FA5613-19-R-0003-0002.pdf
PDF 101 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA5613-19-R-0003
About this file
This document summarizes an amendment to a solicitation for a seed project and multiple award construction contract. The amendment extends the proposal submission deadline from December 4, 2018 to December 12, 2018 at noon. It also revises and adds attachments related to the seed project statement of work, building plans, and utility information. The seed project involves renovating Building 2167 at Ramstein Air Base in Germany to house aircraft parts and support eight staff. The multiple award construction contract has an estimated total value of $425 million over five years and will award up to five contracts for construction, maintenance, and repair projects ranging from $1,000 to $5 million at Ramstein and Spangdahlem Air Bases.
Amendment 0002
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to 1) extend the proposal submission due date from 4 Dec 2018, 1600 hrs (CET) to 14 Dec 2018, 1200 hrs (CET); and 2) revise and add the RFP attachments.
See Summary of Changes on continuation page for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Nov-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA561319R0003
X 9B. DATED (SEE ITEM 11)
01-Nov-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Nov-2018
CODE
700TH CONTRACTING SQ
KAPAUN AIR STATION
BLDG 2767
D-67661 KAISERSLAUTERN
GERMANY
FA5613 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA561319R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of Amendment 0002 is as follows:
1. To extend the proposal submission due date from 4 Dec 18, 1600 hrs (CET) to 14 Dec 18, 1200 hrs
2. To revise and add attachments to Section J – List of Attachments, as follows:
a. Revised Sub-attachment 3g, Seed Project, Bldg 2167 (Rev 1) Shelf Layouts & Dimensions
b. Add Sub-attachment 3h, Utility Lines
c. Add Sub-attachment 3i, Noise Contour Map of Ramstein AB
d. Add Sub-attachment 3j, Hydrant Flow Test
3. To revise Attachment 3, Seed Project SOW, the second paragraph under Title II – Description of Works:
From: The contractor shall renovate the Bldg. 2167 to house the Aircraft Parts Store and to be occupied by a staff of eight (8) at all hours of the day and all days of the year. The user will install a shelf system after the renovation is completed. The shelf system is equipped with integrated lighting and a sprinkler system.
To enable the shelf system, the contractor shall provide and install the connections as a part of this project.
The stored parts also include aircraft tires but no flammable liquids.
To: The contractor shall renovate the Bldg. 2167 to house the Aircraft Parts Store and to be occupied by a staff of eight (8) at all hours of the day and all days of the year. The user will install a shelf system after the renovation is completed. The stored parts also include aircraft tires but no flammable liquids.
4. All other terms and conditions of this solicitation remain unchanged.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 04-Dec-2018 04:00 PM to 14-Dec-2018 12:00 PM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
DOCUMENT DESCRIPTION PAGES DATE
Attachment 1 General Requirements & Provisions 25 2 Oct 2018
Attachment 2 Special Contract Requirements 7 N/A
***Attachments 3 – 5 are the seed project task order documents which the Government intends to award to one offeror as a result of this source section. These documents will be incorporated into the awardee’s task order award.
Attachment 3 (Rev 2) Seed Project No. TYFR18-1047, Statement of Work (SOW) 9 15 Nov 2018
Attachment 3a Seed Project, Bldg 2167 Contaminant Investigation Report 48 1 Dec 2016 Attachment 3b Seed Project, Bldg 2167 Disposable Concept 2 1 Dec 2016 Attachment 3c Seed Project, Bldg 2167 Room Book 1 1 Dec 2016 Attachment 3d Seed Project, Bldg 2167 Sample Taking Plan 1 1 Dec 2016 Attachment 3e Seed Project, Bldg 2167 Work and Safety Plan 22 2 Dec 2016 Attachment 3f01 (PDF & DWG), Cover, Table of Contents, Location Plan 1 2 Dec 2016 Attachment 3f02 (PDF & DWG), Inventory Floor Plan 1 2 Dec 2016 Attachment 3f03 (PDF & DWG), Inventory Top View 1 2 Dec 2016
FA561319R0003
Attachment 3f04 (PDF & DWG), Inventory Sectional Views 1 2 Dec 2016 Attachment 3f05 (PDF & DWG), Elevations 1 2 Dec 2016 Attachment 3f06 (PDF & DWG), New Planning, Floor Plan 1 2 Dec 2016 Attachment 3g Seed Project, Bldg 2167 (Rev 1) Shelf Layouts & Dimensions 1 2 Dec 2016 Attachment 3h Utility Lines 3 N/A Attachment 3i Noise Contour Map of Ramstein AB 1 N/A Attachment 3j Hydrant Flow Test 1 N/A Attachment 4 Seed Project Bid Schedule (Price Worksheet) N/A N/A
Attachment 5a Standardized Technical Proposal (STP), TYFR 18-1047 4 2 Oct 2018
Attachment 5b Liquidated Damages (LD) Determination, TYFR 18-1047 1 N/A
Attachment 5c Material Submittal Form 66, TYFR 18-1047 2 2 Dec 2016
Attachment 5d Environmental Impact Analysis, TYFR 18-1047 3 13 Jul 2016
Attachment 5e Premise Wiring Standard 1 N/A
****Attachments 6 – 10 are to be used for the source selection only and will not be incorporated in the contract award document.
Attachment 6 Past Performance Information (PPI) 2 N/A
Attachment 7 Past Performance Questionnaire (PPQ) 5 N/A
Attachment 8 Subcontractor/Teaming Partner Consent Form 1 N/A
Attachment 9 Client Authorization Letter 1 N/A
Attachment 10 Questions & Answer Form 1 N/A
(End of Summary of Changes)