Attach 2a. - B1041 Final Design Analysis Report.pdf

PDF 2 MB Posted

Attached to
Repair Fuel System Generators Federal contract opportunity
Solicitation number
FA442721R0012
Issued by
Department of the Air Force Air Mobility Command

About this file

This document includes a basis of design report and drawings for the replacement of fuel system generators at Travis Air Force Base, along with a related federal contract opportunity solicitation. The report provides details on the assessment of the existing generators and electrical systems, which are over 20 years old and in poor condition. The scope of work involves removing the old generators and installing two new 450kW diesel backup generators on concrete pads, along with new manual transfer switchgear. Fault analysis, coordination studies, and arc flash studies will be performed by the contractor. The related solicitation is seeking proposals to complete the repair of the fuel system generators in accordance with the specifications. A mandatory site visit is scheduled for February 23, 2021, with RSVPs due by February 22. Proposals are due by the date specified in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Fuel System Generators, newest first.
File Type Posted
(ANS) XDAT 14-1031 PRE-BID RFI 13 -Switchgear.pdf PDF
(ANS) XDAT 14-1031 PRE-BID RFI 12 -Follow Up RFI_Battery.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 04 B1041 Wire Designation.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 05 B1733 Wire Designation.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 09 Triple Switch Elevations.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 06 Specified Generator Manufacturer (2.0).pdf PDF
(ANS) XDAT 14-11031 PRE-BID 03 Multiple Conduits on exterior.pdf PDF
Questions and Answers - Round 3.pdf PDF
Solicitation Amendment FA442721R00120001 SF 30.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 01 Fuel Tank Responsibility.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 08 Contractors Responsibility in Demolished Equipment.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 02 Drivers Training_Driving Privileges_Security Escorts.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 06 Specified Generator Manufacturer.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 07 Requirements for Utilizing Crane.pdf PDF
XDAT 14-1031 PRE-BID RFI 11 Removal of Fuel.pdf PDF
XDAT 14-1031 PRE-BID RFI 10 Demolished Items.pdf PDF
48 - ED-2 - TANK DETAILS.pdf PDF
6 - B-6 - PUMPHOUSE ELEVATIONS.pdf PDF
3 - B-3 - PUMPHOUSE BUILDING SECTION.pdf PDF
33 - T-2 - APPURTENANCES AND FITTINGS.pdf PDF
5 - B-5 - PUMPHOUSE BUILDING SECTION.pdf PDF
29 - T-1 - FOUNDATION DETAILS.pdf PDF
1 - B - 1 PUMPHOUSE FLOOR PLAN AND DETAILS.pdf PDF
7 - B-7 - CONNECTION DETAILS.pdf PDF
2 - B-2 - PUMPHOUSE BUILDING PLAN.pdf PDF
43 - EU-1 - ELECTRICAL SITE PLAN AREA A.pdf PDF
20 - S-1 - VALVE VAULT DETAILS.pdf PDF
0 - C - 1 EXISTING SITE CONDITIONS AREA A.pdf PDF
4 - B-4 - PUMPHOUSE BUILDING SECTION.pdf PDF
8 - B-8 - CONNECTION DETAILS.pdf PDF
Questions and Answers - Round 2.pdf PDF
Attendance Sheet - Site Visit - Signed.pdf PDF
Questions and Answers - Round 1.pdf PDF
Attach 4a - B1041 Final Drawings.pdf PDF
Attach 2 - B1733 Final Design Analysis Report.pdf PDF
Attach 8 - WD CA20200007 27 November 2020.pdf PDF
Attach 5a - Submittal Register Generator B1041.pdf PDF
Attach 3a - B1041 Final Specifications.pdf PDF
Attach 11 - Contract Security Clause 29 Apr 19.pdf PDF
Solicitation - FA442721R0012.pdf PDF
Attach 4 - B1733 - Final Drawings.pdf PDF
Attach 3 - B1733 - Final Specifications.pdf PDF
Attach 5 - Submittal Register Generator B1733.pdf PDF
Attach 10 - Past Performance Questionnaire.docx DOCX document
Attach 7 - Travis Facilities Excellence Guide.pdf PDF
Attach 9 - Travis Specifications Section 01000.pdf PDF
Attach 1 - B1733 SOW Dated 23 Mar 2020.pdf PDF
Attach 6a - Bid Schedule B1041.xlsx XLSX spreadsheet
Attach 6 - Bid Schedule B1733.xlsx XLSX spreadsheet
Attach 1a - B1041 SOW Dated 23 Mar 2020.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Fuel System Generators B1041 – Design XDAT 14-1031

Design Analysis, Equipment Cut Sheets

Final Submittal – March 27, 2019

Prepared For:

Travis Air Force Base, California

Prepared By:

2020 E. 1st Street Suite 525 Santa Ana, CA 92705

714.689.0298 Ι www.DevelopmentOne.net

Repair Fuel System Generators B1041 – Design XDAT 14-1031

Final Submittal – March 27, 2019

Tab 1

Under Separate Cover

Design Analysis

Specifications

Equipment Cut

Sheets

Tab 3

Design Analysis – 1

Repair Fuel System Generators - B1041 Final Design Submittal

2 | P a g e

1.0

1.1

1.2

2.0

INTRODUCTION

The existing generators are located at Buildings B1041 at Travis AFB, CA. The generators are used as backup power for POL storage and dispensing facilities. The generators are mission critical and required to ensure continuation of mission capabilities during any planned or unplanned electrical outages. The current equipment at 1041 facility is over 20 years old and are beyond their expected useful life cycle. The existing generator is currently out of commission and does not meet current EPA and AQMD emissions standards. The scope for this project is to design replacement generator and manual transfer switch that are properly sized to support the loads of the building, which include three 125 HP pumping motors along with building and ancillary loads.

This basis of design report will describe where certain assumptions have been made, so that if additional information becomes available, the data can be re-incorporated to achieve the most accurate results possible. The salient features of the assessment of the existing conditions are to the type of electrical equipment, the age of each major system components, the current health of that component, and recommendations for replacement of the existing generators and associated electrical equipment.

ELECTRICAL DESIGN OBJECTIVE

The overall project includes the following scope:

1. Removal of existing generators and transfer switchgear

2. Installation of one new 450kW/562kVA diesel backup generators on new concrete pad

3. Installation of one new manual transfer switchgear

3.0

4.0

SITE VERIFICATION

Faculty from Design West Engineering completed a survey of the existing generator and building electrical system, and collected equipment information on the existing system based on visible name plate information and visual inspections.

The collected information will be incorporated into the 100% design. As-builts could not be obtained for the existing systems.

ASSESSMENT OF EXISTING CONDITIONS

Currently, B1041 consist of a 1200A 480V 3ph 4w electrical service each. An existing 300kW generator is connected through a manual transfer switchboard with kurt-key interlocked circuit breakers at each location. The switchboard feeds a 1200A MCC which feeds the primary POL pumps and contains separate breakers that feed ancillary loads to support the building and generator circuits.

The generators are currently and disconnected from the system and appear to be in poor condition. The manual transfer switchgear appears to be in adequate condition, however, due to the age of the equipment, they will be replaced. The existing conduits from the generator to the building switchgear will be reused where feasible while new conductors will be installed in the existing conduits.

3 | P a g e

5.0

6.0

DEMOLITION

The existing decommissioned generator will be demolished along with the existing above ground fuel tank at B1041. The existing main service/manual transfer switchgear within the buildings that are being replaced will be demolished. All obsolete electrical distribution system equipment/components will be indicated to be removed, and not abandoned in place. Obsolete conductors will be indicated to be removed back to source.

Conduits will be indicated to be cut and capped for future use where appropriate.

The Government indicated downtime of the electrical service for replacement of the service switchgear is acceptable but must be scheduled in advance. The design will specify a minimum of 14-day notice be provided for any scheduled outages.

NEW POWER DISTRIBUTION COMPONENTS

Generators: A new backup generator set will be designed to support all critical loads.

The generator is classified as POL (petroleum, oil, & lubricants) /Fuels. The role of the generator is to provide backup power when commercial power is turned off or fails.

Based on initial sizing calculations, in order to support a minimum of 50% load required by Air Force Instruction (AFI) 32-1062, 2.3.1.4, along with motor starting inrush current, the new generators will be sized to 450kW/562kVA with 480V 3ph 4w output and a 800A 100% rated adjustable trip output circuit breaker. The generators will be housed in a level 2 sound attenuated enclosure to mitigate sound concerns and will not exceed 72 dB at 23’ away from the generator. The generators will be designed with a load bank and portable generator connections at both locations. Fuel supply will be 24 hours minimum at full rated load and shall be belly tank type, not external fuel tank. Generator fuel calculations have been provided on plans and indicate that a 1000 gal. tank will provide required run-time. The new generators will conform to all codes referenced in SOW and all applicable building codes along with EPA and AQMD emissions requirements.

The generator will be located away from the buildings on a new concrete foundation. All generator exhaust will be directed away from adjacent building openings and will be a minimum of 10’ away from any building openings. The generator enclosure will be completely enclosed.

Manual Transfer Switchgear: A new 1200A 480V 3ph 4W switchboard will be provided and connected to new generators and existing utility feed to provide manual transfer between utility and generator. Switchboard will be provided with copper bus, draw-out type thermal-magnetic molded circuit breakers with adjustable trip settings (LSIG) . A manual interlock transfer system will be provided for switching between utility and generator power as required by ETL 13.3.4.

Triple Switch: A new interconnection switch will be provided at each location to allow for load bank testing and portable generator connections as required by Air Force Instruction (AFI) 32-1062, 6.5. The switch consists of three interlocked breakers to isolate the permanent standby generator circuit from the service during load bank testing. The switch also provides a means to quickly connect a portable backup generator to the service while the permanent generator is offline.

Grounding and Surge Protection: A new grounding connection will be provided for the new separately derived systems at the generators which will be specified to be directly connected to the existing ground electrode system at the buildings.

Remote Annunciator: A remote annunciator panel will be provided inside the building at each location to provide generator status and alarms.

4 | P a g e

7.0 SYSTEM STUDIES AND REPORTS

Fault current analysis, protective device coordination studies, and arc flash analysis studies will be specified to be performed by the installing contractor. Arc flash labels will be installed by the equipment installer for all new electrical components in accordance with study. The specifications will require the installer to perform the study based on the actual equipment being installed. Operational risks/issues identified in the study that require mitigation will be incorporated into the design. All databases for the electrical system studies will be provided to the government in softcopy.

Equipment Cut Sheets - 3

Travis AFB Generators Final body.pdf
Travis AFB Design report cover - 95%
Travis AFB Generators 95% Basis of Design
1.0 INTRODUCTION
1.1 The existing generators are located at Buildings B1041 and B1733 at Travis AFB, CA. The generators are used as backup power for POL storage and dispensing facilities. The generators are mission critical and required to ensure continuation of mis...
1.2 This basis of design report will describe where certain assumptions have been made, so that if additional information becomes available, the data can be re-incorporated to achieve the most accurate results possible. The salient features of the ass...
2.0 ELECTRICAL DESIGN OBJECTIVE
The overall project includes the following scope:
1. Removal of existing generators and transfer switchgear
2. Installation of two new 450kW/562kVA diesel backup generators on new concrete pad
3. Installation of two new manual transfer switchgear
3.0 SITE VERIFICATION
Faculty from Design West Engineering completed a survey of the existing generators and building electrical systems, and collected equipment information on the existing systems based on visible name plate information and visual inspections.
The collected information will be incorporated into the 100% design. As-builts could not be obtained for the existing systems.
4.0 ASSESSMENT OF EXISTING CONDITIONS
Currently, B1041 and B1733 consist of a 1200A 480V 3ph 4w electrical service each. An existing 300kW generator is connected through a manual transfer switchboard with kurt-key interlocked circuit breakers at each location. The switchboard feeds a 120...
The generators are currently and disconnected from the system and appear to be in poor condition. The manual transfer switchgear appears to be in adequate condition, however, due to the age of the equipment, they will be replaced. The existing condui...
5.0 DEMOLITION
The existing decommissioned generators will be demolished along with the existing above ground fuel tank at B1733. The existing main service/manual transfer switchgear within the buildings that are being replaced will be demolished. All obsolete ele...
The Government indicated downtime of the electrical service for replacement of the service switchgear is acceptable but must be scheduled in advance. The design will specify a minimum of 14-day notice be provided for any scheduled outages.
6.0 NEW POWER DISTRIBUTION COMPONENTS
Generators: A new backup generator set will be designed to support all critical loads. The generator is classified as POL (petroleum, oil, & lubricants)/Fuels. The role of the generator is to provide backup power when commercial power is turned off o...
The generators will be located away from the buildings on a new concrete foundation. All generator exhaust will be directed away from adjacent building openings and will be a minimum of 10’ away from any building openings. The generator enclosure w...
Manual Transfer Switchgear: A new 1200A 480V 3ph 4W switchboard will be provided and connected to new generators and existing utility feed to provide manual transfer between utility and generator. Switchboard will be provided with copper bus, draw-ou...
Triple Switch: A new interconnection switch will be provided at each location to allow for load bank testing and portable generator connections as required by Air Force Instruction (AFI) 32-1062, 6.5. The switch consists of three interlocked breakers...
Grounding and Surge Protection: A new grounding connection will be provided for the new separately derived systems at the generators which will be specified to be directly connected to the existing ground electrode system at the buildings.
Remote Annunciator: A remote annunciator panel will be provided inside the building at each location to provide generator status and alarms.
7.0 SYSTEM STUDIES AND REPORTS
Fault current analysis, protective device coordination studies, and arc flash analysis studies will be specified to be performed by the installing contractor. Arc flash labels will be installed by the equipment installer for all new electrical compone...
Travis AFB Generators 95% Cost Estimate_06.30.18
Travis AFB Generators 95% drawings_10.17.18
AFCEC, 65% Comments or Questions - D1 Response
Corpus 65 Percent Design Comment Sheet Rpr Generators - D1 Response
Luann 65 Percent Design Comment Sheet Rpr Generators-LT - D1 Response
Merdler 65 Percent Design Comment Sheet - Rpr Generators 1041 and 1733 - D1 Response

File details come from the government source that posted it. Updated .