This document contains a request for information (RFI) regarding a federal contract for repair of fuel systems generators. The RFI pertains to contract number XDAT 14-1031 for repair of fuel systems generators and concerns wire designations between generators and switchgear. The contractor submitted a question about ensuring all feeders are 800-Y wired between the generator and triple switch switchgear. Government reviewers provided responses and recommendations to the question posed.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
REQUEST FOR INFORMATION
DATE
ACTIVITY ID
CONTRACT TITLE
CONTRACT NO
RFI NO
RFI SUBJECT
DWG NO
DWG DETAIL
DWG SHEET NO
SPEC SECTION
SPEC PARAGRAPH
SPEC PAGE NO
RFI PRIORITY?
POTENTIAL TIME/COST?
SCHEDULE REFERENCED?
CRITICAL PATH?
4296/2C (9/98)
SHEET
of
CONTRACTOR QUESTION AND PROPOSED SOLUTION
RFI QUESTION/ISSUE:
CONTRACTOR PROPOSED SOLUTION:
DATE
CONTRACTOR/PROJECT MANAGER
NOTE: If the determination of this RFI is "Answered - No Cost" then this reply is given with the expressed understanding that it does not constitute a basis for any change in the amount or time of subject contract. Information provided in this response does not authorize work not currently included in the contract. If determination of this RFI is "Answered - Pending PCO" then this response may require a change to the contract.
ANSWERS AND COMMENTS
RFI REASON CODE
RFI ACTION
COMMENTS FOR DETAILED REVIEWER:
DETAILED REVIEWER 1 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 1 NAME/SIGNATURE
TITLE
RESPONSE DATE
DETAILED REVIEWER 2 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 2 NAME/SIGNATURE
TITLE
RESPONSE DATE
RFI RESPONSE:
DATE
GOVERNMENT CONSTRUCTION MANAGER
8.0.1291.1.339988.308172
| DateTimeField2: 2021-02-26 |
| activityID: |
| contractTitle: REPAIR FUEL SYSTEMS GENERATORS |
| Enter Cnt # Here: XDAT 14-1031 |
| rfiNo: Pre-Bid 04 |
| rfiSubject: B1041 WIRE DESIGNATION |
| dwgNo: |
| dwgDetail: |
| dwSheetNo: |
| specSection: |
| specParagraph: |
| specPageNo: |
| : |
| PageNumber: |
| TextField: For B1041, sheet E2.1 shows the wire designation as 1000-Y, but sheet E0.4 shows those same wire designations as 800-Y. Which wire designation is to be used? |
| TextField: |
| TextField: All feeders should be 800-Y between generator and triple switch switchgear. |
| SignatureField1: |
| DateTimeField1: 2021-02-26 |
| rfiReason: |
| SignatureField3: |
| TextField1: |
| SignatureField2: |
File details come from the government source that posted it. Updated .