEVICES | |||||||||||||||||||||
| 20 | EXPANSION DEVICES | |||||||||||||||||||||
| 21 | EXPANSION DEVICES | |||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 | ||||||||||||||||||||||
| 26 | ||||||||||||||||||||||
| 27 | ||||||||||||||||||||||
| 28 | ||||||||||||||||||||||
| 29 |
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
ELECTRICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 1 | ALL KINDS OF ELECTRICAL METALLIC TUBING | |||||||||||||||||||||
| 2 | ALL KINDS OF FLEXIBLE METAL CONDUIT | |||||||||||||||||||||
| 3 | ALL KINDS OF RIGID STEEL CONDUIT | |||||||||||||||||||||
| 4 | ALL KINDS OF CABLE TRAY | |||||||||||||||||||||
| 5 | ALL KINDS OF BUILDING WIRE AND CABLE | |||||||||||||||||||||
| 6 | ALL KINDS OF OUTLET BOXES | |||||||||||||||||||||
| 7 | ALL KINDS OF PULL AND JUNCTION BOXES | |||||||||||||||||||||
| 8 | ALL KINDS OF WALL SWITCHES | |||||||||||||||||||||
| 9 | ALL KINDS OF RECEPTACLES | |||||||||||||||||||||
| 10 | GROUNDING ELECTRODE | |||||||||||||||||||||
| 11 | EXOTHERMIC CONNECTIONS | |||||||||||||||||||||
| 12 | ALL KINDS OF GROUNDING WIRE | |||||||||||||||||||||
| 13 | BRANCH CIRCUIT PANELBOARDS | |||||||||||||||||||||
| 14 | SHOP DRAWINGS FOR BRANCH CIRCUIT PANELBOARDS | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | ALL KINDS OF LIGHTING FIXTURES | |||||||||||||||||||||
| 16 | SHOP DRAWINGS FOR LIGHTING FIXTURES INSTALLATION | |||||||||||||||||||||
| 17 | SHOP DRAWINGS FOR EMERGENCY LIGHTING UNITS INSTALLATION LOCATION AND ILLUMINATION CALCULATION | |||||||||||||||||||||
| 18 | ALL KINDS OF FLUORESCENT BALLASTS | |||||||||||||||||||||
| 19 | ALL KINDS OF FLUORESCENT LAMP EMERGENCY POWER SUPPLY | |||||||||||||||||||||
| 20 | ADDRESSABLE HEAT DETECTOR | |||||||||||||||||||||
| 21 | SHOP DRAWINGS HEAT DETECTOR INSTALLATION | |||||||||||||||||||||
| 22 | ADDRESSABLE FIRE ALARM STATION | |||||||||||||||||||||
| 23 | FIRE ALARM HORN- STROBE INTERNAL & EXTERNAL | |||||||||||||||||||||
| 24 | FIRE ALARM STROBE LIGHT | |||||||||||||||||||||
| 25 | ADDRESSABLE FIRE ALARM CONTROL PANEL | |||||||||||||||||||||
| 26 | FIRE ALARM SYSTEM GRAPHIC ANNUNCIATOR PANEL | |||||||||||||||||||||
| 27 | TELEPHONE CABLE | |||||||||||||||||||||
| 28 | TELEPHONE- DATA RECEPTACLE | |||||||||||||||||||||
| 29 | COMMUNICATION PROTECTED BUILDING ENTRANCE TERMINAL BOX | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | TV OUTLET | |||||||||||||||||||||
| 31 | CAT 5E OR CAT6 UTP CABLE | |||||||||||||||||||||
| 32 | SAFETY DISCONNECT SWITCH | |||||||||||||||||||||
| 33 | DIESEL GENERATOR | |||||||||||||||||||||
| 34 | AUTOMATIC TRANSFER SWITCH | |||||||||||||||||||||
| 35 | MANUAL TRANSFER SWITCH | |||||||||||||||||||||
| 36 | MOLDED CASE CIRCUIT BREAKERS. | |||||||||||||||||||||
| 37 | MINIATURE CIRCUIT BREAKERS | |||||||||||||||||||||
| 38 | EXIT LIGHTS | |||||||||||||||||||||
| 39 | FIRE ALARM SYSTEM BUILDING TRANCEIVER C/W ACCESSORIES | |||||||||||||||||||||
| 40 | COMMUNICATION PROTECTED BUILDING ENTRANCE TERMINAL BOX | |||||||||||||||||||||
| 41 | ULTRA SENSITIVE SMOKE DETECTORS SYSTEM C/W PANEL, PIPE AND SMOKE INLET | |||||||||||||||||||||
| 42 | ULTRA SENSITIVE SMOKE DETECTORS SYSTEMSHOP DRAWING | |||||||||||||||||||||
| 43 | LPS AIR TERMINAL | |||||||||||||||||||||
| 44 | DDC PANEL MATERIALS | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 45 | DDC PANEL SHOP DRAWING | |||||||||||||||||||||
| 46 | METAL LIGHTING POLE | |||||||||||||||||||||
| 47 | METAL LIGHTING POLE FOUNDATION AND INSTALLATION SHOP DRAWING | |||||||||||||||||||||
| 48 | EXTERIOR LIGHTING CONTROL PANEL C/W ALL DEVICES, | |||||||||||||||||||||
| 49 | DETECTABLE WARNING TAPE FOR UNDERGROUND UTILITY | |||||||||||||||||||||
| 50 | CABLE TAG | |||||||||||||||||||||
| 51 | BATTERY CHARGER FOR THE GENERATOR | |||||||||||||||||||||
| 52 | POLE NUMBER PLATE | |||||||||||||||||||||
| 53 | SURGE PROTECTOR DEVICE | |||||||||||||||||||||
| 54 | HI-POT TEST AND REPORT | |||||||||||||||||||||
| 55 | RING MAIN UNIT C/W ACCESSORIES | |||||||||||||||||||||
| 56 | STEP DOWN DRY TYPE TRANSFORMER | |||||||||||||||||||||
| 57 | NON METALLIC CABLE RACK | |||||||||||||||||||||
| 58 | HEAT RESISTANCE FIRE ALARM CABLE | |||||||||||||||||||||
| 59 | ADDRESSABLE FIRE ALARM SMOKE DETECTOR | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 60 | ADDRESSABLE FIRE ALARM DUCT TYPE SMOKE DETECTOR. | |||||||||||||||||||||
| 61 | RG6 COAX CABLE | |||||||||||||||||||||
| 62 | 19" PACH PANEL RACK | |||||||||||||||||||||
| 63 | HV AND LV CABLE SPLICE KIT | |||||||||||||||||||||
| 64 | HV CABLE POTHEAD FOR RINGMAIN UNITS |
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
File details come from the government source that posted it. Updated .