Response___3_to_MACC_Questions-FA5685-14-R-0013.docx

DOCX document 51 KB Posted

Attached to
MACC Solicitation # FA5685-14-R-0013 Federal contract opportunity
Solicitation number
FA5685-14-R-0013
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

See Attachment.

View the file

Other files for this federal contract opportunity

Other files attached to MACC Solicitation # FA5685-14-R-0013, newest first.
File Type Posted
FA5685-14-R-0013-0015.doc DOC document
FA5685-14-R-0013-0014.doc DOC document
Bldg._475_Drawings.pdf PDF
FA5685-14-R-0013-0012.doc DOC document
RESPONSE___8_MACC_Solicitation_FA5685-14-R-0013.docx DOCX document
Response___7-Solicitation___FA5685-14-R-0013.docx DOCX document
Attachment___31.docx DOCX document
Attachement___32.pdf PDF
FA5685-14-R-0013-0011.doc DOC document
RESPONSE___5_MACC_Solicitation_FA5685-14-R-0013.docx DOCX document
FA5685-14-R-0013-0010.doc DOC document
Questions___4_Response_to_MACC_Solicitation-FA5685-14-R-0013.docx DOCX document
Attachment___30_Gypsumboard_Wall_Detail.pdf PDF
Attachment___29_MACC_CIVIL-STRUCTURAL_DRAWINGS_____1.PDF PDF
Attachement___28_MACC_CIVIL-STRUCTURAL_DRAWINGS.PDF PDF
FA5685-14-R-0013-0009.doc DOC document
Attachment___26_Section_H-4.docx DOCX document
FA5685-14-R-0013-0008.doc DOC document
Attachement___27_Supplement_to_2014_MACC_General_Specifications.docx DOCX document
FA5685-14-R-0013-0007.doc DOC document
INC-1104_Design_Review_Checklist.doc DOC document
PPL_Jun_2014.xls XLS spreadsheet
FA5685-14-R-0013-00005.doc DOC document
Past_Performance_Questionnarie__PPQ.docx DOCX document
Responses___2_to_Questions_for__MACC_Solicitation-5_July_14.docx DOCX document
RESPONSES_TO_QUESTIONS_FOR_MACC-SOLICITATION-FA5685-14-R-0013_-4_July_14.rtf RTF text file
FA5685-14-R-0013-0004.doc DOC document
Attachment___16_Asbestos_Register_List.pdf PDF
Attachment___8_LJYC_10-1052_INC_1106.xls XLS spreadsheet
Attachment___10_PPL_Feb_2012.xls XLS spreadsheet
Attachment___19_INC-1106_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment___17_LJYC_11-1009_Repair_Roof_Bldg..pdf PDF
Attachment___21_LJYC___11-1009.xls XLS spreadsheet
Attachment___18_INC-1101_Cost_Price_Breakdown.xlsx XLSX spreadsheet
Attachment___20_Drawings_-_LJYC_11-1009_Repair_Roof_Bldg._475.pdf PDF
Attachment___7_INC-1101_Cost_Estimate.xlsx XLSX spreadsheet
Attachment___25_INC-1108_Design_Review_Checklist.xlsx XLSX spreadsheet
Attachment___12_LJYC_10-1081_INC-1101_-_Untabulated.xlsx XLSX spreadsheet
MACC_Solicitation___FA5685-14-R-0013-13_June_14.doc DOC document
Attachement___1_2014_MACC_General_Specifications_Guide.pdf PDF
Attachment___4_MACC_Schedule_of_Items_(Blank)__25_Feb_14-FINAL.xls XLS spreadsheet
Attachment___23_INC-1101_KTR_Cost_Estimate.xlsx XLSX spreadsheet
Attachment___11_SOW_LJYC_10-1081.pdf PDF
Attachment___5_Site_Visit_Reservation_Form3_FA5685-14-R-0013.docx DOCX document
Attachment___6_SOW_LJYC_10-1052.pdf PDF
Attachment___14_Drawings_LJYC_10-1081.pdf PDF
Attachment___15_LJYC___1081_PPL__Feb_2012.xls XLS spreadsheet
Attachment___24_INC-1106_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment___22_SOS_for_MOCK_Project_Ren_B_444.doc DOC document
Attachement___2_MACC_Design_Guide_2014.docx DOCX document
Show all 50

MACC Solicitation # FA5685-14-R-0013 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSE # 3 TO MACC SOLICITATION # FA5685-14-R-0013

Q # 1: IAW The solicitation, Seed project 3 name is “ Repair Roof and Windows Communication Bldg. 475”. But We could not see any items in regards to windows on drawings and SOW. Please let us know status of Windows on this project?

Response: The window protection will be provided by extending the one meter roof overhang.

Q # 2: IAW the seed project 3, Rpr Roof and Windows Bldg 475, There is a conflict in SOW regarding the West of bldg 475 (over the room no 103) so that is it going to be painted or replaced with new panel?

Response: Room Number 103 is a flat roof section with Asbestos containing material in the roofing. It is not being roofed. It does not leak. It is not to be disturbed. It shall not be used for access nor storage. It is to be protected from damage during the work.

Q # 3: IAW the seed project 3, Rpr Roof and Windows Bldg 475, we are requested to provide shop drawing but we have no information about existing roof structure. Also, IAW the SOW, metal structure will be need on the stair hall but we don’t know existing structure steel or wooden? Please provide us detail information regarding the steel structure.

Response: There are TIFF files form building 475, but none show what the roof addition of the metal roof nor its structural system.

Q # 4: IAW the mock project, SOW ;Structural item 1.1.2.1 “Design upgrade to Plotter room floor slab and connected building frame to account for additional 4000 kg static load distributed evenly throughout the room, and a 1000kg dynamic load (shredder referenced in Item h., above), vibrating at a frequency of 2.8 Hz/s” ; Normally this type of bldg’s load bearing capacity is 200-240 kg/m2. This plotter room is 32 m2 and total load bearing capacity is 6.400kg-7.680 kg. If we are requested additional load (4000 kg + 1000kg), we have to know existing condition( beam, column, foundation and floor dimension, reinforcement total area and diameters, existing concrete capacity) . If we are not requested additional load, existing capacity will be enough. Please let us know status of existing structure.

Response: Additional load is required in this analysis; as-built drawings will be provided (see first questions above.)

Q# 5: Can you give information about dedicated circuit breaker of MDP, what is the Amper value and technical specification for LJYC 10-1052 Rpr Replace Roll-Up Doors, ODC Bldg #977

Response: Provide dedicated circuit breaker according to proposed roll up door recommneded by manufacturer.

Q# 6: Can you give more information about, security system and new wiring of alarm system for roll-up doors for LJYC 10-1052 Rpr Replace Roll-Up Doors, ODC Bldg #977.

Response: Provide new wiring IAW NFPA 70 and manufacturer recommendation. Provide personel protection options required during open/close operations.

Q # 7: We request more information about, working procedure of alarm bell&strobe for LJYC 10-1081 RPR Walk-in Reefers, Dining Facility, Bldg. #965

Response: Please check out NFPA 72 for requirements.

Q #8: What is the location, single line diagram and power of new panelboards for LJYC 10-1081 RPR Walk-in Reefers, Dining Facility, Bldg. #965

Response: KTR shall design location, SLD and power of new panelboards.

Q #9: What are the electrical cable lenghts between condencer and evaporator for LJYC 10-1081 RPR Walk-in Reefers, Dining Facility, Bldg. #965.

Response: KTR shall design location of condencer and evaparator.

Q#9: Do you request new lightning protection system or can we reinstall existing materials for LJYC11-1009 RPR BLDG 475

Response: Provide new LPS IAW NFPA780.

Q # 10: Schedule of items, architectural, item#31 “Removal of lead based paint” – could you please clarify where and on what substrate (metal or concrete ..etc) it is located at.

Response: Removal of lead based paint of sheet metal downspouts and gutters.

Q # 11: In the Schedule of Items Plumbing Item#29 the Properties of Flush Valve has not beendefined, would you please give more information.

Response: (Repeat) Question. Answered in Previous to Questions.

Q # 12: In the Schedule of Items Fire Protection System Item#2 the Properties of Fire Hose & Equipment has not been defined, would you please give more information.

Response: (Repeat) Question. Answered in Previous to Questions.

Q # 13: In the Schedule of Items Fire Protection System Item#4 the Properties of Fire Pump Controller has not been defined, would you please give more information.

Response: (Repeat) Question. Answered in Previous to Questions.

Q # 14: In the Schedule of Items Fire Protection System Item#5 the Properties of Fire Valves has not been defined, would you please give more information.

Response: (Repeat) Question. Answered in Previous to Questions.

Q# 15: In the Schedule of Items Fire Protection System Item#6 the Properties of Sprinkler System Head has not been defined, would you please give more information. (Repeat)

Q # 16: In the Schedule of Items HVAC Item#2 the Properties of Burner has not been defined, would you please give more information.

Response: (Repeat) Question. Answered in Previous to Questions.

Q # 17: In the Schedule of Items HVAC Item#3 the Properties of Duct Heater has not been defined, would you please give more information.

Response: (Repeat) Question. Answered in Previous to Questions.

Q # 18: In the Schedule of Items HVAC Item#4 the Properties of Make Up Air Unit has not been defined, would you please give more information.

Response: (Repeat) Question. Answered in Previous to Questions.

Q # 19: In the Schedule of Items HVAC Item#6 the Properties of Heat Exchanger has not been defined, would you please give more information.

Response: (Alfa Laval or Equal)

PLATE TYPE HEAT EXCHANGER

CAPACITY: 125 KW

PRIMER SIDE (ΔT ):20 °C

SECONDER SIDE: 20/60 °C

MAX OPERATING/TEST PRESSURE (BAR): 10/16

MIN-MAX OPERATING TEMPERATURE (°C): -20 °C to +160 °C

FRAME MATERIAL: STEEL COATED WITH EPOXY POLYESTER

CONNECTION SIDE 1: THREADED PIPE BSP, AISI 316, 1-1/4"

CONNECTION SIDE 2: THREADED PIPE BSP, AISI 316, 1-1/4"

Q # 20: In the Schedule of Items HVAC Item#11 the Properties of Flow Meter has not been defined, would you please give more information.

Response: IP68, stainless steel connection box, titanium measuring electrodes, Modbus interface (KROHNE OPTIFLUX 2300 W or Equal

Q # 21: In the Schedule of Items HVAC Item#17 the Properties of Water Heater has not been defined, would you please give more information.

Response: (Repeat) Question. Answered in Previous to Questions.

Q # 22: In the Schedule of Items HVAC Item#18 the Properties of Water Softener has not been defined, would you please give more information.

Response: (Repeat) Question. Answered in Previous to Questions.

Q # 23: In the Schedule of Items HVAC Item#19 the Properties of Water Supply Meters has not been defined, would you please give more information.

Response: IP68, stainless steel connection box, titanium measuring electrodes, Modbus interface (KROHNE OPTIFLUX 2300 W or Equal)

Q # 24: In the Schedule of Items HVAC Item#22 the Properties of Fan Coils has not been defined, would you please give more information.

Response: (Repeat) Question. Answered in Previous Response to Questions.

Q # 25: In the Schedule of Items HVAC Item#27 the Properties of Freezer/Cooler Units has not been defined, would you please give more information.

Q # 26: In the Schedule of Items HVAC Item#28 the Properties of Ductwork & Accessories has not been defined, would you please give more information.

Q # 27: In the Schedule of Items HVAC Item#30 the Properties of Kitchen & Range Hoods has not been defined, would you please give more information.

Response: Ductless Type, Carbon Filtered, (Broan Model 41000 or Equal) Q # 28: In the Schedule of Items Fuels Item#4 the Properties of HLVD System has not been defined, would you please give more information.

DO NOT CONSIDER FUELS ITEM#4 “HLVD System”

As the proposal documentation to be submitted is very much limiting which information to be provided in which form a- We would like to know where we shall address the above asked items in the proposal. Provide narrative of proposed work plan for Items a through e. No design is required in the proposal.

In addition to that as these items are very much design related and requires some effort to produce with drawings and reports, b- We also would like to know to what extent we shall address these items? See response to “a.”, above.

c- Will one paragraph for each item very roughly explaining the issue be enough at this proposal stage? One paragraph should be sufficient.

1- LJYC-11-1009 Repair Roof Bldg. 475, According to the Autocad drawings there is 2 options for the roof. option 1 is replacing all the roofincluding an extension , option 2 is replacing the north side of the roof including an extension on the staircase. GARY a- According to sow there is only work items for option 2, could you provide work items for option one? Either of the two options on sheet A1 can be used, or a third option can be proposed by the contractor. The entire roof must be reskinned in any of the designs. Yellow highlighting on drawing A1 is included for clarity on that option, so that contractors understand that that portion of the roof must also be reskinned.

b- For option 1 could you provide cross section of the existing roof? No, we cannot provide as-built drawings, because they do not exist.

c- For option 1 the roof structure has some modifications, could you provide specifications? This is a design-build project that must meet code.

d- Is there any surge protection device need for new LPS in the bldg #475?

2- Could you give detailed information for line item #12 transformer protection panelboard listed in attchment 4 MACC schedule of items? TCP will provide local or remote open/close operation for RMU (ABB, Siemens or equal). Provide alarm/trip information for winding temperature, bucholz, high voltage circuit breaker fault.

3- Could you specify the location of the location of the existing alarm panel for bldg #977? Please see as-builts to be provided.

4- What type of lighting is preferable for cold rooms in bldg #965, led or flourescent? Flourescent.

5- LJYC 10-1081 RPR Walk-in Reefers, Dining Facility, Bldg. #965, OZGUR

1. Is there enough space for units on the roof?

Yes.

1. Can we install the units exactly above the cooler and freezer rooms?

Yes. Consider maximum manufacturer allow copper pipe length from outdoor unit to indoor unit.

1. What are the locations of the roof drainages? (for condensation pipe installation purposes) Please see as-builts to be provided.

1. Which rooms have panels to remove?

Please see as-builts to be provided.

1. The demolish plan which is in the Drawing C1 has blue lines , are they cooler and freezer panel just to remove or room no #116 and #126 also has panels to remove ?

Yes. Room no #116 and #126 also has panels for removal.

1. What is the high of existing panels?

Please see as-builts to be provided.

1. What type of condensation pipe will be used, metal or pvc ?

PVC c/w rubber insulation.

6- Bldg #965,

1. What type of gas will be discharged from the units?

R-22

1. What is the capacity of the units Please see as-builts to be provided.

1. According to specs. Section 04 23 00 , Para. 2.1-GLASS BLOCK UNITS ; there are four different type Glass Block (Exterior Glass Block Units, Interior Glass Block Units, Solid Glass Block Units, Fire Rated Glass Block Units ) . Please clarify the type of required glass block described in Schedule of Architecture- Item #1- Glass Block (15cm thick). Glass Block unit prices differ per the type of required block type so the requirement needs to clarified. (Lara Cam/Glass Brick 80mm thick, Clear Wavy)

1. According to Specs. Section 08 11 13, item#2, there are several several steel doors described. However It is not clear which steel door type needs to be priced under Schedule of Architecture, Item #9 Steel doors. Please clarify.

Response: (1.5mm thick coil coated sheet metal door)

Question: According to this respond there should be renovation on both Ground and First floor toilets such as demolition of ceramic wall and floor tiles; removal of existing water closets, urinals, partition walls; new ceramic tile installation etc. Toilets renovations is not clearly stated in architectural Section in Mock design SOW.

Response: Work includes pipe plumbing only; no fixtures, tile (except for repair), partitions, etc.

Question # 29: Mock project SOW 1.1.5.1 Design upgrade to Plotter room floor slab and connected building frame to account for additional 4000 kg static load distributed evenly throughout the room, and a 1000kg dynamic load (shredder referenced in Item h., above), vibrating at a frequency of 2.8 Hz/s.

Where is item h.. on mock Project SOW.? Please clarify.

Response: Item h should be item 1.1.4.3

Question # 30: Mock project SOW 1.1.5.1 Design upgrade to Plotter room floor slab and connected building frame to account for additional 4000 kg static load distributed evenly throughout the room, and a 1000kg dynamic load (shredder referenced in Item h., above), vibrating at a frequency of 2.8 Hz/s.

To design upgrade to Plotter room floor slab, please provide referenced shredder technical data.

SHREDDER TECH DATA IS NOT REQUIRED TO CONDUCT STATIC OR DYNAMIC ANALYSIS.

Question # 31: Mock project SOW 1.1.5.1 Design upgrade to Plotter room floor slab and connected building frame to account for additional 4000 kg static load distributed evenly throughout the room, and a 1000kg dynamic load (shredder referenced in Item h., above), vibrating at a frequency of 2.8 Hz/s.

To design upgrade for Plotter room floor slab please provide existing strength data due to losing of loading capacity of structure in time or Provide assuming strength data to use in our calculations. GIVEN AT PREVIOUS QUESTIONS

Does the MACC contractors have to submit price proposal for every task order?

Response: Awarded MACC contractors are not requried to submit for each task orde under the MACC contract. Price proposals are required for each seed project and “MOCK” design project in response to MACC Solicitation.

There is a past performance assessment sheet on Attachments so that it seems like evaluation form Air Force. Will Air Force contractors submit this form due to th this information are avialable in CCASS? Are we going to provide this form to inspector or CO once again to fill and sent to you or government sent it to them? Please give us more information to us regarding this form?

Resposne: Please forward guestionaire to the appropriate government respensitive for response, then instruct that member to forward to our office once complete.

Civil / Structural

1. Civil/Structural Item no: 28-29-30-31-32 Please provide drawing for mentioned model Response: Please see attached drawings.

2. Civil/Structural Item no: 37 Please provide drawing and detail for reflectorized Traffic Sign Response: Please see attached drawings.

3. Civil/Structural Item no: 38-39 Please provide drawing for existing and new manhole

Response: Work includes changing elevations of existing manhole (Electric, Communication, Sewer, Storm etc) covers up or down depending on new conditions.

4. Civil/Structural Item no: 42 Please provide more information about corrugated metal pipe

Response: Please see MACC Specification Div. 33 Section 33 40 00 Para 2.1.3.a Corrugated Steel Pipe Type I a

5. Civil/Structural Item no: 43-44 Is it required gasket for pipe, please clarify Yes

6. Civil/Structural Item no: 46-47 Is it required gasket for pipe, please clarify Yes

7. Civil/Structural Item no: 49-50-51 Could you please provide detailed drawing ? Please see attached drawings.

IAW The solicitation, Seed project 3 name is “ Repair Roof and Windows Communication Bldg. 475”. But We could not see any items in regards to windows on drawings and SOW. Please let us know status of Windows on this project?

Response: The window protection will be provided by extending the one meter roof overhang.

• IAW the seed project 3, Rpr Roof and Windows Bldg 475, There is a conflict in SOW regarding the West of bldg 475 (over the room no 103) so that is it going to be painted or replaced with new panel?

Response: Room Number 103 is a flat roof section with Asbestos containing material in the roofing. It is not being roofed. It does not leak. It is not to be disturbed. It shall not be used for access nor storage. It is to be protected from damage during the work.

• IAW the seed project 3, Rpr Roof and Windows Bldg 475, we are requested to provide shop drawing but we have no information about existing roof structure. Also, IAW the SOW, metal structure will be need on the stair hall but we don’t know existing structure steel or wooden? Please provide us detail information regarding the steel structure.

Response: There are TIFF files form building 475, but none show what the roof addition of the metal roof nor its structural system.

• IAW the mock project, SOW ;Structural item 1.1.2.1 “Design upgrade to Plotter room floor slab and connected building frame to account for additional 4000 kg static load distributed evenly throughout the room, and a 1000kg dynamic load (shredder referenced in Item h., above), vibrating at a frequency of 2.8 Hz/s” ; Normally this type of bldg’s load bearing capacity is 200-240 kg/m2. This plotter room is 32 m2 and total load bearing capacity is 6.400kg-7.680 kg. If we are requested additional load (4000 kg + 1000kg), we have to know existing condition( beam, column, foundation and floor dimension, reinforcement total area and diameters, existing concrete capacity) . If we are not requested additional load, existing capacity will be enough. Please let us know status of existing structure.

Response: Additional load is required in this analysis; as-built drawings will be provided (see first questions above.)

Our question is which para is correct? If page 45 of 46 is correct, it is not fair opportunity for most of contractors due to there are few contactors have 3 project value is equal or bigger than $1.5M. Also, previous MACC contract requires that relevant contract value has to be between $250K-$500K.

Response: Please refer to Note on page 45.

We understood above para that (3) contract total value is up to $1.5M (Smaller than 1.5 M) and it is acceptable so that nature of this project’s task order around 100-250 K but IAW that page 45 of 46, para d, “Magnitude. Relevancy in regard to magnitude will be evaluated based on, but not limited to, includes contracts/projects with a value of $1.5M annually or an aggregate of contracts/projects totaling $1.5M”.

Response: Please refer to Note on page 45.

“As per the RFP requirement, Contractor is required to provide the design including all drawings, specifications, and calculations for Mock Project. As a bidder, we have contacted with several A/E firms and individuals who requested $25K thru $40K fee for this design work. We believe that, this type of a requirement during bid phase is unfair and unreasonable, but not quite sure if it is as per FAR regulations. We hereby ask the Government if this requirement can be waived or at least reimburse the cost of this design work for the non‐awardee firms.”

Response: Requirement will not be waived. No reimbursement will be awarded to offorers for design work accomplihsed to provide “MOCK” deisgn project in response to the MACC Solicitation.

Can CCASS evaluation reports be used instead of PPQ? Is preparation of PPQ compulsory?

Response: Please reference Not on page Page 45 for guidance.

Question 5: The seed project drawing is not included building elevations and sections. To respond solicitation requirements, please provide building 475 elevations and sections especially asbestos containing area.

Response: There are only TiFF files no cad drawings.

Question 6: Mock design project consist only SOW in solicitation package. Please provide concept drawings and/or as-build drawings for bldg. 444 on all disciplines (Architectural, Structural, Civil, Mechanical and Electrical).

Response: CAD drawings provided

1. Summary of Work 06/06: Para 1.10 EPA Designated Items: Mentions the use of certain materials with certain recycling contents etc. For majority of Turkish materials there is no such data available.

Provide recyclable material when available.

1. Sec014500 Construction Quality Control: Para 1.4.2.1: There is a requirement for a LEED Commissioning Authority. Please clarify if the government is incorporating LEED certification and if so which level is required.

LEED level will be determined by each building separately. Contractor will be required to obtain the services of a LEED certified design professional. Contractor should use the latest version of attached Air Force Sustainable Facilities Guide.

1. Technical Part of Entire Specs: The local construction industry is using CE, European Quality Certifications as reference. In that sense based on previous construction projects and import item discussions the base is also preferring CE approved materials other than some critical cases as determined by CE. The current specs provided make all the reference to US standards and does not make any reference to CE certifications and this may be a conflict for projects to be executed. (Gul) UL listed is required for fire protection components and systems (e.g. fire pumps, fire doors, etc.). UL listing is also required for a limited number of electrical items (e.g. emergency lighting, surge protection). CE and TSE labelling is required as appropriate.

1. Seed Project RPR BLDG 475

0. Could you please provide existing roof section and existing roof structure drawings? Provided on DVD.

0. Architectural Drawings Sheet A1: There are two new roof plans please identify which new plan will be used ? Either of the two options on sheet A1 can be used, or a third option can be proposed by the contractor. The entire roof must be reskinned in any of the designs. Yellow highlighting on drawing A1 is included for clarity on that option, so that contractors understand that that portion of the roof must also be reskinned.

0. Could you please provide specific information about the existing roof structure like

2. Material type of the structure (steel, wood , aluminium and/or etc) As-builts do not exist for the underlying structure of the sloped metal roof.

2. Is there any repair or upgrade works needed for existing roof structure? No.

1. Mechanical Questions

1. Could you please provide drawings that show outdoor unit of existing freezer/cooler location of the Dining Facility , Building #965?

See attached “965 details.pdf”. Consider maximum manufacturer allow copper pipe length from outdoor unit to indoor unit.

1. Electrical Questions

1. Attachment#17_MACC_Scope of works for LJYC 11-1009_Sow Item#6 Contractor design and furnish and install Lightning protection system; Could you please clarify if the new lighting protection system will be connected to the existing grounding loop or not?

New grounding ring with grounding rods shall be provided

1. Could you please provide as built drawings that show existing Panel boards location of the ODC Building #977 for Roll-up Doors?

1. Could you please provide as built drawings that show existing Panel boards location of the Dining Facility , Building #965?

1. Could you please provide as built drawings that show existing grounding system location of the Building #475?

1. Attachment___4_MACC_Schedule_of_Items_(Blank)__25_Feb_14-FINAL.xls

1. Architectural (Gul)

0. Architectural Item no: 3, please clarify the density of glass wool insulation Izocam Glasswool Insulation, 5 cm thick (Density:20kg/mᶟ)

0. Architectural Item no: 4, please clarify the density of Extruded Polystyrene Foam Insulation Izocam Polystrene Foam Insulation 2500P, 5cm thick (Density: Min. 26-30kg/mᶟ)

0. Architectural Item no: 6, please clarify the thickness of Sandwich type Insulation Teknopanel Standard Wall Panel, WP-S (Insulation: Polyurethane, 50mm core thickness)

0. Architectural Item no: 7 ,Steel Standing Seam Sheet Metal Roof & Wall Panels (1.0mm thick), Could you please provide detailed drawing? Please see Akmetal Trapezoidal Standing Seam Sheet Metal Roof & Wall Panels

0. Architectural Item no: 8, please identify the thickness of the downspouts 1mm thick factory painted sheet metal downspout (Color: RAL 8017)

0. Architectural Item no: 9-10, please identify the thickness of metal sheet of doors and frames 1.5mm thick coil coated sheet metal door and door frame

0. Architectural Item no: 10, please clarify the fire rated hours . Is it requires any certification ? UL Listed 2 hour fire rated door

0. Architectural Item no: 11, please clarify the type of wooden door; laminated, natural veneered door or etc. High pressured laminate veneered solid core wood door c/w 1.5mm thick hot dip galvanized sheet metal frame, lock sets and hinges

0. Architectural Item no: 12, please clarify the thickness and features of doors. Horman Decotherm-A Roll-up Door (360x400cm)

0. Architectural Item no: 13, please clarify the thickness of glasses and features of doors. Geze Sliding Door, EC Drive (300x220cm)

0. Architectural Item no: 14-15, please clarify the type of aluminium frame Cuhadaroglu Izopen Thermal Insulated Door Profile, 1.4mm thick

0. Architectural Item no: 19, please clarify the features of lock set Kaba C-Lever Compact

0. Architectural Item no: 20, please provide the detailed drawing for gypsum board partition wall system Please see attached Gypsumboard Wall Detail Pdf document

0. Architectural Item no: 21, please clarify the dimension of Non-skid Granite Ceramic Floor Tiles Vitra Arkitekt Dotti Dark Grey 30x30cm

0. Architectural Item no: 23, please clarify if it will be normal or high density ? Provide humidity range for both material? a)Normal Density: Armstrong Fine Fissured,9121M

Architectural Item no: 25-26, please clarify the thickness of Resilient Vinyl (PVC) Flooring 25-Tarkett Acczent Excellence 80 26-Tarkett Optima Multisafe-2mm

0. Architectural Item no: 27 please clarify the thickness of Resilient Flooring Forbo Marmoleum Real, 4mm thick

0. Architectural Item no: 37 please provide more information about Insulated Exterior Paint system detail Filli Boya,Capatect-S Thermal Insulation Paint

0. Architectural Item no: 40 please provide more information about Ready Mixed, Thermal Exterior Coating System detail Filli Boya, Capatect Acrylic Thermal Insulation Plaster

0. Architectural Item no: 41 please specify the application surface for Epoxy Resin Based Primer & Two Component Paint Concrete Slab

0. Architectural Item no: 44, please determine the dimensions of cabinets Semi-Recessed Fire Extinguisher Cabinet, WxLxD:30.5 x 66 x 24cm

0. Architectural Item no: 46, please clarify the features of Stainless Steel Sink Franke AMX 611, Inox

0. Architectural Item no: 48, please provide more information about Terrazzo Tiles Ozcete Karo, Double Layer, K410 (30x30x2.5cm)

0. Architectural Item no: 49, please provide more information about Terra Cota Tiles Toscana Tiles 201, 20x20x2cm

1. Mechanical (Ozgur)

1. Plumbing Item#1 Backflow preventer (4’’) ; Could you please clarify What kind of backflow preventer will be used ? (Double check valves assemblies or Pressure reduced zone assemblies or … etc) .What will the maximum working pressure of backflow preventer be ?What type of material and/or coating will be used?

Response: Reduced Pressure Zone Assemblies, Cast Iron,175 psi, ( WATTS LF909-OSY or equal)

1. Plumbing Item#2 Cleanouts (4’’) ; Could you please clarify What type of material will be used ?(Metal, plastic or cast iron and etc...)

Response: Watts Drainage CO-200-H epoxy coated cast iron floor cleanout with round adjustable nickel bronze top with wide flange for elastomeric flooring, removable gas tight gasketed brass cleanout plug, and no hub (standard) outlet.

1. Plumbing Item#3 Faucet ; Could you please clarify What type of faucet will be used ?(Bathroom Sink faucet , Kitchen faucet ,Shower ,Kitchen Sink…etc) Artema A42073 Kitchen Faucet

1. Plumbing Item#4 Hydrant (6’’) ; Could you please clarify What kind of hydrant will be used ? (Above Ground, Underground , Wet or Dry type … etc) .What will be the maximum working pressure of hydrant?

Response :Above ground WET type 6" fire hydrants(150/150) c/w feed line (6") and all necessary fittings. Hydrants barrels shall be long enough to permit at least 450 mm (18-inch) clearance between the center of the 115 mm (4-1/2-inch) suction connection and grade.Hydrant shall have 2 each 2 ½’’ hose connection. Shaft connected screwed nut (at the end of the shaft) material must be brast . (TERMO or Equal)

1. Plumbing Item#5 Floor Drain ; Could you please clarify What size and type of floor will be used? (Circular or Diagonal).What will be material used for floor drain (plastic, chrome coated..etc) DN75,30 lt/min, 115x115mm stainless steel (HL310NPr or equal)

1. Plumbing Item through #7- #13 Pipe and fittings ; Could you please clarify What will be the thickness of the pipe (SCH and/or PN )?

Item7- Schedule 40 Item8- TYPE-K (ASTM B88 STANDARD) Item9- Schedule 40 Item10-SDR 7.4 , PN 20 Item11- SDR 7.4 , PN 20 Item12- Schedule 40S Item13- Schedule 40

1. Plumbing #14 Pipe Insulation ; Could you please clarify What will be the material of the pipe insulation?

Aluminum coated rubber , thermal conductivity is λ ≤ 0,035 W/mK. (at 0˚C), Water vapour diffusion resistance factor μ ≥ 140000.

1. Plumbing Item #15 Pipe ,Hangers and Support ;Could you please clarify What will be the material and type of Hangers and Support?

Galvanized carbon steel

1. Could you please clarify the type of the valves and strainer below like carbon steel, stainless steel, bronze or etc..?

8. Plumbing Item #16 Pressure Reducing Valves ;

8. Plumbing Item #17 Ball Valves

8. Plumbing Item #18 Butterfly Valves

8. Plumbing Item #19 Swing Check Valves

8. Plumbing Item #20 Gate Valves,

8. Plumbing Item #21 Globe Valves

8. Plumbing Item #22 Strainer Carbon steel

1. Plumbing Item #23 Bath Tub Plumbing Item #24 Lavatory ;Could you please specify the lavatory?

Under Counter Type Lavatory, Vitra 6031, White

1. Plumbing Item #25 Shower head ;Could you please specify the type of shower head?

Artema A45616 Aquamax Shower Head Set

1. Plumbing Item #26 Sinks ;Could you please specify the type of the sink ?

Franke LLX 651, Inox

1. Plumbing Item #27,#28 Urinals, Closets ;Could you please specify the urinals and closets?

#27 Vitra Urinal 6663BXXX-0199 , #28 Vitra 5321 LXXX-0088

1. Plumbing Item #29 Flush Valves ;Could you please specify the type and material of flush valves?

Sloan Royal-186-0.5 or Equal

1. Plumbing Item #30 irrigation sprinkler head ;Could you please specify the type and material of irrigation sprinkler head?

Toro DT35-56-356DL sprinkler or Equal

1. Could you please give specific information for the below listed pumps?

15. Pumps Item #1 Vertical Pumps ;

15. Pumps Item #2 Submersible Pumps

15. Pumps Item #4 Centrifugal Pumps

15. Pumps Item #5 Sump Pumps ;

(Repeat)

1. Pumps Item #3 Diesel/Natural Gas Fuelled Engine Pump Drives ;Could you please clarify What is required for the type of current induction ( AC or DC ? ) and rpm value of Diesel/Natural Gas Fuelled Engine Pump Drives?

Select Diesel Gas Fuelled Engine Pump Drives for 45 kw pump shaft power IAW NFPA 20: Stationary Fire Pumps Handbook, 2013

1. Fire Protection System Item #1 Wet Chemical Fire Hood Suppression Systems ; Could you please clarify What will be the size of Wet Chemical Fire Hood Suppression Systems?

(Repeat)

1. Fire Protection System Item #2 Fire Hose & Equipment ; Could you please clarify What pressure rating is required and type of the Fire Hose? Also please specify the “Equipments”?

Hose service pressure 150 psi , Angle Valve (UL/FM approval) , Hose rack frame (Stainless Steel Gr.304) , Hose rack nipple Hose coupling , Fire Hose - 30 mt. , Fog nozzle.

1. Fire Protection System Item #3 Fire Pump ; Could you please clarify What will flow rate and water head range of Fire Pump be? What will type of driver of fire pump be?

(Repeat) , electric motor driven

1. Fire Protection System Item #5 Fire Valves ; Could you please clarify What will type and size of Fire Valves be?

4” Gate Valve - Ductile Iron, Fire Protection, Resilient Wedge (Nibco F607RW 4 FLG RESIL WDG UL/FM GATE DI or Equal)

1. Fire Protection System Item #6 Sprinkler System Head; Could you please clarify What type of Sprinkler System Head will be used?

K5.6 , pendant type,68 C, NPT Thread Size 1/2” (Viking VK 302 or equal)

1. Fire Protection System Item #7 PP-R Fire Fusiolen Pipe Welding Machine; Could you please clarify What will size range of pipe to be welded be?

Size range from 1/2” to 4”

1. HVAC Item #1 Boiler ; Could you please clarify What will type and classification of Boiler be? Which type of fuel will boiler be compatible?

(Repeat)

1. HVAC Item #2 Burner ; Could you please clarify What will type and classification of Burner be? What type of fuel will be used for burner?(Light Oil, Natural Gas, Heavy Oil etc) Compatible (manufacturer recommended) burner for Viessmann VITOPLEX 200 for diesel fuel (120 kw) or equal

1. HVAC Item #3 Duct Heater ; Could you please clarify What will type of duct Heater be? Will it be circular or diagonal? What will dimensions of duct heater be? Which of accessories will be needed for Duct Heater like , terminal block, time delay relays, pilot lights, pressure electric switches, solid state relay ,disconnect switches...etc?

Size 36”x36” ,50 HZ,220 v, 15 kw with , three phase, 80/20 (Ni/Cr) resistance wire ,fan interlock, Power terminal board, Control terminal board, Grounding lugs, Automatic limit switch for primary over temperature protection, Manual reset limit switch for secondary over temperature protection, Left hand offset control box, terminal block, time delay relays, pilot lights

1. HVAC Item #4 Make-up air unit ; Could you please clarify What will type of components be for Make-up Air Units? (Filters, heating and cooling element, humidifier, mixing chamber, blower fan, heat recovery device ... etc.)What will air flow rate be of make-up air unit?

Standard package system ,UL/cUL 762, (Greenheck MSX - 108 – H12 or Equal)

1. HVAC Item #10 Automatic Air Vents ; Could you please clarify What will material of automatic air vents be?

(Honeywell EA122A1002 or Equal)

1. HVAC Item #11 Flow meters ;Could you please clarify What type of flow meter will be used? What kind of fluid will be measured by flow meter?

IP68, stainless steel connection box, titanium measuring electrodes, Modbus interface (KROHNE OPTIFLUX 2300 W or Equal)

1. HVAC Item #12 Balance Valves ;Could you please clarify What type of balance valves will be used?(Manual, Automatic..etc) What will material of balance valve be?

(Herz 4017 or Equal)

1. HVAC Item #13 3-Way Mixing Valves ; Could you please clarify What type of 3 way mixing valves will be used?( Mixing or Diverting …etc) . What will operating temperature and pressure be ?

(Honeywell V5013F Mixing or Equal)

1. HVAC Item #14 Water Based Liquid Chillers ; Could you please clarify the type of chiller? (Water-cooled scroll, water-cooled screw, single stage absorption, two stage absorption...etc)? Does capacity 120 kW state minimum , maximum or average value for Chillers?

(Repeat),maximum capacity

1. HVAC Item #16 VRF Indoor Unit ; Could you please clarify what will type of indoor unit be? (Wall mounted, ceiling 1,2,4 ways cassette ,ceiling concealed ducted , ceiling suspended) Response: (Repeat) Question. Answered in Previous to Questions.

1. HVAC Item #17 Water Heater ; Could you please clarify how many gallons/litres will water storage capacity of water heater be?

(Diko DSSY -200V or equal)

1. Fuels Item #1 Fuel Pump ; Could you please clarify What will flow rate and water head range of vertical pumps be? What type of pumps will be used? What kind of fuel will be pumped?

Response: (Repeat) Question. Answered in Previous to Questions.

1. Fuels Item #2 Fuel Storage Tank ; Could you please clarify will storage tank be used for underground or above ground application? Will it be double-walled or single walled?

Response: (Repeat) Question. Answered in Previous to Questions.

1. Fuels Item #5 PN16 Valves, Strainers, Check valves ; Could you please specify the “Valves”?(Ball valve, gate valve, globe valve...etc).

Ball valve

1. HVAC Item #18 Water Softener; Could you please clarify what is the degrees of hardness and conductivity of water? What is working pressure of supply water line? Will softened product water pumped directly to the system or storage tank?

Conductivity :954 (µS/cm) , Hardness Level: 40 French degrees, water network pressure 1.8 bar.

1. HVAC Item #19 Water Supply Meter; Could you please clarify What will type of componets be for Air Handling Units? (Filters,heating and cooling element,humidifier,mixing chamber,blower fan,heat recovery device ... etc.)What will air flow rate be of air handling unit?

Question is not related with Item #19

1. HVAC Item #21 Air Handling Unit; Could you please clarify exactly What will type of componets be for Air Handling Units? (Filters,heating and cooling element,humidifier,mixing chamber,blower fan,heat recovery device ... etc.)What will air flow rate be of air handling unit?

Response: (Repeat) Question. Answered in Previous to Questions.

1. HVAC Item #22 Fan Coils; Could you please clarify What type of Fan Coil will be used?.

(Carrier 42 FA-08-2-B-U-W or Equal)

1. HVAC Item #24 Rooftop Air Package type; Could you please give more information about unit compressor, condenser coil, evaporator coil, belt drive data…etc?

Response: (Repeat) Question. Answered in Previous to Questions.

1. HVAC Item #27 Freezer/Cooler Units; Could you please clarify What will capacity of freezer/cooler unit be for indoor and outdoor units?

CARRIER SCH NTZ 136 Z or equal for freezer unit CARRIER MAH 433 ZA or equal for cooler unit

1. HVAC Item #28 Ductwork&Accessories; Could you please clarify What will dimension and material of ductwork be? Will ductwork be circular or diagonal? What type of accessories will be used?

Rectangular duct ,90x90, 0,7 mm thickness solid sheet steel, c/w splitter

1. Electrical (Durmus)

2. Electric Item#6 220V receptacle ; Could you please clarify What is IP rated of receptacle. what kind of receptacles will be used WP type or indoor type ? It is indoor type with IP20 rating.

2. Electric Item#7 Lighting Switch ; Could you please clarify What is IP rated of Light switch. what kind of switch will be used WP type or indoor type ? It is indoor type with IP20 rating.

2. Electric Item#13 Power Line Surge Protection, 80kA ; Could you please clarify What is the standard of Surge protection (UL listed or etc.) it is UL listed.

2. Electric Item#14 CCV type Ring Main Unit ; Could you please clarify What is the type of CCV RMU, motorized etc.? It is motorized CCV RMU.

2. Electric Item#24 4x18W Fluorescent Lighting Fixture ; Could you please clarify What is type of lighting fixture, double parabolic or Plexiglas cover, electronic ballast etc.? It is double parabolic with 4 each electronic ballast.

2. Electric Item#26 200A Ring Main Unit Elbow ; Could you please clarify What is type of Cable Connector, screw-in or Plug-in? It is plug-in type.

2. Electric Item#26 630A Ring Main Unit Elbow ; Could you please clarify What is type of Cable Connector, screw-in or Plug-in? It is screw-in type.

2. Electric Item#28 Occupancy Sensor ; Could you please clarify What is IP Rated of sensors ? It is IP20.

2. Electric Item#29 Fire Alarm and Mass Notification System, NFS2-3030 c/w all accessories ; Could you please clarify what will be used in this system only panel board and accessories? Only panelboard with accessories.

2. Electric Item#38 Building Entrance Protector For Comm. 25Pair ; Could you please clarify what is type of Building entrance protector, outdoor or indoor? It is indoor type.

2. Electric Item#40 Detectable Cable Marker ; Could you please clarify what is Dimension of cable marker, 3" or 6" ?. It is 6”.

2. Electric Item#41 Ground Fault circuit interrupter,20A ; Could you please clarify what is the IFN current ? It is 10mA.

2. Electric Item#45 50kVA Generator, 380V, 50Hz ; Could you please clarify what is type of generator, standby or prime, sound isolation cabinet. It is standby without sound isolation cabinet.

2. Electric Item#46 630x370x250cm Metal transformer substation Enclosure ; Could you please clarify what is the thickness of Wall and roof sheet, outer sheet, inner sheet for transformer substation. what is the colour code and type? what type of inside and outside lighting fixture? Thickness of outer sheet=0.5mm, Insulation=5cm, thickness of inner sheet=0.5mm, Color: RAL1015.

Civil / Structural (Gunalp) Civil/Structural Item no: 28-29-30-31-32 Please provide drawing for mentioned model Please see attached drawings.

Civil/Structural Item no: 37 Please provide drawing and detail for reflectorized Traffic Sign Please see attached drawings.

Civil/Structural Item no: 38-39 Please provide drawing for existing and new manhole Work includes changing elevations of existing manhole (Electric, Communication, Sewer, Storm etc) covers up or down depending on new conditions.

Civil/Structural Item no: 42 Please provide more information about corrugated metal pipe Please see MACC Specification Div. 33 Section 33 40 00 Para 2.1.3.a Corrugated Steel Pipe Type I a Civil/Structural Item no: 43-44 Is it required gasket for pipe, please clarify Yes Civil/Structural Item no: 46-47 Is it required gasket for pipe, please clarify Yes Civil/Structural Item no: 49-50-51 Could you please provide detailed drawing ? Please see attached drawings.