Questions and Answers - Round 1.pdf

PDF 106 KB Posted

Attached to
Repair Fuel System Generators Federal contract opportunity
Solicitation number
FA442721R0012
Issued by
Department of the Air Force Air Mobility Command

About this file

This document contains questions and answers regarding Solicitation FA442721R0012 from the Department of the Air Force Air Mobility Command. The solicitation seeks a contractor to provide all materials, labor, supervision and equipment to complete repairs to fuel system generators at an Air Force base. A mandatory site visit was held on February 23, 2021 at 9:00AM PST, with requests to attend required by February 22 at 4:00PM PST. Attendees were instructed to provide full name and date of birth to receive base access passes. No more than two individuals per company were allowed on the site visit, and all were required to comply with Real ID Act and Covid-19 protocols including wearing a mask. General contractors are eligible to bid as prime contractors, and contractors must possess all required licenses and certifications to complete the work as outlined in the Statement of Work. A bid bond is not required to be submitted with responses to this solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Fuel System Generators, newest first.
File Type Posted
(ANS) XDAT 14-1031 PRE-BID RFI 13 -Switchgear.pdf PDF
(ANS) XDAT 14-1031 PRE-BID RFI 12 -Follow Up RFI_Battery.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 04 B1041 Wire Designation.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 05 B1733 Wire Designation.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 09 Triple Switch Elevations.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 06 Specified Generator Manufacturer (2.0).pdf PDF
(ANS) XDAT 14-11031 PRE-BID 03 Multiple Conduits on exterior.pdf PDF
Questions and Answers - Round 3.pdf PDF
Solicitation Amendment FA442721R00120001 SF 30.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 01 Fuel Tank Responsibility.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 08 Contractors Responsibility in Demolished Equipment.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 02 Drivers Training_Driving Privileges_Security Escorts.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 06 Specified Generator Manufacturer.pdf PDF
(ANS) XDAT 14-1031 PRE-BID 07 Requirements for Utilizing Crane.pdf PDF
XDAT 14-1031 PRE-BID RFI 11 Removal of Fuel.pdf PDF
XDAT 14-1031 PRE-BID RFI 10 Demolished Items.pdf PDF
48 - ED-2 - TANK DETAILS.pdf PDF
6 - B-6 - PUMPHOUSE ELEVATIONS.pdf PDF
3 - B-3 - PUMPHOUSE BUILDING SECTION.pdf PDF
33 - T-2 - APPURTENANCES AND FITTINGS.pdf PDF
5 - B-5 - PUMPHOUSE BUILDING SECTION.pdf PDF
29 - T-1 - FOUNDATION DETAILS.pdf PDF
1 - B - 1 PUMPHOUSE FLOOR PLAN AND DETAILS.pdf PDF
7 - B-7 - CONNECTION DETAILS.pdf PDF
2 - B-2 - PUMPHOUSE BUILDING PLAN.pdf PDF
43 - EU-1 - ELECTRICAL SITE PLAN AREA A.pdf PDF
20 - S-1 - VALVE VAULT DETAILS.pdf PDF
0 - C - 1 EXISTING SITE CONDITIONS AREA A.pdf PDF
4 - B-4 - PUMPHOUSE BUILDING SECTION.pdf PDF
8 - B-8 - CONNECTION DETAILS.pdf PDF
Questions and Answers - Round 2.pdf PDF
Attendance Sheet - Site Visit - Signed.pdf PDF
Attach 4a - B1041 Final Drawings.pdf PDF
Attach 2 - B1733 Final Design Analysis Report.pdf PDF
Attach 2a. - B1041 Final Design Analysis Report.pdf PDF
Attach 8 - WD CA20200007 27 November 2020.pdf PDF
Attach 5a - Submittal Register Generator B1041.pdf PDF
Attach 3a - B1041 Final Specifications.pdf PDF
Attach 11 - Contract Security Clause 29 Apr 19.pdf PDF
Solicitation - FA442721R0012.pdf PDF
Attach 4 - B1733 - Final Drawings.pdf PDF
Attach 3 - B1733 - Final Specifications.pdf PDF
Attach 5 - Submittal Register Generator B1733.pdf PDF
Attach 10 - Past Performance Questionnaire.docx DOCX document
Attach 7 - Travis Facilities Excellence Guide.pdf PDF
Attach 9 - Travis Specifications Section 01000.pdf PDF
Attach 1 - B1733 SOW Dated 23 Mar 2020.pdf PDF
Attach 6a - Bid Schedule B1041.xlsx XLSX spreadsheet
Attach 6 - Bid Schedule B1733.xlsx XLSX spreadsheet
Attach 1a - B1041 SOW Dated 23 Mar 2020.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation FA442721R0012 – Questions and Answers – Round 1

Question #1: Is the attached form the only form that needs to be submitted in order to be compliant to this solicitation?

Answer: Bid schedule listed in Section J must be completed and Section L lists what is required for Past Performance.

Question #2: Is there a checklist available indicating what must be included with our response?

Answer: No.

Question #3: The plans show replacing (2) generators with 450 KW units but the final specifications (Attachments 2a and 3a) show 550KW generators to replace the existing generator? Which is it?

Answer: The new generators will be 450 kW

Question #4: The bid documents state that a site visit can be arranged upon request? I am kindly asking for a site visit.

Answer: The site visit was held on 23 February per the solicitation.

Question #5: Is there a question and answer period for questions? To whom can questions be directed to?

Answer: Questions can be directed to SrA Ronald Aquino and Mr. Bryan Armstrong

Question #6: Can a class A general engineering contractor bid this contract as a prime contractor? What classification of contractor is required?

Answer: Yes a General Contractor can bid on this contract. Contractor must possess all licenses and certifications required to complete all work listed in the Statement of Work

Question #7: Is there a classification designation for this project. i.e. C-10 Electrical requirement. Can a class - A general engineering contractor perform the work.

Answer: Contractor must possess all licenses and certifications required to complete all work listed in the Statement of Work

Question #8: Do I need a bid bond?

Answer: A bid bond is not required.