Attachment___24_INC-1106_Schedule_of_Material_Submittals.xls
XLS spreadsheet 199 KB Posted
- Attached to
- MACC Solicitation # FA5685-14-R-0013
- Solicitation number
- FA5685-14-R-0013
About this file
Attachment 24
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | SUBMITTAL SCHEDULE | NTP+10 D | ||||||||||||||||||||
| 2 | SAFETY PLAN | 3 | ||||||||||||||||||||
| 3 | QUALITY CONTROL PLAN | 3 | ||||||||||||||||||||
| 4 | KEY PERSONNEL LIST | 3 | ||||||||||||||||||||
| 5 | PROGRESS SCHEDULE | 3 | ||||||||||||||||||||
| 6 | EQUIPMENT DELIVERY SCHEDULE | 3 | ||||||||||||||||||||
| 7 | NOTICES FOR PROJECT COMPLETION AND FINAL INSPECTION | 3 | ||||||||||||||||||||
| 8 | OPERATION AND MAINTENANCE MANUALS (Hardcopy: 1 original, 2 copies and 1 CD) | 3 | ||||||||||||||||||||
| 9 | AS BUILT DATA (1 Original, 1 Red Line) | 1 | ||||||||||||||||||||
| 10 | HAZARDOUS MATERIAL LIST IN AF FORM 3952 | 3 | ||||||||||||||||||||
| 11 | PHASING PLAN | 3 |
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 4, May 2011)
ARCHITECTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ARCHITECTURAL | ||||||||||||||||||||||
| 1 | GYPSUM BOARD & WATER RESISTANT TYPE GYPSUM BOARD WALL COVERING C/W STEEL STUDS & RUNNERS | |||||||||||||||||||||
| 2 | GYPSUM BOARD CEILING COVERING C/W STEEL BOX PROFILE (40X60 MM.) | |||||||||||||||||||||
| 3 | SHOP DRAWINGS FOR GYPSUM BOARD CEILING AND WALL COVERING | |||||||||||||||||||||
| 4 | HOLLOW CORE CONCRETE BLOCK UNITS. SPECS. SEC. 04300 | |||||||||||||||||||||
| 5 | NEW STEEL INTERIOR STAIRS, HANDRAILS AND EDGE STRIPS (NOSING) | |||||||||||||||||||||
| 6 | WROUGHT IRON BALCONY RAILINGS | |||||||||||||||||||||
| 7 | SHOP DRAWINGS FOR WROUGHT IRON BALCONY RAILINGS | |||||||||||||||||||||
| 8 | EXTERIOR STEEL DOORS AND FRAMES W/ LOUVER | |||||||||||||||||||||
| 9 | NP STEEL BEAMS AND COLUMS FOR CARPORT AND BALCONY SUPPORTS | |||||||||||||||||||||
| 10 | CLAY TILE APPEREANCE PROFILED STEEL SHEET METAL ROOF PANELS, 0.70 MM. THICK & 32 DENSITY POLYSTRENE FOAM | |||||||||||||||||||||
| 11 | CLAY TILE APPEREANCE STEEL SHEET METAL ROOF PANELS | |||||||||||||||||||||
| 12 | DOOR CLOSER | |||||||||||||||||||||
| 13 | DOOR STOP | |||||||||||||||||||||
| 14 | DOOR LOCK | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | WALNUT VENEERED CORE WOOD INTERIOR DOOR | |||||||||||||||||||||
| 16 | METAL THRESHOLD FOR EXTERIOR DOOR | |||||||||||||||||||||
| 17 | ALUMINUM WINDOW C/W HARDWARE AND ALL REQUIRED ACCESSORIES | |||||||||||||||||||||
| 18 | SHOP DRW. FOR ALUMINUM WINDOWS | |||||||||||||||||||||
| 19 | ALUMINUM DOORS C/W HARDWARE AND ALL REQUIRED ACCESSORIES | |||||||||||||||||||||
| 20 | ALUMINUM ROOF LOUVER | |||||||||||||||||||||
| 21 | DOOR KNOCK / PEEP HOLE | |||||||||||||||||||||
| 22 | FIRE EXTINGUISHER CABINET | |||||||||||||||||||||
| 23 | NATURAL MARBLE WINDOW SILLS AND FLOOR TILES TO MATCH TO EXISTING MARBLE TILES | |||||||||||||||||||||
| 24 | GYPSUM PUTTY | |||||||||||||||||||||
| 25 | NON-SKID GRANITE CERAMIC FLOOR TILE | |||||||||||||||||||||
| 26 | CERAMIC WALL TILE | |||||||||||||||||||||
| 27 | READY MIXED JOINT GROUT FOR FLOOR AND WALL TILES | |||||||||||||||||||||
| 28 | SYNTHETIC PAINT & PRIMER FOR GALVANIZED METAL SURFACE | |||||||||||||||||||||
| 29 | SILICONE BASED INTERIOR & EXTERIOR PAINTS, AND PRIMER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | READY MIXED COLORED PLASTER | |||||||||||||||||||||
| 31 | NATURAL GRANITE COUNTER TOP | |||||||||||||||||||||
| 32 | CHROME PLATED OR STAINLESS STEEL HANDRAIL WITH ACCESSORIES FOR STAIRS | |||||||||||||||||||||
| 33 | HIGH PRESSURE LAMINATE KITCHEN TOP & BOTTOM CABINETS, C/W SHELVES, DRAWERS & ALL ACC. | |||||||||||||||||||||
| 34 | NATURAL WALNUT VENEERED CLOSETS, BOOKCASES, COUNTERS C/W SHELVES, DRAWERS & ALL ACC. | |||||||||||||||||||||
| 35 | ELECTROSTATIC PAINTED ALUMINUM & PLEXIGLASS BATHTUB/SHOWERTUB CABINET WITH SLIDING DOORS | |||||||||||||||||||||
| 36 | MIRROR | |||||||||||||||||||||
| 37 | 90% HUMIDITY RESISTANT TYPE, ACOUSTICAL SUS. CEILING SYS., C/W RUNNERS, HANGERS & ACC. | |||||||||||||||||||||
| 38 | SHOP DRAWINGS FOR ACOUSTICAL SUSPENDED CEILING TILES, C/W RUNNERS, HANGERS AND ACCESSORIES | |||||||||||||||||||||
| 39 | LAMINATED VANITY COUNTER WITH GRANITE COUNTER TOP | |||||||||||||||||||||
| 40 | LAMINATED MEDICINE CABINET | |||||||||||||||||||||
| 41 | STAINLESS STEEL TOWEL BARS (600 MM.) AND HOOKS | |||||||||||||||||||||
| 42 | 1 MM. THICK HOT DIP GALVANIZED, PAINTED TRAPEZOIDAL SHEET METAL PANELS | |||||||||||||||||||||
| 43 | LAMINATED SAFETY THERMAL GLASS (4+4)+6+4 MM. | |||||||||||||||||||||
| 44 | PAPER TOWEL DISPENSER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 45 | PAPER TOWEL DISPENSER | |||||||||||||||||||||
| 46 | LAVATORY TRAP | |||||||||||||||||||||
| 47 | CLOSET FLUSH VALVE | |||||||||||||||||||||
| 48 | FACTORY PAINTED GUTTERS AND, FLASHING C/W ACCESSORIES | |||||||||||||||||||||
| 49 | KILN DRY PROCESSED IMPREGNATED SOLID WOOD POST, RIDGE BEAM, PURLINS AND RAFTERS | |||||||||||||||||||||
| 50 | ORIENTED STRAND BOARD (OSB) 11 MM. THICK | |||||||||||||||||||||
| 51 | FACTORY PAINTED DOWNSPOUTS C/W ACCESSORIES | |||||||||||||||||||||
| 52 | LAMINATED SAFETY THERMAL GLASS (4+4)+6+4 MM. PVB 1,52 MM. THICK | |||||||||||||||||||||
| 53 | PLASTOMER POLYMER BITUMEN WATER PROOFING MEMBRANES & PRIMER | |||||||||||||||||||||
| 54 | CONCRETE SEALANT MATERIAL | |||||||||||||||||||||
| 55 | GLASS WOOL INSULATION, 50 MM. THICK | |||||||||||||||||||||
| 56 | NEW 4" PVC PLUMBING VENTILATION PIPE C/W NECESSARY FLASHING | |||||||||||||||||||||
| 57 | ASBESTOS CONTAINER | |||||||||||||||||||||
| 58 | CARPET TILE, ADHESIVE AND LAMINATED BASEBOARD | |||||||||||||||||||||
| 59 | ELECTROSTATIC PAINTED BLAST RESISTANT WINDOWS AND DOORS / FRAMES MAXIMUM BLAST PRESSURE (REFLECTED PRESSURE) SHALL BE 24 PSI IN ACCORDANCE WITH 25.00 M. STANDOF DISTANCE | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 60 | SHOP DRAWINGS FOR BLAST RESISTANT WINDOWS AND DOORS INDICATING THE EXACT DIMENSIONS OF THE WINDOWS&DOORS , ELEVATIONS AT 1/20 OR 1/25 SCALE & ALL DETAILS AT 1/1 OR AT 1/2 SCALE | |||||||||||||||||||||
| 61 | LAMINATED TEMPERED SAFETY THERMAL GLASS, COLOR:BRONZE (REFLECTED) | |||||||||||||||||||||
| 62 | PANIC HARDWARE, DOUBLE AND SINGLE | |||||||||||||||||||||
| 63 | ADHERENCE STRENGTHENING PRIMER, READY MIXED CEMENT BASED PLASTER AND FINISH COAT | |||||||||||||||||||||
| 64 | POLYMER BITUMEN WATERPROOFING, ROOF INSULATION | |||||||||||||||||||||
| 65 | Ω "OMEGA" SHAPED SHEET STEEL ROOFING SUPPORT MEMBER | |||||||||||||||||||||
| 66 | ALL TYPES OF PROFILES AND ACCESSORIES FOR THE INSTALLATION OF STANDING SEAM ROOFING SYSTEM | |||||||||||||||||||||
| 67 | POLYPROPYLEN VAPOR BARRIER | |||||||||||||||||||||
| 68 | 0.7 mm. THICK HOT DIP GALVANIZED AND COIL COATED SHEET STEEL ROOFING SYSTEM WITH STANDING SEAM | |||||||||||||||||||||
| 69 | 11 mm THICK OSB PANEL | |||||||||||||||||||||
| 70 | ALL TYPES OF EDGE, RIDGE AND MISCELLANEOUS PROFILE | |||||||||||||||||||||
| 71 | MISCELLANEOUS GRILL, LOUVER, DUCT, ANTENNA ETC. PENETRATION | |||||||||||||||||||||
| 72 | 3 mm THICK BITUMINOUS MEMBRANE | |||||||||||||||||||||
| 73 | 0.7 mm THICK TRAPEZOIDAL ROOFING PANEL | |||||||||||||||||||||
| 74 | 100 mm DIAMETER GALV. STEEL PIPE DOWNSPOUTS C/W INSTALLATION ACCESSORIES | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 75 | RAISED FLOOR SYSTEM | |||||||||||||||||||||
| 76 | SHOP DRAWINGS FOR RAISED FLOOR SYSTEM | |||||||||||||||||||||
| 77 | SILICONE BASED PAINT AND PRIMER | |||||||||||||||||||||
| 78 | READY MIXED COLORED PLASTER | |||||||||||||||||||||
| 79 | SYNTHETIC ENAMEL PAINT AND PRIMER | |||||||||||||||||||||
| 80 | METAL PRIMER FOR GALVANIZED SURFACES | |||||||||||||||||||||
| 81 | WOOD PROTECTIVE STAIN WITH VARNISH AND IMPREGNATE COAT | |||||||||||||||||||||
| 82 | EPOXY RESIN BASED PAINT AND PRIMER | |||||||||||||||||||||
| 83 | CEMENT BASED POLYMER MODIFIED SURFACE REPAIR GROUT | |||||||||||||||||||||
| 84 | AQCRYLIC RESIN BASED SEAL MATERIAL | |||||||||||||||||||||
| 85 | WATER BASED SATIN PAINT AND PRIMER | |||||||||||||||||||||
| 86 | SILICONE BASED INTERIOR PAINT AND PRIMER | |||||||||||||||||||||
| 87 | CEMENT BASED POLYMER MODIFIED REPAIR&FINISHING GROUT | |||||||||||||||||||||
| 88 | SOLVENT CONTAINING ACRYLIC RESIN BASEDCONCRETE SEAL MATERIAL | |||||||||||||||||||||
| 89 | EPOXY RESIN BASED PRIMER &NON-SKID MATERIAL | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 89 | EPOXY RESIN BASED PRIMER &SELF LEVELING MATERIAL, QUARTZ SAND & NON-SKID MATERIAL | |||||||||||||||||||||
| 90 | ONE COMPNENT POLYURETHANE BASED COLD JOINT SEALANT | |||||||||||||||||||||
| 91 | ||||||||||||||||||||||
| 92 | ||||||||||||||||||||||
| 93 | ||||||||||||||||||||||
| 94 | ||||||||||||||||||||||
| 95 | ||||||||||||||||||||||
| 96 | ||||||||||||||||||||||
| 97 | ||||||||||||||||||||||
| 98 | ||||||||||||||||||||||
| 99 | ||||||||||||||||||||||
| 100 | ||||||||||||||||||||||
| 101 | ||||||||||||||||||||||
| 102 | ||||||||||||||||||||||
| 103 |
FUEL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| FUEL | ||||||||||||||||||||||
| 1 | PE COATED FUEL PIPING | |||||||||||||||||||||
| 2 | FUEL PUMPS | |||||||||||||||||||||
| 3 | HLVD SYSTEM | |||||||||||||||||||||
| 4 | GATE VALVE PN 16 | |||||||||||||||||||||
| 5 | BALL VALVE PN 16 | |||||||||||||||||||||
| 6 | COATING | |||||||||||||||||||||
| 7 | CHECK VALVE | |||||||||||||||||||||
| 8 | PRESSURE RELIF VALVE | |||||||||||||||||||||
| 9 | SAFETY DEVICE | |||||||||||||||||||||
| 10 | CLAYTON VALVE | |||||||||||||||||||||
| 11 | INSULATION FLANGE | |||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 |
FIRE PROTECTION
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| FIRE PROTECTION | ||||||||||||||||||||||
| 1 | FIRE PUMPS | |||||||||||||||||||||
| 2 | JOCKEY PUMPS | |||||||||||||||||||||
| 3 | WATER STORAGE TANKS | |||||||||||||||||||||
| 4 | FIRE PROTECTION PIPING & ACCESSORIES | |||||||||||||||||||||
| 5 | BACKFLOW PREVENTERS | |||||||||||||||||||||
| 6 | POST INDICATOR VALVES | |||||||||||||||||||||
| 7 | OS&Y VALVES | |||||||||||||||||||||
| 8 | VALVES |
(GATE, CHECK, BALL, GLOBE ETC.)
| 9 | TEST & DRAIN VALVES | |||||||||||||||||||||
| 10 | BUTTERFLY VALVES | |||||||||||||||||||||
| 11 | ALARM CHECK VALVE ASSEMBLY | |||||||||||||||||||||
| 12 | SPRINKLER HEADS & ACCESSORIES | |||||||||||||||||||||
| 13 | FLOW SWITCHES | |||||||||||||||||||||
| 14 | SUPERVISORY SWITCHES | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | SUPPORTS & HANGERS | |||||||||||||||||||||
| 16 | HYDRAULIC CALCULATIONS | |||||||||||||||||||||
| 17 | HOOD FIRE SUPPRESSION SYSTEMS | |||||||||||||||||||||
| 18 | SHOP DRAWINGS OF FIRE PROTECTION SYSTEMS | |||||||||||||||||||||
| 19 | TESTING ADJUSTING & BALANCING | |||||||||||||||||||||
| 20 | RETARDING CHAMBER | |||||||||||||||||||||
| 21 | WATER GONG | |||||||||||||||||||||
| 22 | TEMPER SWITCH | |||||||||||||||||||||
| 23 | FLOW SWITCH | |||||||||||||||||||||
| 24 | PRESSURE SWITCH | |||||||||||||||||||||
| 25 | ||||||||||||||||||||||
| 26 | ||||||||||||||||||||||
| 27 | ||||||||||||||||||||||
| 28 | ||||||||||||||||||||||
| 29 |
HVAC
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| HVAC | ||||||||||||||||||||||
| 1 | PACKAGED TYPE A/C UNITS | |||||||||||||||||||||
| 2 | AIR HANDLING UNITS | |||||||||||||||||||||
| 3 | CONDENSER UNITS | |||||||||||||||||||||
| 4 | CHILLER UNITS | |||||||||||||||||||||
| 5 | BOILERS | |||||||||||||||||||||
| 6 | WATER HEATERS | |||||||||||||||||||||
| 7 | POWER VENTILATORS | |||||||||||||||||||||
| 8 | DUCTWORK | |||||||||||||||||||||
| 9 | DUCT ACCESSORIES (GRILLES, DAMPERS ETC.) | |||||||||||||||||||||
| 10 | VIBRATION ISOLATORS | |||||||||||||||||||||
| 11 | INSULATION (DUCT, PIPE, EQUIPMENT ETC.) | |||||||||||||||||||||
| 12 | WATER TANKS | |||||||||||||||||||||
| 13 | HEAT EXCHANGERS | |||||||||||||||||||||
| 14 | PUMPS | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | HYDRONIC SPECIALTIES | |||||||||||||||||||||
| 16 | PIPES & FITTINGS | |||||||||||||||||||||
| 17 | SUPPORTS & HANGERS | |||||||||||||||||||||
| 18 | COLD STORAGE & ACCESSORIES | |||||||||||||||||||||
| 19 | SHOP DRAWING OF HVAC SYSTEMS | |||||||||||||||||||||
| 20 | TESTING ADJUSTING & BALANCING | |||||||||||||||||||||
| 21 | VALVES ( GATE, BALL, CHECK, GLOBE ETC.) | |||||||||||||||||||||
| 22 | PPRC PIPING | |||||||||||||||||||||
| 23 | SPLIT SYSTEM HEAT PUMP UNIT | |||||||||||||||||||||
| 24 | SPLIT SYSTEM A/C UNIT | |||||||||||||||||||||
| 25 | FAN COIL UNIT | |||||||||||||||||||||
| 26 | EXPANSION TANK | |||||||||||||||||||||
| 27 | AUTOMATIC CONTROL SYSTEM | |||||||||||||||||||||
| 28 | VRV HVAC SYSTEM | |||||||||||||||||||||
| 29 | WATER SOFTENER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | BALANCE VALVE | |||||||||||||||||||||
| 31 | ||||||||||||||||||||||
| 32 | ||||||||||||||||||||||
| 33 | ||||||||||||||||||||||
| 34 | ||||||||||||||||||||||
| 35 | ||||||||||||||||||||||
| 36 | ||||||||||||||||||||||
| 37 | ||||||||||||||||||||||
| 38 | ||||||||||||||||||||||
| 39 | ||||||||||||||||||||||
| 40 | ||||||||||||||||||||||
| 41 | ||||||||||||||||||||||
| 42 | ||||||||||||||||||||||
| 43 | ||||||||||||||||||||||
| 44 |
PLUMBING
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| PLUMBING | ||||||||||||||||||||||
| 1 | PPRC PIPES & ACCESSORIES | |||||||||||||||||||||
| 2 | LAVATORY | |||||||||||||||||||||
| 3 | WATER CLOSET | |||||||||||||||||||||
| 4 | URINAL | |||||||||||||||||||||
| 5 | SHOWER TUBS | |||||||||||||||||||||
| 6 | BATH TUBS | |||||||||||||||||||||
| 7 | MIXING FAUCET | |||||||||||||||||||||
| 8 | SHOWER MIXING VALVE | |||||||||||||||||||||
| 9 | SHOWER HEADS | |||||||||||||||||||||
| 10 | TRAPS | |||||||||||||||||||||
| 11 | FLOOR DRAIN | |||||||||||||||||||||
| 12 | CLEAN OUT | |||||||||||||||||||||
| 13 | FLUSH VALVES | |||||||||||||||||||||
| 14 | BALL COCK UNITS | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | STRAINERS | |||||||||||||||||||||
| 16 | BACKFLOW PREVENTERS | |||||||||||||||||||||
| 17 | VACUUM BREAKERS | |||||||||||||||||||||
| 18 | IRRIGATION SYSTEM C/W ACCESSORIES | |||||||||||||||||||||
| 19 | SHOP DRAWING OF PLUMBING SYSTEMS | |||||||||||||||||||||
| 20 | TESTING ADJUSTING & BALANCING | |||||||||||||||||||||
| 21 | INSULATION | |||||||||||||||||||||
| 22 | VALVES ( GATE, BALL, CHECK, GLOBE ETC.) | |||||||||||||||||||||
| 23 | PUMPS | |||||||||||||||||||||
| 24 | HYDRONIC SPECIALTIES | |||||||||||||||||||||
| 25 | SUPPORTS & HANGERS | |||||||||||||||||||||
| 26 | AIR VENT | |||||||||||||||||||||
| 27 | WATER HAMMER ARRESTOR | |||||||||||||||||||||
| 28 | RP TYPEBACK FLOW PREVENTER | |||||||||||||||||||||
| 29 | DC TYPE BACK FLOW PREVENTER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | VACUUM BREAKER | |||||||||||||||||||||
| 31 | BALANCE VALVE | |||||||||||||||||||||
| 32 | ||||||||||||||||||||||
| 33 | ||||||||||||||||||||||
| 34 | ||||||||||||||||||||||
| 35 | ||||||||||||||||||||||
| 36 | ||||||||||||||||||||||
| 37 | ||||||||||||||||||||||
| 38 | ||||||||||||||||||||||
| 39 | ||||||||||||||||||||||
| 40 | ||||||||||||||||||||||
| 41 | ||||||||||||||||||||||
| 42 | ||||||||||||||||||||||
| 43 | ||||||||||||||||||||||
| 44 |
CIVIL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| CIVIL | ||||||||||||||||||||||
| 1 | SUBBASE COURSE | |||||||||||||||||||||
| 2 | AGGREGATE BASE COURSE | |||||||||||||||||||||
| 3 | JOINT SEAL | |||||||||||||||||||||
| 4 | BACKER ROD | |||||||||||||||||||||
| 5 | JOINT REMOVAL EQUIPMENT | |||||||||||||||||||||
| 6 | HIGH WATER PRESSURE EQUIPMENT | |||||||||||||||||||||
| 7 | AIR COMPRESSOR EQUIPMENT | |||||||||||||||||||||
| 8 | DOUBLE BLADE CONCRETE SAW CUTTING MACHINE | |||||||||||||||||||||
| 9 | BACKER ROD INSTALLATION EQUIPMENT | |||||||||||||||||||||
| 10 | VACUUM EQUIPMENT | |||||||||||||||||||||
| 11 | COMPACTION TEST FOR BASE COURSE | |||||||||||||||||||||
| 12 | GALVANIZED STEEL POST FOR FENCE | |||||||||||||||||||||
| 13 | GALVANIZED STEEL FENCE | |||||||||||||||||||||
| 14 | GALVANIZED STEEL BRACKET | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | GALVANIZED BARBED WIRE | |||||||||||||||||||||
| 16 | STEEL OUTRIGGER | |||||||||||||||||||||
| 17 | SHOP DRAWING FOR CHAIN LINK FENCE AND FENCE GATES C/W ALL ACCESSORIES AND SECURITY BEAM | |||||||||||||||||||||
| 18 | SHOP DRAWING FOR DITCH CROSSING | |||||||||||||||||||||
| 19 | SHOP DRAWING FOR JOINT PLAN FOR CONCRETE AREAS | |||||||||||||||||||||
| 20 | ASPHALT CEMENT | |||||||||||||||||||||
| 21 | PLAYGROUND EQUIPMENT AND FALL ZONE | |||||||||||||||||||||
| 22 | SHOP DRAWING FOR PLAYGROUND EQUIPMENT AND FALL ZONE INSTALLATION | |||||||||||||||||||||
| 23 | SHOP DRAWINGS FOR NEW ASPHALT ROAD SHOWING THE ELEVATIONS | |||||||||||||||||||||
| 24 | ASPHALT MIX DESIGN | |||||||||||||||||||||
| 25 | SHOP DRAWINGS FOR NEW DUCT BANKS | |||||||||||||||||||||
| 26 | SHOP DRAWINGS FOR NEW HEADWALLS | |||||||||||||||||||||
| 27 | YELLOW AND WHITE PAINT | |||||||||||||||||||||
| 28 | SELECT FILL COMPACTION TEST | |||||||||||||||||||||
| 29 | PLANT MIX | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | SHOP DRAWING FOR STORM DRAIN PROFILES C/W RIM AND INVERT ELEVATIONS | |||||||||||||||||||||
| 31 | SELECT FILL MATERIAL | |||||||||||||||||||||
| 32 | SEED | |||||||||||||||||||||
| 33 | AIR CLEARANCE SAMPLING FOR ASBESTOS | |||||||||||||||||||||
| 34 | ASBESTOS ABATEMENT CERTIFICATION | |||||||||||||||||||||
| 35 | CRANE TYPE AND PROPERTIES | |||||||||||||||||||||
| 36 | GLASS BEADS | |||||||||||||||||||||
| 37 | SHOP DRAWING FOR DRAINAGE CHANNEL | |||||||||||||||||||||
| 38 | TOPSOIL | |||||||||||||||||||||
| 39 | FERTILIZER | |||||||||||||||||||||
| 40 | SHOP DRAWING FOR INSTALLATION OF THE BULLET TRAP | |||||||||||||||||||||
| 41 | WATER STOP FOR WALL EXPANSION JOINT | |||||||||||||||||||||
| 42 | CAST IRON FRAME AND COVER FOR DRAINAGE SYSTEM | |||||||||||||||||||||
| 43 | STORM DRAINAGE PIPE C/W WATERTIGHT JOINT (RCP,PCP,PVC) | |||||||||||||||||||||
| 44 | PRIMER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 45 | TACK COAT | |||||||||||||||||||||
| 46 | SEAL COAT | |||||||||||||||||||||
| 47 | ASPHALT BINDER COURSE | |||||||||||||||||||||
| 48 | ASPHALT WEARING COURSE | |||||||||||||||||||||
| 49 | WATER BASED TRAFFIC PAINT |
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
STRUCTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | FORMWORK | |||||||||||||||||||||
| 2 | REINFORCING STEEL | |||||||||||||||||||||
| 3 | READY MIXED CONCRETE | |||||||||||||||||||||
| 4 | CONCRETE CURING MATERIALS | |||||||||||||||||||||
| 5 | CONCRETE MASONRY UNITS | |||||||||||||||||||||
| 6 | METAL ITEMS | |||||||||||||||||||||
| 7 | WOOD OR STEEL FORM MATERIAL | |||||||||||||||||||||
| 8 | PLYWOOD | |||||||||||||||||||||
| 9 | WELDED STEEL WIRE FABRIC | |||||||||||||||||||||
| 10 | DOWELS | |||||||||||||||||||||
| 11 | FORM TIES | |||||||||||||||||||||
| 12 | FORM RELESE AGENT | |||||||||||||||||||||
| 13 | CORNERS | |||||||||||||||||||||
| 14 | NAILS, SPIKES, LAG BOLTS, THROUGH BOLTS, ANCHORAGE | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | TIE WIRE | |||||||||||||||||||||
| 16 | CHAIRS, BOLSTERS, BAR SUPPORTS, SPACERS | |||||||||||||||||||||
| 17 | BONDING AGENT | |||||||||||||||||||||
| 18 | NON-SHRINK GROUT | |||||||||||||||||||||
| 19 | CONSTRUCTION JOINT DEVICES | |||||||||||||||||||||
| 20 | EXPANSION DEVICES | |||||||||||||||||||||
| 21 | EXPANSION DEVICES | |||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 | ||||||||||||||||||||||
| 26 | ||||||||||||||||||||||
| 27 | ||||||||||||||||||||||
| 28 | ||||||||||||||||||||||
| 29 |
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
ELECTRICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 1 | ALL KINDS OF ELECTRICAL METALLIC TUBING | |||||||||||||||||||||
| 2 | ALL KINDS OF FLEXIBLE METAL CONDUIT | |||||||||||||||||||||
| 3 | ALL KINDS OF RIGID STEEL CONDUIT | |||||||||||||||||||||
| 4 | ALL KINDS OF CABLE TRAY | |||||||||||||||||||||
| 5 | ALL KINDS OF BUILDING WIRE AND CABLE | |||||||||||||||||||||
| 6 | ALL KINDS OF OUTLET BOXES | |||||||||||||||||||||
| 7 | ALL KINDS OF PULL AND JUNCTION BOXES | |||||||||||||||||||||
| 8 | ALL KINDS OF WALL SWITCHES | |||||||||||||||||||||
| 9 | ALL KINDS OF RECEPTACLES | |||||||||||||||||||||
| 10 | GROUNDING ELECTRODE | |||||||||||||||||||||
| 11 | EXOTHERMIC CONNECTIONS | |||||||||||||||||||||
| 12 | ALL KINDS OF GROUNDING WIRE | |||||||||||||||||||||
| 13 | BRANCH CIRCUIT PANELBOARDS | |||||||||||||||||||||
| 14 | SHOP DRAWINGS FOR BRANCH CIRCUIT PANELBOARDS | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | ALL KINDS OF LIGHTING FIXTURES | |||||||||||||||||||||
| 16 | SHOP DRAWINGS FOR LIGHTING FIXTURES INSTALLATION | |||||||||||||||||||||
| 17 | SHOP DRAWINGS FOR EMERGENCY LIGHTING UNITS INSTALLATION LOCATION AND ILLUMINATION CALCULATION | |||||||||||||||||||||
| 18 | ALL KINDS OF FLUORESCENT BALLASTS | |||||||||||||||||||||
| 19 | ALL KINDS OF FLUORESCENT LAMP EMERGENCY POWER SUPPLY | |||||||||||||||||||||
| 20 | ADDRESSABLE HEAT DETECTOR | |||||||||||||||||||||
| 21 | SHOP DRAWINGS HEAT DETECTOR INSTALLATION | |||||||||||||||||||||
| 22 | ADDRESSABLE FIRE ALARM STATION | |||||||||||||||||||||
| 23 | FIRE ALARM HORN- STROBE INTERNAL & EXTERNAL | |||||||||||||||||||||
| 24 | FIRE ALARM STROBE LIGHT | |||||||||||||||||||||
| 25 | ADDRESSABLE FIRE ALARM CONTROL PANEL | |||||||||||||||||||||
| 26 | FIRE ALARM SYSTEM GRAPHIC ANNUNCIATOR PANEL | |||||||||||||||||||||
| 27 | TELEPHONE CABLE | |||||||||||||||||||||
| 28 | TELEPHONE- DATA RECEPTACLE | |||||||||||||||||||||
| 29 | COMMUNICATION PROTECTED BUILDING ENTRANCE TERMINAL BOX | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 30 | TV OUTLET | |||||||||||||||||||||
| 31 | CAT 5E OR CAT6 UTP CABLE | |||||||||||||||||||||
| 32 | SAFETY DISCONNECT SWITCH | |||||||||||||||||||||
| 33 | DIESEL GENERATOR | |||||||||||||||||||||
| 34 | AUTOMATIC TRANSFER SWITCH | |||||||||||||||||||||
| 35 | MANUAL TRANSFER SWITCH | |||||||||||||||||||||
| 36 | MOLDED CASE CIRCUIT BREAKERS. | |||||||||||||||||||||
| 37 | MINIATURE CIRCUIT BREAKERS | |||||||||||||||||||||
| 38 | EXIT LIGHTS | |||||||||||||||||||||
| 39 | FIRE ALARM SYSTEM BUILDING TRANCEIVER C/W ACCESSORIES | |||||||||||||||||||||
| 40 | COMMUNICATION PROTECTED BUILDING ENTRANCE TERMINAL BOX | |||||||||||||||||||||
| 41 | ULTRA SENSITIVE SMOKE DETECTORS SYSTEM C/W PANEL, PIPE AND SMOKE INLET | |||||||||||||||||||||
| 42 | ULTRA SENSITIVE SMOKE DETECTORS SYSTEMSHOP DRAWING | |||||||||||||||||||||
| 43 | LPS AIR TERMINAL | |||||||||||||||||||||
| 44 | DDC PANEL MATERIALS | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 45 | DDC PANEL SHOP DRAWING | |||||||||||||||||||||
| 46 | METAL LIGHTING POLE | |||||||||||||||||||||
| 47 | METAL LIGHTING POLE FOUNDATION AND INSTALLATION SHOP DRAWING | |||||||||||||||||||||
| 48 | EXTERIOR LIGHTING CONTROL PANEL C/W ALL DEVICES, | |||||||||||||||||||||
| 49 | DETECTABLE WARNING TAPE FOR UNDERGROUND UTILITY | |||||||||||||||||||||
| 50 | CABLE TAG | |||||||||||||||||||||
| 51 | BATTERY CHARGER FOR THE GENERATOR | |||||||||||||||||||||
| 52 | POLE NUMBER PLATE | |||||||||||||||||||||
| 53 | SURGE PROTECTOR DEVICE | |||||||||||||||||||||
| 54 | HI-POT TEST AND REPORT | |||||||||||||||||||||
| 55 | RING MAIN UNIT C/W ACCESSORIES | |||||||||||||||||||||
| 56 | STEP DOWN DRY TYPE TRANSFORMER | |||||||||||||||||||||
| 57 | NON METALLIC CABLE RACK | |||||||||||||||||||||
| 58 | HEAT RESISTANCE FIRE ALARM CABLE | |||||||||||||||||||||
| 59 | ADDRESSABLE FIRE ALARM SMOKE DETECTOR | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 09-1032 | RPR INSTALL TACTICAL BAFFLES, CATM | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 60 | ADDRESSABLE FIRE ALARM DUCT TYPE SMOKE DETECTOR. | |||||||||||||||||||||
| 61 | RG6 COAX CABLE | |||||||||||||||||||||
| 62 | 19" PACH PANEL RACK | |||||||||||||||||||||
| 63 | HV AND LV CABLE SPLICE KIT | |||||||||||||||||||||
| 64 | HV CABLE POTHEAD FOR RINGMAIN UNITS |