RFP_Atch_7_-_PPQ.doc

DOC document 114 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA5613-19-R-0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document outlines the requirements for a Multiple Award Construction Contract solicitation. The 700th Contracting Squadron is seeking proposals for the Multiple Award Construction Contract program to provide design-build, maintenance, alteration, repair, renovation, and minor construction projects for installations in the Kaiserslautern Military Community and at Ramstein and Spangdahlem Air Bases in Germany. The Air Force intends to award up to five indefinite-delivery, indefinite-quantity contracts valued at an estimated $425 million over five years. Task orders will range from $1,000 to $5 million and include a design-build seed project between $1 million and $5 million at Ramstein Air Base. The solicitation is expected to be released on November 1st with proposals due by December 1st. A pre-proposal conference will be held approximately one week after solicitation release. All contractors must be registered in the System for Award Management to receive an award.

RFP Atch 7 - Past Performance Questionnaire (PPQ)

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
(Rev_4)_SOW_for_Seed_Proj_(Amend_0004).pdf PDF
(Amend_0004)_Section_L.pdf PDF
(Amendment_0004)_Section_M.pdf PDF
Consolidated_Q&A__7.pdf PDF
(Rev_4)_SOW_for_Seed_Proj_(Amend_0004).pdf PDF
Consolidated_Q&A__6.pdf PDF
Consolidated_Q&A__5.pdf PDF
Consolidated_Q&A__4.pdf PDF
Consolidated_Q&A__3.pdf PDF
RFP_Atch_3_-_(Rev_2)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
RFP_Atch_3g_-_(Rev_1)_Shelf_Layouts_and_Dimensions.pdf PDF
FA5613-19-R-0003-0002.pdf PDF
RFP_Atch_3j_-_Hydrant_Flow_Test.xls XLS spreadsheet
RFP_Atch_3g_-_Shelf_Layouts_&_Dimensions.pdf PDF
RFP_Atch_5e_-_Premise_Wiring_Standard.pdf PDF
RFP_Atch_3_-_(Rev_1)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
Atch_3_-_Pre-Prop_Conf_&_Site_Visit_Briefing.pdf PDF
Atch_1_-_Conf_&_Site_Visit_Attendance_Record.pdf PDF
Atch_2_-__Consolidated_Q&A_2_(Conf_&_Site_Visit).pdf PDF
Pre-Proposal_Conference_Minutes.pdf PDF
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.dwg DWG drawing
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.pdf PDF
RFP_Atch_8_-_SubK_Consent_Ltr.doc DOC document
RFP_Atch_3_-_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
RFP_Atch_3f03_-_B02_-_Inventory_topview.dwg DWG drawing
RFP_Atch_3f05_-_B04_-_Inventory_elevations.pdf PDF
RFP_Atch_5a_-_Standardized_Technical_Proposal_(STP).pdf PDF
Invitation_for_Pre-Proposal_&_Conf_Site_Visit.pdf PDF
RFP_Atch_3e_-_Bldg_2167_Work_and_Safety_Plan.docx DOCX document
RFP_Atch_3f06_-_A01_-_New_planning_floor_plan.dwg DWG drawing
RFP_Atch_1_-_General_Requirements_&_Provisions.pdf PDF
RFP_FA5613-19-R-0003_(MACC).pdf PDF
RFP_Atch_2_-_Special_Contract_Requirements.pdf PDF
RFP_Atch_3f04_-_B03_-_Inventory_sectional_views.pdf PDF
RFP_Atch_5b_-_LD_Determination.pdf PDF
Cover_Ltr_-_RFP_Release.pdf PDF
RFP_Atch_3d_-_Bldg_2167_Sample_Taking_Plan.pdf PDF
RFP_Atch_3f04_-_B03_-_Inventory_sectional_views.dwg DWG drawing
RFP_Atch_4_-_Seed_Proj_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
RFP_Atch_9_-_Client_Authorization_Ltr.docx DOCX document
RFP_Atch_3f03_-_B02_-_Inventory_topview.pdf PDF
RFP_Atch_6_-_PPI.doc DOC document
RFP_Atch_3c_-_Bldg_2167_Room_Book.xls XLS spreadsheet
RFP_Atch_3f02_-_B01_-_Inventory_floor_plan.pdf PDF
RFP_Atch_5c_-_Material_Submittal_Form_66_TYFR_18-1047.pdf PDF
RFP_Atch_3f02_-_B01_-_Inventory_floor_plan.dwg DWG drawing
Invitation_Atch_1_-_PreRegistration_Form.docx DOCX document
RFP_Atch_3b_-_Bldg_2167_Disposal_Concept.xlsx XLSX spreadsheet
RFP_Atch_5d_-_Env_Impact_Study_AF813_TYFR_18-1047.pdf PDF
RFP_Atch_3f05_-_B04_-_Inventory_elevations.dwg DWG drawing
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information -- See FAR 2.101 and 3.104

FA5613-19-R-0003

Attachment 7

PAST/PRESENT PERFORMANCE QUESTIONNAIRE (PPQ)

***Please DO NOT send the completed PPQ back to the contractor. Please e-mail directly to the following individuals no later than 4 December 2018:

Ms. Anja Schady

AND

Ms. Elizabeth Preston anja.schady.de@us.af.mil elizabeth.preston@us.af.mil

700 CONS/PKC

700 CONS/PKC

Bldg. 2767 Kapaun Air Station

Bldg. 2767 Kapaun Air Station

67661, Kaiserslautern Germany

67661, Kaiserslautern Germany

Tel: 0049-631-536-0135

Tel: 0049-631-536-7999

DSN: (314) 489-0135

DSN: (314) 489-7999

1. This Acquisition is for the Multiple Award Construction Contract (MACC) program consisting of a broad range of design-build, maintenance, alteration, repair, renovation, and minor construction projects affecting real property throughout the Kaiserslautern Military Community (KMC) and Spangdahlem Air Base (AB).

2. As part of the source selection process, this questionnaire is provided to assist the 700th Contracting Squadron (700 CONS) in the performance evaluation of offerors pertaining to the competitive acquisition for the MACC that will result in the award of a federal contract. Therefore, it is important that your information be as factual, accurate and as complete as possible to preclude the need for follow-up queries by the evaluators. Please complete the attached questionnaire using the following guidance:

E
VG
S
M
U
N
Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
N/A

Performance meets contractual requirements and exceeds many to your organization’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Performance meets contractual requirements and exceeds some to your organization’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Performance was not observed or not applicable to the current effort being reported against.

SECTION 1: CONTRACT AND PROGRAM IDENTIFICATION

a. Contractor: _____________________________________

b. Contractor’s CAGE Code: ________________________________

c. Contract / Task Order (TO) Number: _______________________________

d. Contract Type (e.g. FFP, Cost, T&M): ___________________________

e. Was this a competitive contract?

Yes_____ No______

f. Period of Performance: _____________________________

g. Performed as:

Prime Contractor _____

Sub-Contractor ______

h. Initial (at the time of award) Contract Value (if it was a Task Order, indicate the TO value: $_______________

i. Current or Final Contract/TO Value (include all modifications): $_____________________

j. Project Title and Brief Description of Work: _______________________________________________________

k. Are there Contractor Performance Assessment Reports (CPARS) or other Past Performance Reports available for this contract or task order?

Yes ____ No _____

SECTION 2: RATER INFORMATION:

Primary

Alternate Name of Rater:

Name of Rater:

Title:

Title:

Agency:

Agency:

Office Symbol:

Office Symbol:

Telephone Number:

Telephone Number:

Email Address:

Email Address:

Note: Once the PPQ is complete, it is considered to be Source Selection Information.

SECTION 3: PROGRAM RELEVANCY

A. To help determine program relevancy, please indicate below the work the contractor has or is performing under this contract by marking the applicable box with X or √ or N/A.

A-E Design work

Civil (pavements, site utilities) work

Structural work (including roofing)

Electrical and/or Communications work

Mechanical (plumbing, HVAC) work

Fire Protection work

Security (secure rooms for classified work) and/or Force Protection work

New Construction (including building additions)

Interior renovation (including flooring)

Interior/Exterior painting

B. Was this an Indefinite-Delivery Indefinite-Quantity (IDIQ) type contract with multiple task orders?

Yes

No

C. Was it a design-build contract/task order?

Yes

No

D. Geographic description of work under this contract, i.e. local, nationwide, worldwide, or other commands:

SECTION 4: PAST PERFORMANCE EVALUATION

Please mark the appropriate column with “X” or “√” using the definitions matrix set forth in the instructions, and provide a narrative explanation for ratings of E, VG, M or U.

A.
Project Management:
E
VG
S
M
U
N
A1.
Provides a good project management structure, to include a single point of contact with responsibility for all contract requirements.
A2.
Communicates effectively with Government team and with on-site supervisors to ensure accurate/timely information flow.
A3.
Requires minimal Government direction regarding contract and technical requirements already available to them (i.e. they read/understand the contract in its entirety).
A4.
Hires, trains, and applies a qualified workforce to this effort.
B.
Technical Performance:
E
VG
S
M
U
N
B1.
Complies with technical requirements and contract objectives.
B2.
Adheres to contract performance schedule.
B3.
Provides complete and timely submission of design submittals and all supporting documents.
B4.
Provides complete and timely submission of construction submittals and other required documents.
B5.
Provided post-construction documents (manuals, warranties, as-built drawings, etc.) in a timely manner.
B6.
Contractor was responsive to warranty calls and quickly fixed legitimate problems.
C.
Safety/Labor Compliance:
E
VG
S
M
U
N
C1.
Provides a Safety Program compliant with OSHA and contract requirements.
C2.
Demonstrates safety awareness and performance.
C3.
Complies with labor laws/standards.
D.
Customer Satisfaction:
E
VG
S
M
U
N
D1.
Overall commitment to customer satisfaction.
D2.
Contractor is reasonable and cooperative in dealing with customer.
D3.
Responds to customer questions concerning technical/service/administrative issues.
D4.
Demonstrates professionalism and courtesy in dealing with customers.
E.
Change and Cost Control Management:
E
VG
S
M
U
N
E1.
Contractor did not try to “nickel and dime” the customer with numerous change order requests.
E2.
Flexibility and efforts made to accommodate the customer within the terms of the contract.
E3.
Timeliness/effectiveness of contract problem resolution.
E4.
Meets and performs within originally awarded contract costs.
E5.
Alerts Government of potential unforseen costs/changes before they occur.
E6.
Submits reasonable supportable costs for change requests.
E7.
Submits timely, accurate, and complete invoices.
F.
Quality Control Program:
E
VG
S
M
U
N
F1.
Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements.
F2.
Adequacy of design quality control process.
F3.
Adequacy of contruction quality control process.
F4.
Performs quality work with minimal rework needed.
F5.
Monitors and controls performance of subcontractors.
F6.
Ensures poor performance by subcontractors or in-house personnel is not repeated.
G.
Overall Contract:
E
VG
S
M
U
N
G1.
How would you rate the contractor’s overall performance for this contract?
G2.
Was the contractor ever issued a cure or show cause notice under the referenced contract?

If yes, explain outcome in “remarks.”

YES
NO
G3.
For US Government contracts only: Is the contractor rated in CPARS?
YES
NO
G4.
Would you award another contract to this contractor?

If not, explain in “remarks.”

YES
NO

Remarks: ____________________________________________________________________________________

RETURN COMPLETED QUESTIONNAIRES DIRECTLY TO

THE CONTRACTING OFFICER (see POCs at paragraph 2)

**DO NOT RETURN TO THE CONTRACTOR**

THANK YOU FOR YOUR PROMPT RESPONSE AND ASSISTANCE!

CONTRACTOR’S NAME:

CONTRACT NUMBER:

For Official Use Only

Source Selection Information -- See FAR 2.101 and 3.104

File details come from the government source that posted it. Updated .