This document provides details regarding a draft request for proposal for the Launch Operations Support Contract. The solicitation involves providing maintenance, modification, and modernization services for aging facilities, property, and equipment to support launch operations at Vandenberg Space Force Base. Key information includes that the requirement is a 100% small business set-aside with a NAICS code of 561210. The incumbent contractor is Call Henry, Inc. under contract number FA4610-18-C-0005. The draft RFP and a performance work statement are attached as are documents relating to collective bargaining agreements, Davis Bacon Act wage determinations, and a comment resolution matrix for industry to provide feedback. Responses to the draft RFP are due by July 19, 2021. The anticipated award date is August 2022 with a period of performance beginning October 2022. Relevant agencies include the Department of the Air Force Space Command.

View the file

Other files for this federal contract opportunity

Other files attached to Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – DRAFT, newest first.
File Type Posted
LOSC List of Industry Day Attendees.pdf PDF
QAs_LOSC_ dRFP_Consolidated_20210921.pdf PDF
LOSC Industry Day Agenda slides dtd 16Aug21.pptx PPTX presentation
Base Map Santa Maria Gate to Bldg 8500.PNG PNG image
Atch 1 LOSC Industry Daty Agenda 16-17 August 21 - updated.docx DOCX document
Industry Day General Information Memo.pdf PDF
Atch 1 LOSC Industry Day Agenda 16-17 August 21.pdf PDF
Atch 2 Base Map Santa Maria Gate to the WROCC.pdf PDF
Attch 13 - CRM template - Used for dRFP (questions-comments).xlsx XLSX spreadsheet
Attch 10 WD 2015-5648 Rev 7.pdf PDF
Attch 11 DBA CA190014 Rev 3.pdf PDF
Attch L-5_LOSC Section L dtd 10Jun2021.pdf PDF
Attch 4 CDRL_A023_RCM Plan_8_Jun_21.docx DOCX document
Attch 4 CDRL_A020_Contract Funds Status Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A001_Corrosion Prevention and Control Plan_8_Jun_21.doc DOC document
Attch 4 CDRL_A016_HMMP Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A009_Program Management Plan_8_Jun_21.docx DOCX document
Attch 4 CDRL_A004_Power Plant Operation and Maintenance Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A002_GFP Inventory Report_PKD_8_Jun_21.docx DOCX document
20210615 RFP FA461021R0003 Draft.pdf PDF
Attch 1 - PWS_LOSC Acquisition_08Jun21.pdf PDF
Attch 8 WD 2015-5638 rev 11.pdf PDF
Attch 4 LOSC_DID_Combined.pdf PDF
Attch 4 CDRL_A025_Generator Testing and Maint Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A026_System Safety Program Plan_8_Jun_21.docx DOCX document
Attch 4 CDRL_A018_Contract Work Breakdown Structure_8_Jun_21.docx DOCX document
Attch 4 CDRL_A012_Requisition Summary_8_Jun_21.docx DOCX document
Attch 4 CDRL_A003_Test Inspection Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A005_Fugitive Hydrocarbons Report_8_Jun_21.docx DOCX document
Attch 2 - Appendix B_Antenna Tower Responibility List_08Jun21.xlsx XLSX spreadsheet
Attch 2 - Appendix C_D_E_F_08Jun21.xlsx XLSX spreadsheet
Attch 2 - Appendix A_Facility Property and Equipment Responibility List_08Jun21.xlsx XLSX spreadsheet
Attch 9 WD 1986-0431 Rev 49.pdf PDF
Attch 11 CHI 2019-2024 CBA_Redacted_w_Appendix A.pdf PDF
Attch L-6_LOSC Section M dtd 10Jun2021.pdf PDF
Attch 4 CDRL_A024_Work Order Status Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A022_Accident Incident Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A014_Cathodic Protection Booklet_8_Jun_21.docx DOCX document
Attch 4 CDRL_A011_Quality Management Plan_8_Jun_21.docx DOCX document
Attch 2 - Appendix I - Glossary08Jun21.docx DOCX document
Attch 4 CDRL_A008_P and E Responsibility List_8_Jun_21.docx DOCX document
Attch 4 CDRL_A007_P and E Certification Report_8_Jun_21.docx DOCX document
Attch 7 Davis Bacon WD CA20200018 (Rev 4).pdf PDF
Attch 11 Appendix B - Wage Rate Tables (2019-2024)_Redacted.pdf PDF
Attch 4 CDRL_A021_JOCAS Reports_8_Jun_21.docx DOCX document
Attch 4 CDRL_A019_Cost Peformance Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A017_Lead-Based Abatement Plan_8_Jun_21.docx DOCX document
Attch 4 CDRL_A015_Solid Waste Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A013_Backflow Prevention Systems Report_8_Jun_21.docx DOCX document
Attch 4 CDRL_A006_Technical Report Waster Water Discharge_8_Jun_21.docx DOCX document
Show all 50

Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – DRAFT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4610-18-C-0005

Attachment 9

ATTACHMENT 9

WAGE DETERMINATION

CBA 2019-12949

FOR

LAUNCH OPERATIONS SUPPORT CONTRACT

(LOSC)

30TH SPACE WING - VANDENBERG AFB

THIS ATTACHMENT INCLUDING THE

TITLE PAGE CONSISTS OF 2 PAGES

11/19/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/cba/agreement/66297/document 1/1

REGISTER OF WAGE DETERMINATION UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT |EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary | WAGE AND HOUR DIVISION of Labor | WASHINGTON D.C. 20210

| Wage Determination No.: CBA-2019-12949

Diane Koplewski Division of | Revision No.: 0

Director Wage Determinations| Date Of Last Revision: 11/19/2019

State: California

Area: Santa Barbara

Employed on FA4610 30 CONS PK contract for Employed on 30th Contracting Squadron contract for Employed on Air Force contract to maintain launch facilities, provide corrosion control, sustaining engineering, maintenance and repair, and minor facility alteration...

Collective Bargaining Agreement between contractor: Call Henry, Inc., and union: International Brotherhood of Electrical Workers (IBEW) Local 413, effective 10/01/2019 through 06/30/2024.

In accordance with Section 2(a) and 4(c) of the Service Contract Act, as amended, employees employed by the contractor(s) in performing services covered by the

Collective Bargaining Agreement(s) are to be paid wage rates and fringe benefits set forth in the current collective bargaining agreement and modified extension agreement(s).

File details come from the government source that posted it. Updated .