Attach 6a - Bid Schedule B1041.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Repair Fuel System Generators Federal contract opportunity
- Solicitation number
- FA442721R0012
About this file
This document contains a bid schedule and statement of work for a federal contract opportunity to repair fuel system generators at Travis Air Force Base in California. The contractor shall provide all materials, labor, supervision and equipment to complete the repairs, including sawcutting and removing hardscape, pouring a new concrete equipment pad, electrical demolition and installation work, generator and transfer switchgear replacement, and commissioning and testing services. A mandatory site visit will be held on February 23, 2021, with RSVPs due by February 22. Attendees must provide identification and comply with base security and COVID-19 protocols. The solicitation was issued by the Department of the Air Force Air Mobility Command.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 FOR OFFICIAL USE ONLY Bid Schedule Repair Fuel System Generator, B1041 Travis AFB CARepair Fuel System Generator, B1041 Travis AFB CA
Description Quantity Unit Line Total
Div 2 - Existing Conditions
| Sawcut hardscape | lf |
| Remove hardscape | sf |
Div 3 - Concrete
Concrete Equipment Pad, 17" thick sf
Div 9 - Finishes
| Labor to provide patchwork and paint associated with electrical upgrades | hr |
| Materials for patchwork and paint | ls |
Div 26 - Electrical
| Selective Demolition | |
| Remove Generator and transfer switchgear | ea |
| Remove existing electrical ductbank | lf |
| Safe off | loc |
| Misc selective demolition | hr |
| Service and Distribution | |
| Generator, 450 kW | ea |
| Generator enclosure | ea |
| Transfer switchgear, 1200 amp | ea |
| New electrical ductbank | lf |
| ESL triple switch | ea |
| Grounding connection | ea |
| Remote annunciator panel | ea |
| Commissioning | hr |
| Testing | hr |
| Metering | ls |
| Subtotal | |
| General Conditions | % |
| Subtotal | |
| Overhead | % |
| Subtotal | |
| Profit | % |
| Subtotal | |
| Bonds and Insurance | % |
TOTAL CONSTRUCTION COST