Consolidated_Q&A__7.pdf

PDF 44 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA5613-19-R-0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document contains consolidated questions and answers regarding solicitation number FA5613-19-R-0003, a multiple award construction contract for the Kaiserslautern Military Community in Germany. The Air Force intends to award up to five indefinite-delivery, indefinite-quantity contracts valued at a total of $425 million over five years. Task orders will range from $1,000 to $5 million for design-build, sustainment, maintenance, alteration, repair, renovation, and minor construction projects. A seed project at Ramstein Air Base is valued between $1 million and $5 million. The request for proposal was anticipated to be released on November 1, 2018 with proposals due by December 1, 2018. The pre-proposal conference was scheduled for approximately one week after RFP release at Ramstein Air Base. All contractors must be registered in the System for Award Management to receive an award.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FA5613-19-R-0003-0004.pdf PDF
(Amend_0004)_Section_L.pdf PDF
(Amendment_0004)_Section_M.pdf PDF
Consolidated_Q&A__6.pdf PDF
Consolidated_Q&A__5.pdf PDF
Atch_3k_-_Drinking_Water_Analysis.pdf PDF
RFP_Atch_3_-_(Rev_3_)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
Consolidated_Q&A__3.pdf PDF
RFP_Atch_3i_-_Noise_Contour_Map_RAB.pdf PDF
RFP_Atch_3_-_(Rev_2)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
RFP_Atch_3g_-_(Rev_1)_Shelf_Layouts_and_Dimensions.pdf PDF
FA5613-19-R-0003-0002.pdf PDF
RFP_Atch_3g_-_Shelf_Layouts_&_Dimensions.pdf PDF
FA5613-19-R-0003-0001.pdf PDF
RFP_Atch_5e_-_Premise_Wiring_Standard.pdf PDF
Atch_3_-_Pre-Prop_Conf_&_Site_Visit_Briefing.pdf PDF
Atch_1_-_Conf_&_Site_Visit_Attendance_Record.pdf PDF
Atch_2_-__Consolidated_Q&A_2_(Conf_&_Site_Visit).pdf PDF
Pre-Proposal_Conference_Minutes.pdf PDF
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.dwg DWG drawing
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.pdf PDF
RFP_Atch_8_-_SubK_Consent_Ltr.doc DOC document
RFP_Atch_3_-_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
RFP_Atch_3f03_-_B02_-_Inventory_topview.dwg DWG drawing
RFP_Atch_3f05_-_B04_-_Inventory_elevations.pdf PDF
RFP_Atch_5a_-_Standardized_Technical_Proposal_(STP).pdf PDF
Invitation_for_Pre-Proposal_&_Conf_Site_Visit.pdf PDF
RFP_Atch_3e_-_Bldg_2167_Work_and_Safety_Plan.docx DOCX document
RFP_Atch_3f06_-_A01_-_New_planning_floor_plan.dwg DWG drawing
RFP_Atch_1_-_General_Requirements_&_Provisions.pdf PDF
RFP_Atch_3f06_-_A01_-_New_planning,_floor_plan.pdf PDF
RFP_Atch_3a_-_Bldg_2167_Contaminant_Investigation_Report.docx DOCX document
RFP_FA5613-19-R-0003_(MACC).pdf PDF
RFP_Atch_2_-_Special_Contract_Requirements.pdf PDF
RFP_Atch_3f04_-_B03_-_Inventory_sectional_views.pdf PDF
RFP_Atch_5b_-_LD_Determination.pdf PDF
Cover_Ltr_-_RFP_Release.pdf PDF
RFP_Atch_3d_-_Bldg_2167_Sample_Taking_Plan.pdf PDF
RFP_Atch_3f04_-_B03_-_Inventory_sectional_views.dwg DWG drawing
RFP_Atch_4_-_Seed_Proj_Bid_Schedule_Worksheet.xlsx XLSX spreadsheet
RFP_Atch_9_-_Client_Authorization_Ltr.docx DOCX document
RFP_Atch_7_-_PPQ.doc DOC document
RFP_Atch_3f03_-_B02_-_Inventory_topview.pdf PDF
RFP_Atch_6_-_PPI.doc DOC document
RFP_Atch_3c_-_Bldg_2167_Room_Book.xls XLS spreadsheet
RFP_Atch_3f02_-_B01_-_Inventory_floor_plan.pdf PDF
RFP_Atch_5c_-_Material_Submittal_Form_66_TYFR_18-1047.pdf PDF
RFP_Atch_3f02_-_B01_-_Inventory_floor_plan.dwg DWG drawing
Invitation_Atch_1_-_PreRegistration_Form.docx DOCX document
RFP_Atch_3b_-_Bldg_2167_Disposal_Concept.xlsx XLSX spreadsheet
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Consolidated Q&A #7 Multiple Award Construction Contract (MACC)

FA5613-19-R-0003

K – Contracting C – Cost/Pricing T- Technical P – Past Perf.

Solicitation/A ttachment Reference

Cross Reference Discussion/Comment/Question Government Response

Volume III- Price: L.6.3.2, and SOW 1.5.3.3

L.6.3.2 :Install outer roof is part of new construction :

Does this mean that only the roof of the annex is part of the new construction, or the whole annex, incl. earthwork, foundations, steel and roof?

According to SOW 1.5.3.3, Bill of Quantities, also Install new outer roof is new construction. Do we also have to list separate line items in the Bill of Quantities?

Only the roof including pillars and foundations is new construction, not the repair or replacement of the existing concrete area. However, considering the question, the Government had determined that separating the bill of quantities line items between renovation and new construction is no longer necessary; therefore, Atch 3 – SOW, the RFP Section L&M are revised to change the following:

1) Atch 3 – Seed Project SOW: Paragraph 1.5.3.3, Bill of Quantities, “The line items for new construction and for renovation shall be listed separately. The new construction items consist of: Install sprinkler system, Remove/demolish walls, Close wall openings, and Install outer roof.” was deleted in its entirety.

2) RFP Section L.4.3.1(c), Bill of Quantities Calculation - “The line items for new construction and for renovation shall be listed separately. The new construction items consist of:

Install sprinkler system, Remove/demolish walls, Close wall openings, and Install outer roof.” was deleted from the paragraph.

3) RFP Section M.3.1.1, Subfactor 1 Table: The left column, Section L Reference, L.4.3.1.1(c), Bill of Quantities Calculation, the same language was deleted to reflect the change mentioned in 2) above.

4) RFP Section L.6.3.2, Proposed Price, remains unchanged, meaning that the line items for new construction and for renovation shall be listed separately by using appropriate columns in Atch 4 – Seed Project Bid Schedule.

*** IMPORTANT NOTICE: Normally, the changes mentioned above would be accomplished by an amendment to the RFP. However, the Government

Consolidated Q&A #7 Multiple Award Construction Contract (MACC)

FA5613-19-R-0003

currently is in between two contract writing systems, a complete migration from one system to a brand new system. For this reason, the Government is unable to issue a formal Amendment 0004 that would address these changes until the new system is implemented next week.

Due to this unfortunate circumstance, please consider this Q&A answer as a “temporary Amendment 0004” until the official Amendment 0004 is issued and posted on FBO next week. In the meantime, Atch 3 (Rev 4) SOW, Revised Section L and Section M are attached to this Q&A to assist the offerors in preparing their proposals.

We apologize for this huge inconvenience.