This document provides details regarding a Multiple Award Construction Contract solicitation for the Kaiserslautern Military Community in Germany. The Air Force intends to award up to five contracts valued at an estimated total of $425 million over five years for design-build, sustainment, maintenance, alteration, repair, renovation, and minor construction projects. Task orders will range from $1,000 to $5 million. A pre-proposal conference will be held approximately one week after solicitation release on November 1, 2018. Proposals are due by December 1, 2018. All contractors must register in the System for Award Management to be eligible for award.

RFP Atch 3a - Bldg 2167 Contaminant Investigation Report

View the file

Other files

File Type Posted
FA5613-19-R-0003-0004.pdf PDF
(Rev_4)_SOW_for_Seed_Proj_(Amend_0004).pdf PDF
(Amend_0004)_Section_L.pdf PDF
(Amendment_0004)_Section_M.pdf PDF
(Rev_4)_SOW_for_Seed_Proj_(Amend_0004).pdf PDF
Consolidated_Q&A__7.pdf PDF
Consolidated_Q&A__6.pdf PDF
Consolidated_Q&A__5.pdf PDF
FA5613-19-R-0003-0003.pdf PDF
Atch_3k_-_Drinking_Water_Analysis.pdf PDF
RFP_Atch_3_-_(Rev_3_)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
Consolidated_Q&A__4.pdf PDF
RFP_Atch_3h_-_Utility_Lines.pdf PDF
FA5613-19-R-0003-0002.pdf PDF
RFP_Atch_3g_-_(Rev_1)_Shelf_Layouts_and_Dimensions.pdf PDF
RFP_Atch_3_-_(Rev_2)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
Consolidated_Q&A__3.pdf PDF
RFP_Atch_3i_-_Noise_Contour_Map_RAB.pdf PDF
RFP_Atch_3j_-_Hydrant_Flow_Test.xls XLS spreadsheet
FA5613-19-R-0003-0001.pdf PDF
RFP_Atch_3g_-_Shelf_Layouts_&_Dimensions.pdf PDF
RFP_Atch_5e_-_Premise_Wiring_Standard.pdf PDF
RFP_Atch_3_-_(Rev_1)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
Atch_3_-_Pre-Prop_Conf_&_Site_Visit_Briefing.pdf PDF
Atch_2_-__Consolidated_Q&A_2_(Conf_&_Site_Visit).pdf PDF
Atch_1_-_Conf_&_Site_Visit_Attendance_Record.pdf PDF
Pre-Proposal_Conference_Minutes.pdf PDF
RFP_Atch_1_-_General_Requirements_&_Provisions.pdf PDF
RFP_Atch_3f05_-_B04_-_Inventory_elevations.dwg DWG drawing
RFP_Atch_5d_-_Env_Impact_Study_AF813_TYFR_18-1047.pdf PDF
RFP_Atch_4_-_Seed_Proj_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
RFP_Atch_3f06_-_A01_-_New_planning_floor_plan.dwg DWG drawing
RFP_Atch_3d_-_Bldg_2167_Sample_Taking_Plan.pdf PDF
Cover_Ltr_-_RFP_Release.pdf PDF
RFP_Atch_10_-_Questions_&_Answers_Form.docx DOCX document
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.dwg DWG drawing
Invitation_for_Pre-Proposal_&_Conf_Site_Visit.pdf PDF
RFP_Atch_2_-_Special_Contract_Requirements.pdf PDF
RFP_FA5613-19-R-0003_(MACC).pdf PDF
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.pdf PDF
RFP_Atch_3f03_-_B02_-_Inventory_topview.dwg DWG drawing
RFP_Atch_8_-_SubK_Consent_Ltr.doc DOC document
RFP_Atch_3_-_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
RFP_Atch_3f06_-_A01_-_New_planning,_floor_plan.pdf PDF
RFP_Atch_5b_-_LD_Determination.pdf PDF
RFP_Atch_5a_-_Standardized_Technical_Proposal_(STP).pdf PDF
RFP_Atch_3f05_-_B04_-_Inventory_elevations.pdf PDF
RFP_Atch_3e_-_Bldg_2167_Work_and_Safety_Plan.docx DOCX document
RFP_Atch_3f04_-_B03_-_Inventory_sectional_views.pdf PDF
RFP_Atch_3f04_-_B03_-_Inventory_sectional_views.dwg DWG drawing
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVESTIGATION REPORT No.: 2167 RAB / IGR / 2016 / 12 / 02 Project: Convert Bldg. 2167, Ramstein Air Base

INVESTIGATION REPORT No.: 2167 RAB / IGR / 2016 / 12 / 02

Project: Convert Bldg. 2167, Ramstein Air Base

Project-specific Contaminant Investigation Report

By order of:
IGR AG

Luitpoldstr. 60 a

67806 Rockenhausen

Subject:
Project-specific Contaminant Investigation

Bldg. 2167

Ramstein Air Base

Date of sampling:

Dec. 01, 2016

TABLE OF CONTENTS Page

1. Purpose / Scope of Work / Subject 3

2. Project-specific Contaminant Investigation 4

2.1. Contaminant Investigation Bldg. 2167 RAB 4

2.1.1. Sampling of materials, suspected contamination and results 5 Material samples for asbestos Nos. 1-9

2.1.2. Sampling of materials, suspected contamination and results 14 Material samples for artificial mineral fibers (AMF) IAW WHO-Definition Nos. 1-6

2.1.3. Sampling of materials, suspected contamination and results 20 Material samples for heavy metals (HM) and polychlorinated biphenyls (PCB) Nos. 1-4

2.1.4. Sampling of materials, suspected contamination and results 24 Material samples for LAGA-classified construction debris and additional parameters IAW DepV No. 1

2.1.5. Visual inspection, Suspected Contamination and Results, 25 and inventory: Floor and wall structures, etc.

Visual samples Nos. 1-11

3. Summary of the results 36

4. Short summary of the samples with results (blue is contaminated) 42

5. Disclaimer 48

ATTACHMENTS: Laboratory reports (Laboratory Dr. Reimer), Sampling plan for the laboratory analyses

1. Purpose / Scope of Work / Subject:

By order of the IGR AG, Luitpoldstrasse 60, 67806 Rockenhausen, the Wicke Umwelttechnik GmbH, Weilerbach, has accomplished a project-specific contaminant investigation in building 2167 on Ramstein Air Base on December 01, 2016.

The intended conversion of the building requires preliminary dismounting and disposal of all contaminated elements in the building parts involved in the conversion measures.

The samples with suspected contamination that were taken on site have been analyzed in our partner laboratory, Labor Dr. Reimer, Saarbrücken.

As the samples were taken at selective spots, the laboratory results are only indicative and cannot be used for the purpose of waste declaration of mineral wastes.

Picture Nos. 1-4: Exterior view of building

2. Project-specific Contaminant Investigation

2.1. Contaminant Investigation

2.1.1. Sampling of materials, suspected contamination and results Material samples for asbestos Nos. Nr. 1-9

Asbestos sample No. 1:Fill of fire-rated door
Sampling location:Office 1 for workshop area 1

Suspected contamination: Asbestos

Result: No asbestos has been detected in the material.

Pictures Nos. 5+6:

2.1.1. Sampling of materials, suspected contamination and results

Asbestos sample No. 2:Gray paint und floor coating yellow/gray
Sampling location:Workshop area 2

Result: No asbestos has been detected in the material.

Pictures Nos. 7+8:

2.1.1. Sampling of materials, suspected contamination and results

Asbestos sample No. 3:PVC – floor tiles light brown / beige
Sampling location:Corridor to office No. 11

Suspected Contamination: Asbestos

Result: Chrysotile asbestos has been detected in the material.

Pictures Nos. 9+10:

2.1.1. Sampling of materials, suspected contamination and results

Asbestos sample No. 4:Adhesive under PVC – floor tiles light brown / beige
Sampling location:Corridor to office No. 11

Result: No asbestos has been detected in the material.

Pictures Nos. 11+12:

2.1.1. Sampling of materials, suspected contamination and results

Asbestos sample No. 5:PVC – floor tiles under laminate floor
Sampling Location:Office No. 10

Suspected Contamination: Asbestos

Result: Chrysotile asbestos has been detected in the material.

Pictures Nos. 13+14:

2.1.1. Sampling of materials, suspected contamination and results

Asbestos sample No. 6:PVC – floor tiles under laminate floor
Sampling Location:Storage No. 7

Result: Chrysotile asbestos has been detected in the material.

Pictures Nos. 15+16:

2.1.1. Sampling of materials, suspected contamination and results

Asbestos sample No.7:Fiber cement of window sill
Sampling Location:Storage No. 7

Result: Chrysotile asbestos has been detected in the material.

Pictures Nos. 17+18:

2.1.1. Sampling of materials, suspected contamination and results

Asbestos sample No. 8:Roof covering
Sampling Location:In the exterior – roof covering of annex

Result: Chrysotile asbestos has been detected in the material.

Pictures Nos. 19+20:

2.1.1. Sampling of materials, suspected contamination and results

Asbestos sample No. 9:Roof covering
Sampling Location:In the exterior – roof covering of hall roofs

Result: Chrysotile asbestos has been detected in the material.

Pictures Nos. 21+22:

2. Project-specific Contaminant Investigation

2.1.2. Sampling of materials, suspected contamination and results Material samples for respirable artificial mineral fibers AMF Nos. 1-6

AMF sample No. 1:Pipe insulation with plastic jacket
Sampling Location:Storage No. 4

Suspected Contamination: Respirable artificial mineral fibers (AMF)

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition)

Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2:With the mass percentages of the oxides of sodium (14.02 %), potassium (1.20%), magnesium (3.38%), calcium (6.04 %), aluminum (4.34%) and silicon (69.09%)
a carcinogenicity index of CI = 15.96 is determined.

(CI-value < 30 (K2): „Substances that should be considered as being carcinogenic to humans”)

Pictures Nos .23+24:

2.1.2. Sampling of materials, suspected contamination and results

AMF sample No. 2:Mineral fiber insulation of the light-weight walls
Sampling Location:Room 3 – Server / Comm room

Suspected Contamination: Respirable artificial mineral fibers (AMF)

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition)

Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2:With the mass percentages of the oxides of sodium (11.86 %), potassium (0.55%), magnesium (2.16%), calcium (9.10 %), aluminum (1.88%) and silicon (74.46%)
a carcinogenicity index of CI = 19.91 is determined.

(CI-value < 30 (K2): „Substances that should be considered as being carcinogenic to humans”)

Pictures Nos. 25+26:

2.1.2. Sampling of materials, suspected contamination and results

AMF sample No. 3:Mineral fiber lining panels of the ceilings
Sampling Location:Room 3 – Server / Comm room

Suspected Contamination: Respirable artificial mineral fibers (AMF)

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition)

Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2:With the mass percentages of the oxides of sodium (11.97%), potassium (0.87%), magnesium (3.15%), calcium (7.71%), aluminum (3.05%) and silicon (73.24%)
a carcinogenicity index of CI = 17.60 is determined.

(CI-value < 30 (K2): „Substances that should be considered as being carcinogenic to humans”)

Pictures Nos. 27+28:

2.1.2. Sampling of materials, suspected contamination and results

AMF sample No. 4:Pipe insulation at air heater
Sampling Location:Workshop area 2

Suspected Contamination: Respirable artificial mineral fibers (AMF)

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition)

Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2:With the mass percentages of the oxides of sodium (11.70 %), potassium (1.62%), magnesium (3.30%), calcium (6.47 %), aluminum (3.70%) and silicon (72.17%)
a carcinogenicity index of CI = 15.69 is determined.

(CI-value < 30 (K2): „Substances that should be considered as being carcinogenic to humans”)

Pictures Nos. 29+30:

2.1.2. Sampling of materials, suspected contamination and results

AMF sample No. 5:Mineral fiber ceiling panels of the suspended ceiling
Sampling Location:Office 6

Suspected Contamination: Respirable artificial mineral fibers (AMF)

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition)

Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2:With the mass percentages of the oxides of sodium (2.63 %), potassium (1.41%), magnesium (10.35%), calcium (10.01%), aluminum (13.78%) and silicon (48.17%)
a carcinogenicity index of CI = -3.16 is determined.

(CI-value < 30 (K2): „Substances that should be considered as being carcinogenic to humans”)

Pictures Nos. 31+32:

2.1.2. Sampling of materials, suspected contamination and results

AMF sample No. 6:Mineral fiber ceiling panels of the suspended ceiling
Sampling Location:Room 13a – Men’s restroom

Suspected Contamination: Respirable artificial mineral fibers (AMF)

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition)

Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2:With the mass percentages of the oxides of sodium (6.87 %), potassium (0.80%), magnesium (8.31%), calcium (18.61%), aluminum (2.90%) and silicon (59.92%)
a carcinogenicity index of CI = 28.79 is determined.

(CI-value < 30 (K2): „Substances that should be considered as being carcinogenic to humans”)

Pictures Nos. 33+34:

2. Project-specific Contaminant Investigation

2.1.3. Sampling of materials, suspected contamination and results Material samples for heavy metals ((HM) and polychlorinated biphenyls (PCB) Nos. 1-5

SM-PCB sample No. 1: Wall paint of interior wall – blue (multi-layer) Sampling Location: Workshop area 1 for storage No. 4 Suspected Contamination: Heavy metals: nickel, cadmium, copper, chromium, mercury, lead, zinc.

polychlorinated biphenyls – PCB

Result: The material contains 8mg/kg TS* lead, 1.50mg/kg /TS cadmium, 17mg/kg TS chromium, 480mg/kg TS copper, 11mg/kg TS nickel, 0.23mg/kg TS mercury and 1070mg/kg TS zinc.

Result PCB: The material is not contaminated (below the detection limit LOD)

Pictures Nos. 35+36:

* TS = Dry matter

2.1.3. Sampling of materials, suspected contamination and results Material samples for heavy metals ((HM) Nos. 1-5 and polychlorinated biphenyls (PCB)

SM-PCB sample No.2:Floor coating yellow / green
Sampling Location:Workshop area 1

Suspected Contamination: Heavy metals: nickel, cadmium, copper, chromium, mercury, lead, zinc.

polychlorinated biphenyls – PCB

Result: The material contains <4mg/kg TS* lead, 0.40mg/kg /TS cadmium, 4mg/kg TS chromium, 8.1mg/kg TS copper, 3.1mg/kg TS nickel, <0.05/kg TS mercury and 7mg/kg TS zinc.

Result PCB: The material is not contaminated (below the detection limit LOD)

Pictures Nos. 37+38:

2.1.3. Sampling of materials, suspected contamination and results

SM-PCB sample No.3:Floor coating gray
Sampling Location:Storage No. 4

Suspected Contamination: Heavy metals: nickel, cadmium, copper, chromium, mercury, lead, zinc.

polychlorinated biphenyls – PCB

Result: The material contains 11mg/kg TS* lead, 3mg/kg /TS cadmium, 15mg/kg TS chromium, 9.2mg/kg TS copper, 9.1mg/kg TS nickel, <0.05mg/kg TS mercury and 70.5mg/kg TS zinc.

Result PCB: The material is not contaminated (below the detection limit LOD)

Pictures Nos. 39+40:

2.1.3. Sampling of materials, suspected contamination and results

SM-PCB sample No.4:Floor coating yellow - smooth
Sampling Location:Workshop area 2

Suspected Contamination: Heavy metals: nickel, cadmium, copper, chromium, mercury, lead, zinc.

polychlorinated biphenyls – PCB

Result: The material contains 13mg/kg TS* lead, 4.1mg/kg /TS cadmium, 250mg/kg TS chromium, 7.4mg/kg TS copper, 410mg/kg TS nickel, <0.05mg/kg TS mercury and 58.9mg/kg TS zinc.

Result PCB: The material is not contaminated (below the detection limit LOD)

Pictures Nos. 41+42:

2. Project-specific Contaminant Investigation

2.1.4. Sampling of materials, suspected contamination and results Material samples for LAGA* classified-construction debris and additional parameters IAW DepV

LAGA Debris sample No. 1: Mixed sample of solid wall structure Sampling Location: Wall structure of office No. 1 to storage No. 4 and of storage No. 4 to workshop area 1 Suspected Contamination: Parameters IAW LAGA classified-construction debris and additional parameters IAW Dep.V.

Result: As per the LAGA codes for construction debris, the sample analyzed shall be classified as installation class Z1.2 and as dump class 1 IAW Attachment 3 Dep.V table 2.

Pictures Nos. 43+44:

* LAGA = Länder Arbeitsgemeinschaft Abfall (German Federal Waste Authority)

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 1:Parapet / wall lining
Location inspected:Office No. 2 & rooms 6-12
Result:Wooden fiber boards (partly on gypsum plaster board) with timber sub-construction.
A IV-timbers have to be assumed here.

Floor-to-ceiling sisal wall lining (mixed construction debris)

Pictures Nos. 45+46:

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 2:Flooring as laminate floor
Location inspected:Annex - rooms 6-12

Result: Laminate as floor covering on asbestos containing PVC-tile

Pictures Nos. 47+48:

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 3:Moisture damage in the area of the suspended ceiling (possibly through the stack)
Location inspected:Storage No. 7

Result: The cause for the damage shall be investigated and repaired in the course of the conversion measures.

Pictures Nos. 49+50:

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 4:Craneway
Location inspected:Workshop area 2 for storage No. 5

Result: Dust and fumes that are harmful to health may be caused during mechanic separation / dismounting work.

Pictures Nos. 51+52:

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 5:Disc seals of the heating flanges
Location inspected:General inspection (workshop areas 1&2, etc.)

Result: Heating flanges might have asbestos containing disc seals.

Pictures Nos. 53+54:

Workshop area Storage No. 4

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 6:Battery-buffered emergency lighting system
Location inspected:General inspection, storage No. 4

Result: The batteries might contain heavy metals (e.g. lead, nickel, cadmium) and acids; the light-fixtures might contain PCB and mercury-containing materials.

Pictures Nos. 55:

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 7:Fluorescent lamps / light-fixtures
Location inspected:General inspection

Result: old light-fixtures may contain mercury (Hg) old capacitors / starters may contain polychlorinated biphenyls (PCB)

Pictures Nos. 56+57:

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 8:Structure of partition wall
Location inspected:Workshop area 1 for storage No. 4
Result:Wall structure:wall plaster (gypsum-based, painted) approx. 3cm
vertical coring bricksapprox. 24cm
wall plaster (gypsum-based, painted) approx. 3cm

Pictures Nos. 58+59:

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 9:Exhaust air duct
Location inspected:Storage No. 4

Result: The former exhaust air duct of the exhaust extraction system for a workstation (welding station) may possibly contain contaminated dust in its interior.

Pictures Nos.60+61:

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 10: Compressor Location inspected: Technical – Mechanical room

Result: Oil shall be removed before dismantling; possibly oil-water mixture in the compressed air circuit.

Pictures Nos. 62+63:

2. Project-specific Contaminant Investigation

2.1.5. Visual assessment, Suspected Contamination und Results, Nos. 1-32.

Visual inspection No. 11: General inspection – Technical – Mechanical rom Location inspected: Room 9

Result: At the time when the inspection was conducted, the room was closed. The following contaminated components / materials might be inside:

· pipe insulation of artificial mineral fibers (AMF)

· asbestos containing disc seals

· PCB containing oils inside old high voltage capacitors / transformers

Picture No. 71:

3. Summary of the results

3.1 Asbestos

Materials containing asbestos, as a firmly bound asbestos product, could be found in the laboratory investigations in the vinyl asbestos floorings ("Floor-Flex panels"), asbestos cement window sills and asbestos cement roof coverings. The old disc seals in the flange connections of the mechanical systems were visually assessed as containing asbestos.

Asbestos containing materials should be dismantled and disposed of by a specialist company in compliance with the required technical rules for hazardous materials (TRGS 519) and the Hazardous Substances Ordinance (GefStoffV).

For the dismantling of firmly bound asbestos (asbestos cement), the supervisory personnel of the specialist company on site should have the certificate of competence TRGS 519; when dealing with asbestos in weakly bound form, the company should have the approval according to Annex III No. 2.4.2 Para.4 of the Hazardous Substances Ordinance (GefStoffV).

All employees should undergo regular occupational health examinations in accordance with the required substance-specific principles (G.....).

3.2 Respirable artificial mineral fibers (AMF) („WHO-fibers“)

Respirable artificial mineral fibers were found as mineral fiber insulation of the mechanical systems (on pipes or receptacles for ventilation, heating, water supply system) and as insulating fill of stud walls, as well as mineral fiber board inserts of various suspended ceiling structures.

Specific instructions for action:

Personal protective equipment (PPE): personal protective clothing Cat 3, type 5/6, breathing masks with particle filter P2 (in case of high loads even P3), gloves.

Technical measures / construction site equipment for dismantling of the insulation in the indoor area: Access through single-chamber lock, air purification and controlled air flow via a ventilation system (blower and filter unit, supply air filter).

Execution of work in the indoor area:

Opening of the components, laying bare of the AMF material step-by-step and careful separation of the material. Collection of materials, packing in mineral wool big bags, transport to the exterior through the lock and disposal.

Cleaning of all components, ceilings, walls and floors by means of a vacuum cleaner with filter category H or M.

Binding of residual fibers after cleaning of the remediation areas.

Visual acceptance by an expert.

A final room air measurement is possible, but not mandatory.

Note: Artificial mineral fibers shall be removed in compliance with TRGS 521 and 905 and stored as per the Waste Code IAW AVV: 17 06 03. ("other insulation materials made of hazardous substances or containing such substances").

All employees should undergo regular occupational health examinations in accordance with the required substance-specific principles (G.....).

3.3 Polyaromatic hydrocarbons (PAHs)

In the course of the investigation, no suspicious substances were discovered with regard to a possible PAH contamination.

General note:

For contamination loads below 50mg/kg benzo(a)pyrene (key parameter), no contaminant-specific protective measures need to be observed during the dismantling work.

As far as disposal is concerned, all sampled materials are below the EPA limit value of 30mg/kg dry matter and can therefore not be classified as hazardous waste.

The limit value for differentiating between hazardous and non-hazardous waste is 30 mg PAH /kg dry matter IAW EPA.

In any case, the method of disposal shall always be clarified with the dump or the recycling company.

The SAM in Mainz only needs to be involved in case of hazardous waste.

Specific instructions for the removal of PAH-contaminated construction materials:

Personal protective equipment (PPE): personal protective clothing Cat 3, type 5/6, breathing masks at least with P2 filters (in case of low contamination load) up to A2P3 filters (in case of high contamination load), gloves.

Technical measures / construction site equipment for dismantling of the materials in the indoor area:

Access through single-chamber lock, air purification via ventilation system (blower and filter unit, supply air filter).

Chiseling open, collection, packing in big bags, transport to the exterior through the lock, disposal.

Cleaning of all surfaces in the remediation area (components, ceilings, walls and floor surfaces) with vacuum cleaner with filter category K1 (or "H") and binding of residual dust.

Visual acceptance by an expert. A final room air measurement is possible, but not mandatory.

3.4 Polychlorinated Biphenyls (PCB)

Substances/paints containing PCBs could not be detected in the course of the material tests at the laboratory.

The capacitors of old fluorescent light-fixtures and old transformers contain PCBs.

Furthermore, parts containing PCBs can be expected in the old main building distribution board in the technical - mechanical room.

To avoid PCB contamination of the building and of the waste to be hauled-off, the fluorescent lamps and capacitors shall be dismounted and separated undamaged.

Transformers and capacitors shall be hauled-off unopened and disposed of by a specialized company. Disposal shall be accomplished compliant with the Waste Code IAW AVV:

160209 "Transformers and capacitors containing PCB or PCT".

3.5 Heavy metals (arsenic, lead, cadmium, chromium, copper, nickel, mercury and zinc)

No particularly striking heavy metal contents were found in any of the material samples analyzed.

No values "LAGA greater than > Z2" could be detected.

Specific instructions for the removal of paints contaminated with heavy metals:

Personal protective equipment (PPE): personal protective clothing Cat 3, type 5/6, breathing masks at least with particle filter P2 (in case of high contamination load even P3), gloves.

Technical measures / construction site equipment for removal of paints in the indoor area:

Access through single-chamber lock, air purification via ventilation system (blower and filter unit, supply air filter).

Chiseling off or blast cleaning or grinding down with direct exhaust extraction, packing in big bags, transport to the exterior through the lock, disposal.

Cleaning of all components, ceilings, walls and floor surfaces with vacuum cleaner with filter category K1 and binding of residual dust.

Visual acceptance by an expert.

Since, depending on the method used, more or less high amounts of adhering mineral materials occur when removing the paints, the material should be analyzed after removal before initiating their disposal. The method of disposal should be agreed with the dump and with the SAM Mainz in case of hazardous waste.

Metal components with heavy metal paints should be dismantled while using dust-free methods (e.g. loosening, chiseling off the rivet joints, not using an angle grinder, e.g.: use of a pendulum action jigsaw with dust extraction) to avoid the release of heavy metal dust. Disposal shall be coordinated with the metal recycling company.

B) Mercury containing waste (Hg)

The fluorescent tubes of old fluorescent light-fixtures contain mercury vapor.

Therefore, they must not be broken during dismantling.

Disposal shall comply with the Waste Code IAW AVV: 200121 "Fluorescent tubes and other mercury containing waste”.

3.6 LAGA* classified - construction debris

As per the LAGA classification for construction debris, the sample analyzed shall be classified as installation class Z1.2 and as dump class 1 IAW Attachment 3 DepV Table 2.

Experience shows that due to the great inhomogeneity of the previously installed building materials, high fluctuations of the individual values have to be expected in case of selective sampling.

Therefore, current declaration analyses from the heaps of demolition materials or from
the debris containers are required repeatedly during or after the dismantling work.

The dump can (in the case of hazardous waste in consultation with the SAM) decide which LAGA classification is actually required, as particularly in case of certain accompanying parameters, such as e.g. ignition loss or the like, there are exceptions, so that a more favorable disposal classification may be possible.

3.7 Other contaminants

A) Treated wood

Treated wood shall be dismounted and disposed of as contaminated wood (A4 wood).

Treated wood is present in all parts of the building as wood for the wall paneling, doors, furniture and various other components.

If working with a saw is necessary, care shall be taken to ensure low-dust processes (with dust extraction); skin contact shall be avoided, i.e. gloves and dust masks (P1 or better P2) shall be worn.

* LAGA = Länder Arbeitsgemeinschaft Abfall (German Federal Waste Authority)

4. Short summary of the samples with result (blue is contaminated)

Asbestos Sample No.1:Fill of fire rated door
Sampling Location:Office No. 1 for workshop area 1
Result:No asbestos has been detected in the material.
Asbestos Sample No.2:gray paint under floor coating yellow/grey
Sampling Location:Workshop area 2
Result:No asbestos has been detected in the material.
Asbestos Sample No.3:PVC – tiles light brown / beige
Sampling Location:Corridor to office No. 11
Result:Chrysotile asbestos has been detected in the material.
Asbestos Sample No.4:Adhesive under PVC – tiles light gray / beige
Sampling Location:Corridor to office No. 11
Result:No asbestos has been detected in the material.
Asbestos Sample No.5:PVC – tiles under laminate floor
Sampling Location:Office No. 10
Result:Chrysotile asbestos has been detected in the material.
Asbestos Sample No.6:PVC - tiles under laminate floor
Sampling Location:Storage No. 7
Result:Chrysotile asbestos has been detected in the material.
Asbestos Sample No.7:Fiber cement of window sill
Sampling Location:Storage No. 7
Result:Chrysotile asbestos has been detected in the material.
Asbestos Sample No. 8:Roof covering
Sampling Location:In the exterior – roof covering of annex
Result:Chrysotile asbestos has been detected in the material.
Asbestos Sample No. 9:Roof covering
Sampling Location:In the exterior – roof covering of hall roofs
Result:Chrysotile asbestos has been detected in the material.
AMF sample No. 1:Pipe insulation, with plastic jacket
Sampling Location:Storage No. 4

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition) Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2: A carcinogenicity index of CI = 15.96 is determined.

AMF sample No. 2:Mineral fiber insulation of light weight wall
Sampling Location:Room 3 – Server / Comm room

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition) Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2: A carcinogenicity index of CI = 19.91 is determined.

AMF sample No. 3:Mineral fiber lining panels of the ceilings
Sampling Location:Room 3 – Server / Comm room

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition) Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2: A carcinogenicity index of CI = 17.60 is determined.

AMF sample No. 4:Pipe insulation at air heater
Sampling Location:Workshop area 2

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition) Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2: A carcinogenicity index of CI = 15.69 is determined.

AMF sample No. 5:Mineral fiber ceiling panel of the suspended ceiling
Sampling Location:Office No. 6

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition) Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2: A carcinogenicity index of CI = -3.16 is determined.

AMF sample No. 6:Mineral fiber ceiling panel of the suspended ceiling
Sampling Location:Room 13a – Men’s restroom

Investigation 1: scanning electron microscopy analysis for respirable fibers IAW WHO-definition Result1: The material contains respirable artificial mineral fibers, AMF, (IAW WHO-definition) Investigation 2: quantitative X-ray microanalysis to determine the carcinogenicity index (CI):

Result 2: A carcinogenicity index of CI = 28.79 is determined.

(CI-value < 30 (K2): „Substances that should be considered as being carcinogenic to humans”)

SM-PCB sample No. 1: Wall paint of the interior wall – blue (multi-layer)

Sampling Location:Workshop area 1 to Storage No. 4
Suspected Contamination:Heavy metals: nickel, cadmium, copper, chromium, mercury, lead, zinc.
polychlorinated biphenyls – PCB
Result:The material contains 8mg/kg TS* lead, 1.50mg/kg /TS cadmium,

17mg/kg TS chromium, 480mg/kg TS copper, 11mg/kg TS nickel, 0.23mg/kg TS mercury and 1070mg/kg TS zinc.

Result PCB: The material is not contaminated (below the detection limit LOD)

SM-PCB sample No.2:Floor coating yellow/green
Sampling Location:Workshop area 1
Suspected Contamination:Heavy metals: nickel, cadmium, copper, chromium, mercury, lead, zinc.
polychlorinated biphenyls – PCB
Result:The material contains <4mg/kg TS* lead, 0.40mg/kg /TS cadmium,

4mg/kg TS chromium, 8.1mg/kg TS copper, 3.1mg/kg TS nickel, <0.05/kg TS mercury and 7mg/kg TS zinc.

Result PCB: The material is not contaminated (below the detection limit LOD)

SM-PCB sample No.3:Floor coating gray
Sampling Location:Storage No. 4
Suspected Contamination:Heavy metals: nickel, cadmium, copper, chromium, mercury, lead, zinc.
polychlorinated biphenyls – PCB
Result:The material contains 11mg/kg TS* lead, 3mg/kg /TS cadmium,

15mg/kg TS chromium, 9.2mg/kg TS copper, 9.1mg/kg TS nickel, <0.05mg/kg TS mercury and 70.5mg/kg TS zinc.

Result PCB: The material is not contaminated (below the detection limit LOD)

SM-PCB sample No.4:Floor coating yellow - smooth
Sampling Location:Workshop area 2
Suspected Contamination:Heavy metals: nickel, cadmium, copper, chromium, mercury, lead, zinc.
polychlorinated biphenyls – PCB
Result:The material contains 13mg/kg TS* lead, 4.1mg/kg /TS cadmium,

250mg/kg TS chromium, 7.4mg/kg TS copper, 410mg/kg TS nickel, <0.05mg/kg TS mercury and 58.9mg/kg TS zinc.

Result PCB: The material is not contaminated (below the detection limit LOD)

* TS = Dry mass

LAGA debris sample No. 1: Mixed sample of solid wall structure Sampling Location: Wall structure of office No. 1 to storage No. 4 and of storage No. 4 to workshop area 1 Suspected Contamination: Parameters IAW LAGA classified-construction debris and additional parameters IAW Dep.V.

Result: As per the LAGA codes for construction debris, the sample analyzed shall be classified as installation class Z1.2 and as dump class 1 IAW Attachment 3 Dep.V table 2.

Visual inspection No. 1:Parapet / wall lining
Location inspected:Office No. 2 & rooms 6-12
Result:Wooden fiber boards (partly on gypsum plaster board) with timber sub-construction.

A IV-timbers have to be assumed here.

Floor-to-ceiling sisal wall lining (mixed construction debris)

Visual inspection No. 2:Flooring as laminate floor
Location inspected:Annex - rooms 6-12
Result:Laminate as floor covering on asbestos containing PVC-tile
Visual inspection No. 3:Moisture damage in the area of the suspended ceiling (possibly through the stack)
Location inspected:Storage No. 7
Result:The cause for the damage shall be investigated and repaired in the course of the conversion measures.
Visual inspection No. 4:Craneway
Location inspected:Workshop area 2 for storage No. 5
Result:Dust and fumes that are harmful to health may be caused during mechanic separation / dismounting work.
Visual inspection No. 5:Disc seals of the heating flanges
Location inspected:General inspection (workshop areas 1&2, etc.)
Result:Heating flanges might have asbestos containing disc seals.
Visual inspection No. 6:Battery-buffered emergency lighting system
Location inspected:General inspection, storage No. 4
Result:The batteries might contain heavy metals (e.g. lead, nickel, cadmium) and acids; the light-fixtures might contain PCB and mercury-containing materials.
Visual inspection No. 7:Fluorescent lamps / light-fixtures
Location inspected:General inspection
Result:old light-fixtures may contain mercury (Hg)

old capacitors / starters may contain polychlorinated biphenyls (PCB)

Visual inspection No. 8:Structure of partition wall
Location inspected:Workshop area 1 for storage No. 4
Result:Wall structure:wall plaster (gypsum-based, painted) approx. 3cm
vertical coring bricksapprox. 24cm
wall plaster (gypsum-based, painted) approx. 3cm
Visual inspection No. 9:Exhaust air duct
Location inspected:Storage No. 4
Result:The former exhaust air duct of the exhaust extraction system for a workstation (welding station) may possibly contain contaminated dust in its interior.

Visual inspection No. 10: Compressor

Location inspected:Technical – Mechanical room
Result:Oil shall be removed before dismantling; possibly oil-water mixture in the compressed air circuit

Visual inspection No. 11: General inspection – Technical – Mechanical rom

Location inspected:Room 9
Result:At the time when the inspection was conducted, the room was closed. The following contaminated components / materials might be inside:

· pipe insulation of artificial mineral fibers (AMF)

· asbestos containing disc seals

· PCB containing oils inside old high voltage capacitors / transformers

5. Disclaimer

This report is a planning and calculation aid and does not claim to be complete. We have not detected any further sources of contamination during our visual inspections. However, there also is the possibility of hidden contamination and due to the inhomogeneity of the construction materials deviations may occur. The determined dimensions, material thicknesses and types of materials may also be subject to deviations.

Wicke Umwelttechnik GmbH is not liable for direct damage cause by deficiencies or for consequential damage, losses or costs associated with the use of this investigation report. Implied warranties for applicability or suitability for a particular purpose are expressly excluded.

Weilerbach, Dec. 12, 2016

H. von Mühlen F. Wicke

(Holger von Mühlen(Freddy Wicke, Dipl. Chem. / GF)
(Project design, construction supervision)

image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image27.jpeg image28.jpeg image29.jpeg image30.jpeg image31.jpeg image32.jpeg image33.jpeg image34.jpeg image35.jpeg image36.jpeg image37.jpeg image38.jpeg image39.jpeg image40.jpeg image41.jpeg image42.jpeg image43.jpeg image44.jpeg image45.jpeg image46.jpeg image47.jpeg image48.jpeg image49.jpeg image50.jpeg image51.jpeg image1.jpeg image2.jpeg image52.png