This document contains a request for information (RFI) regarding a federal contract to repair fuel systems generators. The RFI provides responses to contractor questions about specifications for generator equipment, testing, and inspection requirements. The responses indicate that nickel-cadmium batteries as specified in the drawings are acceptable, contractor equipment layout shop drawings must be provided, and the inspection and testing requirements outlined in the specification sections will be sufficient if met. A related federal contract opportunity notice involves a solicitation from the Department of the Air Force Air Mobility Command to provide all materials, labor, supervision and equipment to complete the repair of fuel system generators at a specified location. A mandatory site visit is scheduled for February 23, 2021 for up to two individuals per company to receive base access passes.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
REQUEST FOR INFORMATION
DATE
ACTIVITY ID
CONTRACT TITLE
CONTRACT NO
RFI NO
RFI SUBJECT
DWG NO
DWG DETAIL
DWG SHEET NO
SPEC SECTION
SPEC PARAGRAPH
SPEC PAGE NO
RFI PRIORITY?
POTENTIAL TIME/COST?
SCHEDULE REFERENCED?
CRITICAL PATH?
4296/2C (9/98)
SHEET
of
CONTRACTOR QUESTION AND PROPOSED SOLUTION
RFI QUESTION/ISSUE:
CONTRACTOR PROPOSED SOLUTION:
DATE
CONTRACTOR/PROJECT MANAGER
NOTE: If the determination of this RFI is "Answered - No Cost" then this reply is given with the expressed understanding that it does not constitute a basis for any change in the amount or time of subject contract. Information provided in this response does not authorize work not currently included in the contract. If determination of this RFI is "Answered - Pending PCO" then this response may require a change to the contract.
ANSWERS AND COMMENTS
RFI REASON CODE
RFI ACTION
COMMENTS FOR DETAILED REVIEWER:
DETAILED REVIEWER 1 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 1 NAME/SIGNATURE
TITLE
RESPONSE DATE
DETAILED REVIEWER 2 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 2 NAME/SIGNATURE
TITLE
RESPONSE DATE
RFI RESPONSE:
DATE
GOVERNMENT CONSTRUCTION MANAGER
8.0.1291.1.339988.308172
| DateTimeField2: 2021-02-26 |
| activityID: |
| contractTitle: REPAIR FUEL SYSTEMS GENERATORS |
| Enter Cnt # Here: XDAT 14-1031 |
| rfiNo: Pre-Bid 06 |
| rfiSubject: SPECIFIED MANGUFACTURER ON DRAWINGS |
| dwgNo: |
| dwgDetail: |
| dwSheetNo: |
| specSection: |
| specParagraph: |
| specPageNo: |
| : |
| PageNumber: |
| TextField: The specified generator manufacturer on the drawings have several comments in regards to the specifications. Please confirm the following are acceptable. |
a. Specification section 2.13.3.1 & 2.23.1: Nicad batteries not included in generator bill of materials. Factory provided lead acid batteries included in scope of supply. Nicad batteries and rack cannot fit within sound enclosure
b. Specification section 2.3: Station battery not provided, engine starting batteries part of generator package
c. Specification section 2.27.1: MTU factory witness test viewing provided. Generator set will be testing in open package configuration, enclosure/sub base tank not part of test cell procedure.
d. Specification section 2.27.2: MTU factory testing includes extended 2 hour load bank test, voltage regulation and transient only. Engine bearing, hi- pot, etc. not included
e. Specification section 3.5: MTU service technician to perform standard NFPA110 field testing. Resistive load provided for field testing.
TextField:
TextField: a. The battery shall be nickel-cadmium and accordance with IEEE 485 & IEEE 484. Lead acid batteries are not acceptable. Enclosure shown in the drawings are based on MTU equipment dimensions. Contractor shall provide shop drawings of all electrical equipment layouts at B1733 & B1041 areas showing that the equipment will fit and meet all required clearances prior to ordering equipment.
b. In accordance with the specs set by the designers in section 2.23, a station battery system shall be provided to include the battery, battery rack, spacers, automatic battery charger and distribution panelboard with overcurrent protection, metering and relaying.
c. The inspection item checklist provided in specification 2.27.1 complies with all necessary components needed for a proper inspection of the engine-generator set.
d. This is acceptable as long as all other requirements specified in section 2.72.2 Factory tests are met.
e. As long as the specification needs for onsite inspection and tests in section 3.5 are met this is acceptable.
| SignatureField1: |
| DateTimeField1: 2021-02-26 |
| rfiReason: |
| SignatureField3: |
| TextField1: |
| SignatureField2: |
File details come from the government source that posted it. Updated .