Consolidated_Q&A__6.pdf

PDF 43 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA5613-19-R-0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document contains a consolidated question and answer file and a description of a federal contract opportunity for a Multiple Award Construction Contract on various military installations in Germany. The consolidated Q&A file addresses technical, cost, and past performance questions from offerors regarding requirements for the MACC solicitation such as construction phasing and quality control plans. The federal contract opportunity notice provides details about solicitation number FA5613-19-R-0003, including that the Air Force intends to award up to five IDIQ contracts plus two additional on-ramp contracts for design-build, sustainment, maintenance, alteration, repair, renovation, and minor construction projects across Ramstein and Spangdahlem Air Bases. The estimated total value of task orders over the five-year ordering period is $425 million, with individual task orders ranging from $1,000 to $5 million. The anticipated solicitation release date is November 1, 2018 and the proposal receipt date is December 1, 2018.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
(Rev_4)_SOW_for_Seed_Proj_(Amend_0004).pdf PDF
FA5613-19-R-0003-0004.pdf PDF
(Amend_0004)_Section_L.pdf PDF
Consolidated_Q&A__7.pdf PDF
(Rev_4)_SOW_for_Seed_Proj_(Amend_0004).pdf PDF
Consolidated_Q&A__5.pdf PDF
FA5613-19-R-0003-0003.pdf PDF
Atch_3k_-_Drinking_Water_Analysis.pdf PDF
RFP_Atch_3_-_(Rev_3_)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
Consolidated_Q&A__4.pdf PDF
Consolidated_Q&A__3.pdf PDF
RFP_Atch_3j_-_Hydrant_Flow_Test.xls XLS spreadsheet
RFP_Atch_3h_-_Utility_Lines.pdf PDF
RFP_Atch_3i_-_Noise_Contour_Map_RAB.pdf PDF
RFP_Atch_3g_-_Shelf_Layouts_&_Dimensions.pdf PDF
RFP_Atch_3_-_(Rev_1)_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
FA5613-19-R-0003-0001.pdf PDF
Pre-Proposal_Conference_Minutes.pdf PDF
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.dwg DWG drawing
RFP_Atch_3f01_-_Cover,_TOC,_location_plan.pdf PDF
RFP_Atch_8_-_SubK_Consent_Ltr.doc DOC document
RFP_Atch_3_-_SOW_for_Seed_Proj_TYFR18-1047.pdf PDF
RFP_Atch_3f03_-_B02_-_Inventory_topview.dwg DWG drawing
RFP_Atch_3f05_-_B04_-_Inventory_elevations.pdf PDF
RFP_Atch_5a_-_Standardized_Technical_Proposal_(STP).pdf PDF
Invitation_for_Pre-Proposal_&_Conf_Site_Visit.pdf PDF
RFP_Atch_3e_-_Bldg_2167_Work_and_Safety_Plan.docx DOCX document
RFP_Atch_3f06_-_A01_-_New_planning_floor_plan.dwg DWG drawing
RFP_Atch_1_-_General_Requirements_&_Provisions.pdf PDF
RFP_Atch_9_-_Client_Authorization_Ltr.docx DOCX document
RFP_Atch_7_-_PPQ.doc DOC document
RFP_Atch_3f03_-_B02_-_Inventory_topview.pdf PDF
RFP_Atch_6_-_PPI.doc DOC document
RFP_Atch_3c_-_Bldg_2167_Room_Book.xls XLS spreadsheet
RFP_Atch_3f02_-_B01_-_Inventory_floor_plan.pdf PDF
RFP_Atch_5c_-_Material_Submittal_Form_66_TYFR_18-1047.pdf PDF
RFP_Atch_3f02_-_B01_-_Inventory_floor_plan.dwg DWG drawing
Invitation_Atch_1_-_PreRegistration_Form.docx DOCX document
RFP_Atch_3b_-_Bldg_2167_Disposal_Concept.xlsx XLSX spreadsheet
RFP_Atch_5d_-_Env_Impact_Study_AF813_TYFR_18-1047.pdf PDF
RFP_Atch_3f05_-_B04_-_Inventory_elevations.dwg DWG drawing
RFP_Atch_10_-_Questions_&_Answers_Form.docx DOCX document
RFP_Atch_3f06_-_A01_-_New_planning,_floor_plan.pdf PDF
RFP_Atch_3a_-_Bldg_2167_Contaminant_Investigation_Report.docx DOCX document
RFP_FA5613-19-R-0003_(MACC).pdf PDF
RFP_Atch_2_-_Special_Contract_Requirements.pdf PDF
RFP_Atch_3f04_-_B03_-_Inventory_sectional_views.pdf PDF
RFP_Atch_5b_-_LD_Determination.pdf PDF
Cover_Ltr_-_RFP_Release.pdf PDF
RFP_Atch_3d_-_Bldg_2167_Sample_Taking_Plan.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Consolidated Q&A #6 Multiple Award Construction Contract (MACC)

FA5613-19-R-0003

K – Contracting C – Cost/Pricing T- Technical P – Past Perf.

Solicitation/A ttachment Reference

Cross Reference Discussion/Comment/Question Government Response

T-01 SOW 1.5.2.8 Construction Phasing

The SOW mentions “individual phase durations should be considered only in developing the Government’s proposed overall contract duration.” Please confirm that the Government is looking for a time durations for phases or major elements of work (i.e. 3 months) as part of the Construction Phase-In Plan for the proposal deliverable.

The construction phasing diagram shall not indicate durations. Durations shall only be considered for the overall contract duration. See

SOW 1.3.

T-02 SOW 1.5.2.8 Construction Phasing

Can the Government please clarify their definition of a Swing Space Duration?

Swing Space Duration describes for how long the occupants of the bldg. have to be relocated to another bldg., if necessary.

T-03

L.4.3.2 Subfactor 2- Quality Management Plan

Quality Control Plan

Please provide Offerors with the specification/standard that governs design quality control measures being sought for this effort

The quality control plan is not based on a specification or standard. It is an 86 CES/CEN internal requirement.

Correction on Q&A #5, T-07

Amendment 1 Attachment 3g Shelf Layouts & Dimensions

Offerors request the Government provide additional information about the depth of the shelves.

On Q&A #5, T-07, the Government provided the answer to this question with:

Type A: 60cm Type B: 50cm Type C: 75cm

However, the information for the Type B and C were erroneously switched. The correct shelf depth measurements are as follows:

Type A: 60cm Type B: 75cm Type C: 50cm

We apologize for the errors.

Consolidated Q&A #6 Multiple Award Construction Contract (MACC)

FA5613-19-R-0003

File details come from the government source that posted it. Updated .