This document provides questions and answers related to an Air Force operational commercial solutions opening solicitation for a wet wing defueling system. The solicitation seeks proposals for a modular wet wing defueling system to service C-130 and C-17 aircraft with 4-inch male cam-lock and SPR connections. The system must meet filtration standards in T.O. 42B1-1 and include two static reels with 75 feet of plastic-coated grounding cable and clamps. It must also have upstream and downstream sample ports per UFC 3-460-01. Additive injection and pump requirements are not applicable as separate systems will be utilized if needed. Grounding must follow T.O. 00-25-172, including one bonding and one grounding reel with grounding rod.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Air Force Operational Commercial Solutions Opening
FA4484-20-S-C002
Amendment A00003 Questions & Answers AOI 009 27 July 2020
Q: Provide interface requirements for Wet Wing Defuel from C-130 and C-17. Note: TLC typically supply their commercial space launch clients with modular end-connections, so they are able to adapt and exchange fittings as needed.
A: 4” male Cam-lock and Single Point Pressure Fuel Servicing Adapter (SPR) connection (Adding both will provide ability to receive from FARP/WWD or commercial) IAW T.O. 37A-1-101, Para 4.1.15
Q: Provide additive injection requirements in the event additives are needed (e.g., contracted fuel) to incorporate into design.
A: Separate system will be utilized and determined in the pre-planning stage if needed (Mendez Cart or dope procedures) N/A
Q: Provide fuel filter requirements to incorporate into design.
A: EI 1581, 6th Edition filtration standards required IAW T.O. 42B1-1, Para 3.4 (3)
Q: Assess Diesel America West DPL100-3MFC pump/performance curve to determine whether pump meets pressure control requirements. If not, provide pump/PSI regulation requirements to incorporate into design.
A: Need to know primary pressure relief/bypass of pump (not specified on pump spec sheet) N/A
Q: Provide any specific grounding requirements to incorporate into design.
A: Requires two (2) Static Reels, spring rewind w/75 ft. of plastic-coated cable w/military-style ground clamp (1-bonding; 1-grounding with grounding rod) IAW T.O. 00-25-172, Para 2.12
Q: Provide sampling port requirements to incorporate into design.
A: Requires Gammon type sample ports plumbed downstream and upstream of filter separator. IAW UFC 3-460-01, Para 7-5 (l)