Repair Fuel System Generators

Closed Solicitation Posted

Solicitation number
FA442721R0012
Agency
Air Mobility Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
221112 Fossil Fuel Electric Power Generation
PSC
Z2NA Repair Or Alteration Of Fuel Supply Facilities
Place of performance
Travis Afb Ca 94535 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Air Mobility Command seeks to engage a contractor to provide all materials, labor, supervision and equipment to complete repairs to fuel system generators at Travis Air Force Base in California. The contractor must attend a mandatory site visit on February 23, 2021 and comply with base security screening and COVID-19 protocols. Proposals are due by March 24, 2021 and will be evaluated based on technical qualifications and past performance. The contractor shall complete all repairs in accordance with specifications outlined in the Statement of Work.

This opportunity is set aside for total small business and involves NAICS codes 238210 and PSC codes R499 and R408. Repairs will take place at Travis Air Force Base and include replacing two aging 300kW generators with new 450kW diesel backup generators, transfer switchgear, and associated electrical components. The estimated value ranges from $1-5 million to be awarded as a firm fixed price contract to one contractor performing all work within 180 days of notice to proceed.

Notice text

3 versions

Update #3 · Latest ·

The contractor shall provide all materials, labor, supervision and equipment to complete Repair Fuel System Generators.  All work shall conform to specifications outlined in the Statement of Work.

A site visit is scheduled for 23 February 2021 at 9:00AM, PST.  All indiviiduals attending the site visit must RSVP with SrA Ronald Aquino at ronald_wendell.aquino@us.af.mil no later than 22 February at 4:00PM, PST.  Requests made afte rthis date and time shall not be accepted.  Attendees must porvide full name and date of birth in order to receive base access passes which will be picked up at the base Visitor Center the morning of the site visit.  No more than two (2) individuals per company shall be allowed on the site visit.

 All site visit attendees MUST comply with the Read ID Act and Covid-19 protcols require all individuals to wear a mask/ face covering.  Individuals that do not comply with the Real ID Act or Covid-19 protocols shall not be authorized on base. 

AS THE NEW SOLICITATION RESPONSE DATE IS 24 MARCH 2021 @ 1200PM, PST THE DEADLINE FOR ALL QUESTIONS TO BE SUBMITTED IS 19 MARCH 2021 @ 3:00PM, PST.

Update #2 ·

The contractor shall provide all materials, labor, supervision and equipment to complete Repair Fuel System Generators.  All work shall conform to specifications outlined in the Statement of Work.

A site visit is scheduled for 23 February 2021 at 9:00AM, PST.  All indiviiduals attending the site visit must RSVP with SrA Ronald Aquino at ronald_wendell.aquino@us.af.mil no later than 22 February at 4:00PM, PST.  Requests made afte rthis date and time shall not be accepted.  Attendees must porvide full name and date of birth in order to receive base access passes which will be picked up at the base Visitor Center the morning of the site visit.  No more than two (2) individuals per company shall be allowed on the site visit.

 All site visit attendees MUST comply with the Read ID Act and Covid-19 protcols require all individuals to wear a mask/ face covering.  Individuals that do not comply with the Real ID Act or Covid-19 protocols shall not be authorized on base. 

Update #1 ·

The contractor shalol provide all materials, labor, supervision and equipment to complete Repair Fuel System Generators.  All work shall conform to specifications outlined in the Statement of Work.

A site visit is scheduled for 23 February 2021 at 9:00AM, PST.  All indiviiduals attending the site visit must RSVP with SrA Ronald Aquino at ronald_wendell.aquino@us.af.mil no later than 22 February at 4:00PM, PST.  Requests made afte rthis date and time shall not be accepted.  Attendees must porvide full name and date of birth in order to receive base access passes which will be picked up at the base Visitor Center the morning of the site visit.  No more than two (2) individuals per company shall be allowed on the site visit.

 All site visit attendees MUST comply with the Read ID Act and Covid-19 protcols require all individuals to wear a mask/ face covering.  Individuals that do not comply with the Real ID Act or Covid-19 protocols shall not be authorized on base. 

Attachments

Files attached to this notice, newest first
File Type Posted
(ANS) XDAT 14-1031 PRE-BID RFI 13 -Switchgear.pdf PDF
(ANS) XDAT 14-1031 PRE-BID RFI 12 -Follow Up RFI_Battery.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 05 B1733 Wire Designation.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 04 B1041 Wire Designation.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 09 Triple Switch Elevations.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 06 Specified Generator Manufacturer (2.0).pdf PDF
(ANS) XDAT 14-1031 PRE-BID 08 Contractors Responsibility in Demolished Equipment.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 02 Drivers Training_Driving Privileges_Security Escorts.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 01 Fuel Tank Responsibility.pdf PDF
(ANS) XDAT 14-11031 PRE-BID 03 Multiple Conduits on exterior.pdf PDF
Questions and Answers - Round 3.pdf PDF
Solicitation Amendment FA442721R00120001 SF 30.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 06 Specified Generator Manufacturer.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 07 Requirements for Utilizing Crane.pdf PDF
XDAT 14-1031 PRE-BID RFI 11 Removal of Fuel.pdf PDF
XDAT 14-1031 PRE-BID RFI 10 Demolished Items.pdf PDF
1 - B - 1 PUMPHOUSE FLOOR PLAN AND DETAILS.pdf PDF
7 - B-7 - CONNECTION DETAILS.pdf PDF
2 - B-2 - PUMPHOUSE BUILDING PLAN.pdf PDF
33 - T-2 - APPURTENANCES AND FITTINGS.pdf PDF
5 - B-5 - PUMPHOUSE BUILDING SECTION.pdf PDF
29 - T-1 - FOUNDATION DETAILS.pdf PDF
48 - ED-2 - TANK DETAILS.pdf PDF
6 - B-6 - PUMPHOUSE ELEVATIONS.pdf PDF
3 - B-3 - PUMPHOUSE BUILDING SECTION.pdf PDF
43 - EU-1 - ELECTRICAL SITE PLAN AREA A.pdf PDF
20 - S-1 - VALVE VAULT DETAILS.pdf PDF
0 - C - 1 EXISTING SITE CONDITIONS AREA A.pdf PDF
4 - B-4 - PUMPHOUSE BUILDING SECTION.pdf PDF
8 - B-8 - CONNECTION DETAILS.pdf PDF
Attendance Sheet - Site Visit - Signed.pdf PDF
Questions and Answers - Round 1.pdf PDF
Attach 4 - B1733 - Final Drawings.pdf PDF
Attach 3 - B1733 - Final Specifications.pdf PDF
Attach 5 - Submittal Register Generator B1733.pdf PDF
Attach 10 - Past Performance Questionnaire.docx DOCX document
Attach 3a - B1041 Final Specifications.pdf PDF
Attach 11 - Contract Security Clause 29 Apr 19.pdf PDF
Solicitation - FA442721R0012.pdf PDF
Attach 4a - B1041 Final Drawings.pdf PDF
Attach 2 - B1733 Final Design Analysis Report.pdf PDF
Attach 2a. - B1041 Final Design Analysis Report.pdf PDF
Attach 8 - WD CA20200007 27 November 2020.pdf PDF
Attach 5a - Submittal Register Generator B1041.pdf PDF
Attach 7 - Travis Facilities Excellence Guide.pdf PDF
Attach 9 - Travis Specifications Section 01000.pdf PDF
Attach 1 - B1733 SOW Dated 23 Mar 2020.pdf PDF
Attach 6a - Bid Schedule B1041.xlsx XLSX spreadsheet
Attach 6 - Bid Schedule B1733.xlsx XLSX spreadsheet
Attach 1a - B1041 SOW Dated 23 Mar 2020.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity