This document contains a submittal register and specifications for a federal contract opportunity to repair fuel systems and generators. The contractor shall provide all materials, labor, supervision and equipment to complete repairs of fuel systems and generators in accordance with the specifications. A mandatory site visit is scheduled for February 23, 2021 at 9:00AM PST to be hosted by the Department of the Air Force Air Mobility Command. Attendees must RSVP by February 22 and provide identification information to receive base access for the site visit, with no more than two individuals allowed per company. The submittal register outlines over 100 submittal items the contractor must provide across over 30 specification sections relating to the repairs.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES
Repair Fuel System Generators B1041
01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 GList of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.2 GProgress and Completion
Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals
3.4.1 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 45 00.10 20 SD-01 Preconstruction Submittals
1.6 GQC Plan
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
GTraffic Control Plan 01 74 19 SD-01 Preconstruction Submittals
1.3 GWaste Management Plan
01 78 00 SD-10 Operation and Maintenance
Data
3.2 GOperation and Maintenance
Manuals SD-11 Closeout Submittals
3.1 GAs-Built Drawings
01 78 23 SD-10 Operation and Maintenance
Data GO&M Database
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES
01 78 23 3.1.1 GTraining Outline SD-11 Closeout Submittals
3.1.3 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.5 Gnotification
1.8 GExisting Conditions
03 30 53 SD-03 Product Data 3.1.3.3Batching and Mixing Equipment 3.2Conveying and Placing Concrete 2.1.4Formwork 2.2Ready-Mix Concrete 2.2Mix Design Data
SD-06 Test Reports 1.3.3Concrete Mixture Proportions 2.1.1Cementitious Materials 2.2Bill of Lading
26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture
Lists SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.3 GWire and Cable
3.2.1.8 GSplices and Connectors
2.1.4 GSwitches
2.1.5 GReceptacles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES
26 05 00.00 40 2.1.6 GOutlet Boxes, Pull Boxes and Junction Boxes
2.1.8 GDry-Type Distribution
Transformers
SD-06 Test Reports
3.3 GContinuity Test
3.3 GPhase-Rotation Tests
3.3 GInsulation Resistance Test
SD-08 Manufacturer�s Instructions 3.1Manufacturer's Instructions
26 05 48.00 10 SD-02 Shop Drawings 1.3Equipment Requirements
SD-03 Product Data
1.3 GEquipment Requirements
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure 26 20 00 SD-02 Shop Drawings
3.1.7.1 GMarking Strips
SD-03 Product Data
2.10 GMeter Base Only
2.11 GSurge Protective Devices
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 7 PAGES
26 20 00 3.5.2 G600-volt wiring test
3.5.3 GGrounding system test
SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
26 23 00 SD-02 Shop Drawings
1.5.2 GSwitchgear Drawings
SD-03 Product Data
2.2 GSwitchgear
SD-06 Test Reports
2.5.2 GSwitchgear Design Tests
2.5.3 GSwitchgear Production Tests
3.5.1 GAcceptance Checks and Tests
SD-10 Operation and Maintenance Data
1.6.1 GSwitchgear Operation and
Maintenance
SD-11 Closeout Submittals
1.6.2 GAssembled Operation and
Maintenance Manuals
2.5.1 GEquipment Test Schedule
2.8 GService Entrance Available Fault
Current Label 26 28 01.00 10 SD-03 Product Data
2.4Fault Current Analysis
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 7 PAGES
26 28 01.00 10 2.4Protective Device Coordination Study
2.1Equipment 1.4.1System Coordinator 3.2Installation
SD-06 Test Reports 3.3Field Testing
SD-07 Certificates 1.6Devices and Equipment
26 32 15.00 10 SD-02 Shop Drawings
1.3.7 GDetailed Drawings
3.9 GAcceptance
SD-03 Product Data 2.1.1Engine-Generator Parameter
Schedule 2.8.2Heat Exchanger 2.15Generator 2.5Manufacturer's Catalog 1.3.2Site Welding 1.5Spare Parts 3.6Onsite Training 2.1.7Vibration-Isolation
3.8 GPosted Data and Instructions
1.3.5Experience 1.3.6Field Engineer 3.2General Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 7 PAGES
26 32 15.00 10 SD-05 Design Data 2.15Performance Criteria
2.9 GSound Limitations
2.6.4Integral Main Fuel Storage Tank 3.5.1.2Power Factor 2.19.5Time-Delay on Alarms 2.13.3.2Battery Charger
SD-06 Test Reports 2.27Factory Inspection and Tests 2.27.2Factory Tests
3.5 GOnsite Inspection and Tests
SD-07 Certificates 2.8Cooling System 2.8Cooling System 2.1.7Vibration Isolation 2.27.2Prototype Test 2.1.5Reliability and Durability 2.12Emissions 2.9Sound Limitations 3.1Site Visit 2.15.1Current Balance 2.4Materials and Equipment 3.5.3Inspections
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 7 PAGES
26 32 15.00 10 3.6 GOperation and Maintenance Manuals
3.6 GMaintenance Procedures
2.14Special Tools 2.7.2Filters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .