This document provides details for a Multiple Award Construction Contract solicitation. The 700th Contracting Squadron, Kapaun Air Station, Germany is soliciting proposals for up to five indefinite-delivery, indefinite-quantity construction contracts for the Kaiserslautern Military Community and Ramstein and Spangdahlem Air Bases in Germany. The estimated total value of task orders awarded under the contracts is $425 million over five years. Task orders will range from $1,000 to $5 million for design-build, sustainment, maintenance, alteration, repair, renovation, and minor construction projects. A seed project between $1 million and $5 million is included at Ramstein Air Base. The solicitation is expected to be released on November 1, 2018 with proposals due by December 1, 2018. The period of performance for the contracts is one five-year ordering period beginning October 1, 2019 through September 30, 2024.

RFP Atch 5b - Liquidated Damages (LD) Determination for Seed Project

View the file

Other files

File Type Posted
FA5613-19-R-0003-0004.pdf PDF
(Rev_4)_SOW_for_Seed_Proj_(Amend_0004).pdf PDF
(Amend_0004)_Section_L.pdf PDF
(Amendment_0004)_Section_M.pdf PDF
(Rev_4)_SOW_for_Seed_Proj_(Amend_0004).pdf PDF
Consolidated_Q&A__7.pdf PDF
Consolidated_Q&A__6.pdf PDF
Consolidated_Q&A__5.pdf PDF
FA5613-19-R-0003-0003.pdf PDF
Atch_3k_-_Drinking_Water_Analysis.pdf PDF
RFP_Atch_3_-_(Rev_3_)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
Consolidated_Q&A__4.pdf PDF
RFP_Atch_3h_-_Utility_Lines.pdf PDF
FA5613-19-R-0003-0002.pdf PDF
RFP_Atch_3g_-_(Rev_1)_Shelf_Layouts_and_Dimensions.pdf PDF
RFP_Atch_3_-_(Rev_2)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
Consolidated_Q&A__3.pdf PDF
RFP_Atch_3i_-_Noise_Contour_Map_RAB.pdf PDF
RFP_Atch_3j_-_Hydrant_Flow_Test.xls XLS spreadsheet
FA5613-19-R-0003-0001.pdf PDF
RFP_Atch_3g_-_Shelf_Layouts_&_Dimensions.pdf PDF
RFP_Atch_5e_-_Premise_Wiring_Standard.pdf PDF
RFP_Atch_3_-_(Rev_1)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
Atch_3_-_Pre-Prop_Conf_&_Site_Visit_Briefing.pdf PDF
Atch_2_-__Consolidated_Q&A_2_(Conf_&_Site_Visit).pdf PDF
Atch_1_-_Conf_&_Site_Visit_Attendance_Record.pdf PDF
Pre-Proposal_Conference_Minutes.pdf PDF
RFP_Atch_1_-_General_Requirements_&_Provisions.pdf PDF
RFP_Atch_3f05_-_B04_-_Inventory_elevations.dwg DWG drawing
RFP_Atch_5d_-_Env_Impact_Study_AF813_TYFR_18-1047.pdf PDF
RFP_Atch_4_-_Seed_Proj_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
RFP_Atch_3f06_-_A01_-_New_planning_floor_plan.dwg DWG drawing
RFP_Atch_3d_-_Bldg_2167_Sample_Taking_Plan.pdf PDF
Cover_Ltr_-_RFP_Release.pdf PDF
RFP_Atch_10_-_Questions_&_Answers_Form.docx DOCX document
RFP_Atch_3a_-_Bldg_2167_Contaminant_Investigation_Report.docx DOCX document
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.dwg DWG drawing
Invitation_for_Pre-Proposal_&_Conf_Site_Visit.pdf PDF
RFP_Atch_2_-_Special_Contract_Requirements.pdf PDF
RFP_FA5613-19-R-0003_(MACC).pdf PDF
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.pdf PDF
RFP_Atch_3f03_-_B02_-_Inventory_topview.dwg DWG drawing
RFP_Atch_8_-_SubK_Consent_Ltr.doc DOC document
RFP_Atch_3_-_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
RFP_Atch_3f06_-_A01_-_New_planning,_floor_plan.pdf PDF
RFP_Atch_5a_-_Standardized_Technical_Proposal_(STP).pdf PDF
RFP_Atch_3f05_-_B04_-_Inventory_elevations.pdf PDF
RFP_Atch_3e_-_Bldg_2167_Work_and_Safety_Plan.docx DOCX document
RFP_Atch_3f04_-_B03_-_Inventory_sectional_views.pdf PDF
RFP_Atch_3f04_-_B03_-_Inventory_sectional_views.dwg DWG drawing
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIQUIDATED DAMAGES DETERMINATION

SUBJECT: Project No: TYFR 18-1047

Title: EIC-Convert to KC-135 Parts Storage

1. In accordance with FAR 36.206 and DOD FAR Sup 236.206, liquidated damages (LDs) will be assessed for each calendar day of delay required to complete work on subject contract.

As a minimum, LDs in the amount of EURO 323.48 for the first day and EURO 250.92 for each day thereafter will be charged, based upon the following:

a. The contractor has complete control of the pace of work.he place of work

b. The contract provides for liquidated damages for delay of work for each calendar day of the contract.

c. Considering the requirement, the rate of assessment is reasonable.

Elizabeth Preston

Contracting Officer

Date:

LEGAL

Staff Judge Advocate 1.0 hours @ 72.57 = 72.57 EURO

(first day only)

CIVIL ENGINEERING

Inspection 2.0 hours @ 27.76 = 55.52 EURO

Supervision/Admin 1.0 hours @ 34.63 = 34.63 EURO

Total Engineering Cost/Day 90.15 EURO

CONTRACTING

Contracting Officer 1.0 hours @ 56.82 = 56.82 EURO

Administrator 2.0 hours @ 43.20 = 86.39 EURO

Vehicle Costs 17.56 EURO

(See attached chart)

Total Contracting Cost/Day 160.77 EURO

ADDITIONAL DAMAGES

Loss of Quarters EURO per day

Loss of Use of Runways/Taxiways EURO per day

Loss of Use of Building EURO per day

Other EURO per day

Total Other Costs/Day 0.00 EURO