Atch 1 LOSC Industry Day Agenda 16-17 August 21.pdf

PDF 108 KB Posted

Attached to
Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – DRAFT
Solicitation number
FA4610-21-R-0003
Issued by

About this file

This notice provides information for the upcoming Launch Operations Support Contract (LOSC) re-compete opportunity. The LOSC is a non-personal services contract to provide maintenance, modification, and modernization for aging facilities, property, and Western Range support equipment at Vandenberg Space Force Base to ensure successful performance during tests, operations, and launches. The incumbent is Call Henry, Inc. under contract FA4610-18-C-0005 expiring June 2022.

The draft RFP is seeking feedback by 19 July 2021. The final RFP will be issued on 5 October 2021 with proposals due 19 November 2021. Award is anticipated in August 2022 with a period of performance starting 1 October 2022. The NAICS code is 561210 with a $41.5 million size standard. The acquisition will be 100% set aside for small business. Services required include ensuring Real Property Installed Equipment and facilities are maintained and operationally ready to support the Department of Defense, National Aeronautics and Space Administration, and commercial customers.

View the file

Other files

File Type Posted
QAs_LOSC_ dRFP_Consolidated_20210921.pdf PDF
LOSC List of Industry Day Attendees.pdf PDF
LOSC Industry Day Agenda slides dtd 16Aug21.pptx PPTX presentation
Base Map Santa Maria Gate to Bldg 8500.PNG PNG image
Atch 1 LOSC Industry Daty Agenda 16-17 August 21 - updated.docx DOCX document
Industry Day General Information Memo.pdf PDF
Atch 2 Base Map Santa Maria Gate to the WROCC.pdf PDF
20210615 RFP FA461021R0003 Draft.pdf PDF
Attch 4 CDRL_A022_Accident Incident Report_8_Jun_21.docx DOCX document
Attch 8 WD 2015-5638 rev 11.pdf PDF
Attch 4 CDRL_A020_Contract Funds Status Report_8_Jun_21.docx DOCX document
Attch 2 - Appendix I - Glossary08Jun21.docx DOCX document
Attch 4 CDRL_A010_Daily Maintenance and Repair Schedule_8_Jun_21.docx DOCX document
Attch 11 Appendix B - Wage Rate Tables (2019-2024)_Redacted.pdf PDF
Attch 7 Davis Bacon WD CA20200018 (Rev 4).pdf PDF
Attch 4 CDRL_A008_P and E Responsibility List_8_Jun_21.docx DOCX document
Attch 4 LOSC_DID_Combined.pdf PDF
Attch 2 - Appendix B_Antenna Tower Responibility List_08Jun21.xlsx XLSX spreadsheet
Attch 11 DBA CA190014 Rev 3.pdf PDF
Attch 4 CDRL_A005_Fugitive Hydrocarbons Report_8_Jun_21.docx DOCX document
20210615 RFP FA461021R0003 Draft.pdf PDF
Attch 4 CDRL_A021_JOCAS Reports_8_Jun_21.docx DOCX document
Attch 4 CDRL_A013_Backflow Prevention Systems Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A015_Solid Waste Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A006_Technical Report Waster Water Discharge_8_Jun_21.docx DOCX document
Attch 4 CDRL_A009_Program Management Plan_8_Jun_21.docx DOCX document
Attch 2 - Appendix G_Environmental Specs_08Jun21.docx DOCX document
Attch 4 CDRL_A025_Generator Testing and Maint Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A016_HMMP Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A002_GFP Inventory Report_PKD_8_Jun_21.docx DOCX document
Attch 4 CDRL_A023_RCM Plan_8_Jun_21.docx DOCX document
Attch 12 WD CBA 2019-12949.pdf PDF
Attch 4 CDRL_A001_Corrosion Prevention and Control Plan_8_Jun_21.doc DOC document
Attch 10 WD 2015-5648 Rev 7.pdf PDF
Attch 2 - Appendix C_D_E_F_08Jun21.xlsx XLSX spreadsheet
Attch 4 CDRL_A003_Test Inspection Report_8_Jun_21.docx DOCX document
Attch 1 - PWS_LOSC Acquisition_08Jun21.pdf PDF
Attch L-5_LOSC Section L dtd 10Jun2021.pdf PDF
Attch 4 CDRL_A004_Power Plant Operation and Maintenance Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A019_Cost Peformance Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A026_System Safety Program Plan_8_Jun_21.docx DOCX document
Attch 13 - CRM template - Used for dRFP (questions-comments).xlsx XLSX spreadsheet
Attch 4 CDRL_A007_P and E Certification Report_8_Jun_21.docx DOCX document
Attch 2 - Appendix H_Acronyms and Abbreviations_08Jun21.docx DOCX document
Attch 4 CDRL_A017_Lead-Based Abatement Plan_8_Jun_21.docx DOCX document
Attch 4 CDRL_A018_Contract Work Breakdown Structure_8_Jun_21.docx DOCX document
Attch 4 CDRL_A012_Requisition Summary_8_Jun_21.docx DOCX document
Attch 9 WD 1986-0431 Rev 49.pdf PDF
Attch L-6_LOSC Section M dtd 10Jun2021.pdf PDF
Attch 4 CDRL_A011_Quality Management Plan_8_Jun_21.docx DOCX document
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 Industry Day General Information Memo

LOSC RECOMPETE INDUSTRY DAY AGENDA

DAY 1 - 16 August 21

0800-0845 – Check-in at Visitors Center located just outside the Santa Maria Gate. Upon receipt of base pass contractors will proceed to Building 7025 (see attached map).

0900 – 1030 – Building 7025, WROCC Theater: PM/30 CONS provides overview briefing of the LOSC re-compete contract.

1030 – 1130 – Site Visit of B7025/B7000. (Walk Down)

1130 – 1230 – Scheduled lunch at Breakers; a Government chaperone will be required; a bus will be used to transport those interested to and from lunch.

1230 – 1400 – Site Visit of SLC-8 and the South Vandenberg Power Plant. Transportation will be provided for site visits.

1400 – Industry Day complete

DAY 2 – 17 Aug 21

0900 – 1600 B8500 Rm 210 – One-on-One 20 min discussions with interested vendors.

Base access: Contractors will be required to provide ID, proof of car insurance, and vehicle registration in order to obtain a base pass at visitor control center.

Directions to building 7025: Proceed through the Santa Maria Gate; continue down California for approximately 1 mile; take a right on 10th street and proceed to the parking lot. There will be a sign in front of building 7025.

File details come from the government source that posted it. Updated .