This document contains a cost estimate template for a construction project on Kadena Air Base in Okinawa, Japan. The template provides line items for demolition, civil, architectural, electrical and non-priced work required to construct a motorcycle and bicycle shelter at Building 177 on base. Estimated costs are provided for materials, labor, equipment and total costs for each work item. The total estimated cost for the project is listed as $0.00, as no quantities or unit costs are included in the template.

The related federal contract opportunity is solicitation number FA527023R0006 for SABER projects on Okinawa issued by the Department of the Air Force Pacific Air Forces. While no further details are provided on requirements, response dates, or place of performance, the cost estimate template appears to be for a project that could be awarded under this SABER solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Okinawa SABER, newest first.
File Type Posted
Attachment 1 - Section L Inst Cond and Notice to Offerors Rev 15 Sep 23.pdf PDF
Attachment 3 - Master Statement of Work Revised 15 Sep 23.pdf PDF
After RFI Cutoff Government Response Okinawa SABER.xlsx XLSX spreadsheet
Solicitation Amendment FA527023R00060003 SF 30 CO Signed.pdf PDF
After RFI Cutoff Government Response Okinawa SABER.xlsx XLSX spreadsheet
AF3052_LXEZ211015 Construct Bicycle and Motorcycle Shelter B177 (KTR).xlsx XLSX spreadsheet
Attachment 7 -Seed Project - Revised Task Order Statement of Work.pdf PDF
Attachment 5 - Request for Information Form Government Response Phase II.xlsx XLSX spreadsheet
Solicitation Amendment FA527023R00060002 SF 30.pdf PDF
Solicitation Amendment - FA527023R00060002.pdf PDF
Attachment 3 - Master Statement of Work Revised 10 Aug 23.pdf PDF
Attachment 1 - Section L - Instructions Conditions and Notices to Offerors Revised 10 Aug 23.pdf PDF
Attachment 2 - Section M - Evaluation Factors for Award Revised 10 Aug 23.pdf PDF
Attachment 5 - Request for Information Form Government Response.xlsx XLSX spreadsheet
Solicitation Amendment FA527023R00060001 SF 30.pdf PDF
Solicitation Amendment - FA527023R00060001.pdf PDF
Attachment 7 - Seed Project - Attachment 3 - B760 Shelter Photos.pdf PDF
Attachment 7 -Seed Project - Task Order Statement of Work.pdf PDF
Attachment 2 - Section M - Evaluation Factors for Award.pdf PDF
Attachment 7 - Seed Project - Attachment 2 - As-Built Site And Utility Plan.pdf PDF
Attachment 7 - Seed Project - Attachment 4 - B177 Shelter Site Plan.pdf PDF
Attachment 6 - Past Performance Questionnaire.docx DOCX document
Attachment 4 - Master Specification.pdf PDF
Attachment 3 - Master Statement of Work.pdf PDF
Attachment 1 - Section L - Instructions Conditions and Notices to Offerors.pdf PDF
Attachment 7 - Seed Project - Attachment 1 - Site Location Map.pdf PDF
Attachment 5 - Request for Information Form.xlsx XLSX spreadsheet
Attachment IV - Kadena Design Guide.pdf PDF
Attachment III - 718 CES UFGS Division 01 Supplement.pdf PDF
Attachment I - 718 CES Environmental Specifications.pdf PDF
Exhibit A - Price Schedule.xlsx XLSX spreadsheet
Attachment II - Section 01560 Environmental Protection.pdf PDF
Solicitation - FA527023R0006.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Estimate Template-KTR

CONTRACTOR'S COST PROPOSAL
SABER BASIC CONTRACT NO.PURCHASE REQUEST NUMBERCONTRACTOR / GOVERNMENT
PROJECT NO. & TITLETOTAL COST ESTIMATE
LXEZ 211015, Construct Motorcycle and Bicycle Shelter, B177 KAB, Okinawa, Japan¥0$0.00
LINE
NO.ITEMMATERIAL COSTLABOR COSTEQUIP. COSTLINE

TOTAL

(1)(2)(3)(4)(6)
DIRECT CONSTRUCTION COST
1Demolition Work Sub Total$ - 0$ - 0$ - 0$ - 0
2Civil Work Sub Total$ - 0$ - 0$ - 0$ - 0
3Architectural Work Sub Total$ - 0$ - 0$ - 0$ - 0
4Electrical Work Sub Total$ - 0$ - 0$ - 0$ - 0
Total "Bare" Direct Cost estimated by RS Means$ - 0
5AREA COST FACTOR (SACF/ACF)-Kadena SACF-214.000%
Total Localized "Bare" Direct Cost estimated by RS Means$ - 0
DIRECT CONSTRUCTION COST (LOCAL PRICE)
6Non-Priced Item Total (local price)$ - 0$ - 0$ - 0$ - 0
Total Localized "Bare" Direct Cost estimated by RS Means and NPI$ - 0
CONSTRUCTION COST INDEX
7SABER COFFICIENT & CONDITION
Coefficient NameLocation & TimeCoefficient Rate-
Normal Location + Regular Work Hours
TOTAL CONTRACT PRICE$ - 0
FOREIGN EXCHANGE RATE ¥/$:FY23¥127.7677/$1.00¥ - 0
Estimating Reference: Unit Price Guides (UPG) is based on RS Means. Non-Priced Item are based on local price.
ESTIMATOR:Ms/Mr. XXXXXXOFFICEDATE:

Michael D. Benton michael.benton.2@us.af.mil &"-,Bold"&14FOR OFFICIAL USE ONLY &P

Cost Estimate Breakdown-KTR

CONTRACTOR'S COST PROPOSAL
SABER BASIC CONTRACT NO.PURCHASE REQUEST NUMBERCONTRACTOR / GOVERNMENT
PROJECT NO. & TITLETOTAL COST ESTIMATE
LXEZ 211015, Construct Motorcycle and Bicycle Shelter, B177 KAB, Okinawa, Japan
LINE

NO.

(RS Means) ITEM UNIT OF MEASURE QUANTITY MATERIAL COST LABOR COST EQUIP. COST LINE

TOTAL

UNIT
$TOTAL
$AVERAGE

RATE

$TOTAL
$UNIT
$TOTAL
(1)(2)(3)(4)(5)(7)(8)(9)(10)(11)
DIRECT CONSTRUCTION COST
Demolition Work
Remove Electrical Panel at B 70176 incl breakers, etcEA
Remove Concrete Curb and Gutter (4" THK)SY
Soil/Sod ExcavationMSF
Total - Demolition
Civil Work
Base Course 6"SY
Backfill with CompactionECY
HaulingLCY
Sub-Grade Incl Compaction (6")SY
Concrete Curb/Gutter incl FormworksLF
Concrete FormWork for Ramp & DriveSF
Concrete Ramp & Drive Including Reinforcing (6")SF
Total - Civil
Architectural Work
Concrete Foundation Incl. Reinforcing &FormworkCY
Reinforced Concrete Floor Slab - 4"SF
Concrete Roof Beam Incl. Reinforcing & FormsCY
Conc Roof Slab (CIP) incl Reinforcement & FormworksCY
Conc Roof ScaffoldingCSF
Concrete Masonry UnitsSF
Decorative Concrete Masonry UnitsSF
Acrylic Roof CoatingSF
Non-Slip Epoxy Coating (Prime coat)SF
Non-Slip Epoxy Coating (Interemediate coat)SF
Non-Slip Epoxy Coating (Top coat)SF
Latex Paint Prep/PrimerSF
Latex Paint 2nd coatSF
Sealant, Expansion JointLF
Total - Architectural
Electrical Work
Electrical FeederHLF
PVC ConduitLF
RS ConduitLF
PanelboardEA
Disconnect SwitchEA
Photocell Switch, WPEA
Hand-Off-Auto Selector SwitchEA
LED Lighting FixturesEA
GFCI receptaclesEA
Excavation and BackfillCY
Total - Electrical
Non-Priced Items (NPI)
Soil Compaction TestSoil Compaction TestSoil Compaction TestSoil Compaction TestSoil Compaction TestEA
DumpsterDumpsterDumpsterDumpsterDumpsterEA
Dumpster FeesDumpster FeesDumpster FeesDumpster FeesDumpster FeesT
Disposal Truck (10-ton)Disposal Truck (10-ton)Disposal Truck (10-ton)Disposal Truck (10-ton)Disposal Truck (10-ton)EA
Storage TrailerStorage TrailerStorage TrailerStorage TrailerStorage TrailerM
Port-O-JohnPort-O-JohnPort-O-JohnPort-O-JohnPort-O-JohnM
Total - NPI

TOTAL COST $ - 0 $ - 0 $ - 0 $ - 0

Estimating Reference: Unit Price Guides (UPG) is based on RS Means. Non-Priced Item are based on local price.
ESTIMATOR:OFFICE

Michael D. Benton michael.benton.2@us.af.mil &"-,Bold"&14FOR OFFICIAL USE ONLY &P