Sol FA4890-10-R-0001 Draft CAAS IV RFP Atch 6 - Table B-1 21 Apr 10.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Air Combat Command Acquisition Management and Integration Center (HQ ACC AMIC) Contracted Advisory and Assistance Services (CAAS) IV
Solicitation number
FA4890-10-R-0001
Issued by

About this file

Attachment 6 B-1 Pricing Table 21 Apr 10

View the file

Other files

File Type Posted
Posted 22 Apr 11 CAAS IV Status Update.docx DOCX document
CAAS IV Solicitation FA4890-10-R-0001 CO Memo 3 March 11.docx DOCX document
CAAS IV Solicitation FA4890-10-R-0001 CO Memo 3 Dec 10.docx DOCX document
CAAS IV Solicitation FA4890-10-R-0001 CO Memo 2 Dec 10 Answer to Question.docx DOCX document
CAAS IV Solicitation FA4890-10-R-0001 CO Memo 1 Dec 10.docx DOCX document
Government Responses to Industry - 1 Dec 10.docx DOCX document
CAAS IV RFP Amendment 1 Exhibit A - CAAS IV Table B-1 Pricing Table —
Goverment Responses to Industry Questions - 19 Nov 10.docx DOCX document
CAAS IV RFP Amendment 1 Attachment 5 - CAAS IV PWS Appendix D - TO Proposal Process —
PD2 PDF.doc DOC document
CAAS IV RFP Amendment 1 Attachment 1 - CAAS IV PWS —
CAAS IV RFP Amendment 1 Attachment 3 - CAAS IV PWS Appendix B - CDRLs —
CAAS IV Performance Plan 19 Nov 10.docx DOCX document
CAAS IV Solicitation FA4890-10-R-0001 CO Memo 19 Nov 10.docx DOCX document
Gov't Responses to Industry RFP Change Matrix - 29 Oct 10.docx DOCX document
CAAS IV Solicitation FA4890-10-R-0001 CO Memo 29 Oct 10.docx DOCX document
CAAS IV Performance Plan.docx DOCX document
CAAS IV RFP Amendment 1 Exhibit 1 - CAAS IV Table B-1 Pricing Table —
CAAS IV Solicitation FA4890-10-R-0001 CO Memo 20 Oct 10.docx DOCX document
Past Performance Information Tool SAMPLE.mdb MDB file
CAAS IV Solicitation FA4890-10-R-0001 CO Cover Letter.docx DOCX document
CAAS IV RFP Attachment 6 - Hampton Roads Areas Wage Determination —
FA4890-10-R-0001 —
CAAS IV RFP Attachment 7 - Washington DC Areas Wage Determination —
FINAL CAAS IV Table B-1 Pricing Table —
CAAS IV RFP Attachment 5 - PWS Appendix D - TO Proposal Process —
CAAS IV RFP Attachment 3 - PWS Appendix B - CDRLs —
CAAS IV RFP Attachment 2 - PWS Appendix A - Acronyms —
CAAS IV RFP Attachment 1 - PWS —
CAAS IV RFP Attachment 4 - PWS Appendix C - Publications and Forms —
Gov't Responses to Industry Questions 29 Sept 10.docx DOCX document
Sol FA4890-10-R-0001 Docs to post to industry.docx DOCX document
Gov't Responses to Industry Questions 25 Aug 10.docx DOCX document
CAAS IV PWS 24 Aug 10 with Changes.docx DOCX document
Appendix D - TO Proposal Process 24 Aug 10 with Changes.docx DOCX document
CAAS IV RFP 24 Aug 10 with Changes.docx DOCX document
Sol FA4890-10-R-0001 Docs to post to industry.docx DOCX document
CAAS IV RFP Atch 6 - Table B-1 17 Jul 10.xlsx XLSX spreadsheet
CAAS IV RFP 20 Jul 10.docx DOCX document
CAAS IV Solicitation Status 20 Jul 10.docx DOCX document
CAAS IV Update to Industry Letter 3 Jun 10.docx DOCX document
Sol FA4890-10-R-0001 PWS examples 29 Apr 10.docx DOCX document
Sol FA4890-10-R-0001 Draft CAAS IV Appendix A - Acronyms 21 Apr 10.docx DOCX document
Sol FA4890-10-R-0001 Draft CAAS IV App C - Publications and Forms 21 Apr 10.docx DOCX document
Sol FA4890-10-R-0001 Updates to CAAS IV Draft RFP Cover Letter.docx DOCX document
Sol FA4890-10-R-0001 Draft CAAS IV RFP ao 21 Apr 10.docx DOCX document
Sol FA4890-10-R-0001 Draft CAAS IV PWS ao 21 Apr 10.docx DOCX document
Sol FA4890-10-R-0001 Draft CAAS IV Appendix B - CDRL 21 Apr 10.docx DOCX document
Sol FA4890-10-R-0001 Draft CAAS IV Appendix D - TO Proposal Process 21 Apr 10.docx DOCX document
Draft CAAS IV Appendix D - TO Proposal Process 25 Mar 10.docx DOCX document
Show 40 more

Latest 50 of 89 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Capital Region (AFDW)

NATIONAL CAPTIAL REGION (AFDW) LABOR
LABOR CATEGORYMultiplier (Based on AFDW Historical Hours)Base 1 Jun 11-31 May 12Option Yr 1 1 Jun 12-31 May 13Option Year 2 1 Jun 13-31 May 14Option Year 3 1 Jun 14-31 May 15Option Year 4 1 Jun 15-31 May 16Ordering Period X 1 Jun 16-31 May 17Ordering Period Y 1 Jun 17-31 May 18Ordering Period Z 1 Jun 18-31 May 19Optional Extension 1 Jun - 30 Nov 19
Proposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotal
Program Manager53.38$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Project Manager25.80$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Technical Manager6.61$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
LAN Specialist – Level I4.13$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
LAN Specialist – Level II11.60$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Developer/Designer1.11$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Logistician0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Analyst Level I128.08$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Analyst Level II201.24$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Staff Analyst Level I3.60$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Staff Analyst Level II20.84$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Computer Systems Analyst Level I22.03$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Computer Systems Analyst Level II31.58$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Operations Research Analyst35.89$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Budget Analyst20.66$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Engineer179.19$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Draftsperson0.14$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Administrative Specialist10.77$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Instructor Level I1.52$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Instructor Level II1.34$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scientist9.34$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Contract Specialist1.87$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subject Matter Expert Level I141.71$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subject Matter Expert Level II87.54$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL LABOR$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
NATIONAL CAPITAL REGION (AFDW) OTHER DIRECT COSTS
LABOR CATEGORYMultiplierBase 1 Jun 11-31 May 12Option Yr 1 1 Jun 12-31 May 13Option Year 2 1 Jun 13-31 May 14Option Year 3 1 Jun 14-31 May 15Option Year 4 1 Jun 15-31 May 16Ordering Period X 1 Jun 16-31 May 17Ordering Period Y 1 Jun 17-31 May 18Ordering Period Z 1 Jun 18-31 May 19Optional Extension 1 Jun - 30 Nov 19
Proposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotal
Incidental Material Handling Rate (%)6,500$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00
Handling Rate % - Travel30,000$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00
TOTAL OTHER DIRECT COSTS$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00
NATIONAL CAPITAL REGION (AFDW) TOTALs
Base 1 Jun 11-31 May 12Option Yr 1 1 Jun 12-31 May 13Option Year 2 1 Jun 13-31 May 14Option Year 3 1 Jun 14-31 May 15Option Year 4 1 Jun 15-31 May 16Ordering Period X 1 Jun 16-31 May 17Ordering Period Y 1 Jun 17-31 May 18Ordering Period Z 1 Jun 18-31 May 19Optional Extension 1 Jun - 30 Nov 19
TOTAL$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00
TOTAL for NATIONAL CAPITAL REGION$117,000.00

&"Arial,Bold"&12CAAS IV PRICE PROPOSAL (NATIONAL CAPITAL REGION (AFDW))

Other US (ACC)

OTHER US (ACC) LABOR
LABOR CATEGORYMultiplier (Based on ACC Historical Hours)Base 1 Jun 11-31 May 12Option Yr 1 1 Jun 12-31 May 13Option Year 2 1 Jun 13-31 May 14Option Year 3 1 Jun 14-31 May 15Option Year 4 1 Jun 15-31 May 16Ordering Period X 1 Jun 16-31 May 17Ordering Period Y 1 Jun 17-31 May 18Ordering Period Z 1 Jun 18-31 May 19Optional Extension 1 Jun - 30 Nov 19
Proposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotal
Program Manager81.06$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Project Manager114.48$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Technical Manager103.54$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
LAN Specialist – Level I11.11$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
LAN Specialist – Level II11.11$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Developer/Designer2.64$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Logistician1.40$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Analyst Level I68.04$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Analyst Level II40.61$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Staff Analyst Level I55.75$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Staff Analyst Level II55.75$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Computer Systems Analyst Level I25.71$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Computer Systems Analyst Level II81.47$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Operations Research Analyst26.94$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Budget Analyst9.46$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Engineer48.59$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Draftsperson0.41$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Administrative Specialist6.21$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Instructor Level I9.61$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Instructor Level II69.70$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scientist4.89$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Contract Specialist0.72$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subject Matter Expert Level I85.41$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subject Matter Expert Level II85.41$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL LABOR$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
OTHER US (ACC) OTHER DIRECT COSTS
LABOR CATEGORYMultiplierBase 1 Jun 11-31 May 12Option Yr 1 1 Jun 12-31 May 13Option Year 2 1 Jun 13-31 May 14Option Year 3 1 Jun 14-31 May 15Option Year 4 1 Jun 15-31 May 16Ordering Period X 1 Jun 16-31 May 17Ordering Period Y 1 Jun 17-31 May 18Ordering Period Z 1 Jun 18-31 May 19Optional Extension 1 Jun - 30 Nov 19
Proposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotalProposed RateTotal
Incidental Material Handling Rate (%)6,500$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00
Handling Rate % - Travel30,000$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00
TOTAL OTHER DIRECT COSTS$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00
OTHER US (ACC) TOTALs
Base 1 Jun 11-31 May 12Option Yr 1 1 Jun 12-31 May 13Option Year 2 1 Jun 13-31 May 14Option Year 3 1 Jun 14-31 May 15Option Year 4 1 Jun 15-31 May 16Ordering Period X 1 Jun 16-31 May 17Ordering Period Y 1 Jun 17-31 May 18Ordering Period Z 1 Jun 18-31 May 19Optional Extension 1 Jun - 30 Nov 19
TOTAL$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00
TOTAL for OTHER US$117,000.00

&"Arial,Bold"&12CAAS IV PRICE PROPOSAL (NATIONAL CAPITAL REGION (AFDW))

TOTAL PRICE

TOTAL LABOR
LABOR CATEGORYBase 1 Jun 11-31 May 12Option Yr 1 1 Jun 12-31 May 13Option Year 2 1 Jun 13-31 May 14Option Year 3 1 Jun 14-31 May 15Option Year 4 1 Jun 15-31 May 16Ordering Period X 1 Jun 16-31 May 17Ordering Period Y 1 Jun 17-31 May 18Ordering Period Z 1 Jun 18-31 May 19Optional Extension 1 Jun - 30 Nov 19
Program Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Project Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Technical Manager$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
LAN Specialist – Level I$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
LAN Specialist – Level II$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Software Developer/Designer$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Logistician$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Analyst Level I$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Program Analyst Level II$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Staff Analyst Level I$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Staff Analyst Level II$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Computer Systems Analyst Level I$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Computer Systems Analyst Level II$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Operations Research Analyst$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Budget Analyst$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Engineer$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Draftsperson$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Administrative Specialist$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Instructor Level I$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Instructor Level II$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scientist$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Contract Specialist$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subject Matter Expert Level I$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subject Matter Expert Level II$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL LABOR$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL OTHER DIRECT COSTS
LABOR CATEGORYBase 1 Jun 11-31 May 12Option Yr 1 1 Jun 12-31 May 13Option Year 2 1 Jun 13-31 May 14Option Year 3 1 Jun 14-31 May 15Option Year 4 1 Jun 15-31 May 16Ordering Period X 1 Jun 16-31 May 17Ordering Period Y 1 Jun 17-31 May 18Ordering Period Z 1 Jun 18-31 May 19Optional Extension 1 Jun - 30 Nov 19
Incidental Material Handling Rate (%)$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00
Handling Rate % - Travel$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00$13,000.00
TOTAL OTHER DIRECT COSTS$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00
TOTAL PRICE
LABOR CATEGORYBase 1 Jun 11-31 May 12Option Yr 1 1 Jun 12-31 May 13Option Year 2 1 Jun 13-31 May 14Option Year 3 1 Jun 14-31 May 15Option Year 4 1 Jun 15-31 May 16Ordering Period X 1 Jun 16-31 May 17Ordering Period Y 1 Jun 17-31 May 18Ordering Period Z 1 Jun 18-31 May 19Optional Extension 1 Jun - 30 Nov 19
TOTAL$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00$26,000.00
TOTAL for OTHER US$234,000.00