Pre-Preposal_Conf_Site_Visit_Briefing.pptx

PPTX presentation 978 KB Posted

Attached to
Fairchild Aircraft Maintenance Federal contract opportunity
Solicitation number
FA3002-12-R-0022
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Pre-preposal conference briefing slides

View the file

Other files for this federal contract opportunity

Other files attached to Fairchild Aircraft Maintenance, newest first.
File Type Posted
Fairchild__PWS_Conformed_0004.pdf PDF
Fairchild_RFP_Amendment_(FA3002-12-R-0022-0004).pdf PDF
Fairchild_RFP_PWS_Change_Matrix_(0004).pdf PDF
RFP_Questions_Answers_(6_May_13).pdf PDF
RFP_Questions_Answers_(24_Apr_13).pdf PDF
Fairchild_RFP_Amendment_(FA3002-12-R-0022-0003).pdf PDF
Fairchild_Site_Visit_Conference_Attendance-Randolph_Personnel_(17_Apr_2013).pdf PDF
Fairchild_Site_Visit_Minutes_(17_Apr_2013).pdf PDF
Pre-Preposal_Conf_MX_Briefing.pptx PPTX presentation
Fairchild_Site_Visit_Conference_Attendance_(17_Apr_2013).pdf PDF
Fairchild_RFP_Amendment_(FA3002-12-R-0022-0002).pdf PDF
Atch_6_-_PPQ.docx DOCX document
Amendment_1.pdf PDF
Atch_5_-_PPQ_Cover_Letter_(7_Mar_13).docx DOCX document
Atch_8_-_PP_Consent_Form_(31_Jan_13).docx DOCX document
Atch_1_-_Fairchild_PWS_(10_Apr_13).pdf PDF
Atch_2_-_Wage_Determination_(19_Jun_12).pdf PDF
Atch_9_-_Question_and_Comment_Sheet_(31_Jan_13).xlsx XLSX spreadsheet
Fairchild_Executive_Summary.pdf PDF
Atch_4_-_Manpower_Matrix_(31_Jan_13).xlsx XLSX spreadsheet
Atch_7_-_PP_Information_Sheet_(31_Jan_13).docx DOCX document
Fairchild_RFP_(FA3002-12-R-0022).pdf PDF
Atch_3_-_QASP_(25Oct2012).pdf PDF
Atch_6_-_PPQ_(25_Jan_13).docx DOCX document
Question_and_Comment_Sheet.xlsx XLSX spreadsheet
Fairchild_Draft_Section_L_ _M_(LPTA)_17_Jan_13.pdf PDF
Fairchild Draft PWS.pdf PDF
Answers to RFI.docx DOCX document
Answers to RFI.docx DOCX document
RFI(Final).docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Welcome to Fairchild AFB!

Aircraft Maintenance Services Site Visit & Pre-Proposal Conference

Develop America's Airmen Today ... for Tomorrow

The First Command

CONFERENCE AGENDA

0800WelcomeMaj Matthew Johnson (36 RFQ/CC)
Mr. Tony Aguilard (A4PM Program Manager)
MSgt Adrian Bergman (36 RQF COR)
Ms. Michelle Spencer (AETC CONS Contract Specialist)

0900 Facility Tour MSgt Adrian Bergman

1000 Bus Departs for Cusick Facility Tour

COMMUNICATION

All communications regarding this acquisition shall be made through the Contracting Officer (CO) or designated representative only Contacts or briefings by participating offerors concerning this acquisition are not permitted outside of the formal source selection process The CO controls all contact or exchanges with potential offerors and is the only person authorized to release source selection information before and after contract award

DISCLAIMERS

This briefing is an overview of proposal requirements Offerors are responsible for carefully reading the requirements of the Solicitation and comply accordingly To the extent there are any inconsistencies between this briefing and the solicitation, the solicitation shall govern These slides are not to be interpreted as a comprehensive description of the requirements of the upcoming solicitation

Solicitation Ms. Michelle Spencer Contract Specialist

AETC CONS

ACQUISITION APPROACH

Solicitation will result in a single Firm-Fixed-Price Contract 1-year basic period, to include 30-day mobilization, plus Five (5) one-year option periods Basis of Award is Lowest Price Technically Acceptable The Govt. intends to Award without Discussions

Past Performance

PAST PERFORMANCE

Recent Within previous three years At least three months completed service Relevant Based on:

Scope Magnitude Complexity Ratings of:

Relevant Not Relevant

Technical Capability Mr. Tony Agullard Program Manager

AETC/A4PM

TECHNICAL CAPABILITY

The proposals shall be evaluated against the following Technical Capability subfactors:

Management Approach Technical Approach Staffing and Workforce Plan During evaluations of each proposal, the Government will assign each subfactor a rating as shown in the next slide. Separate ratings will be assessed for each subfactor. During evaluation of each proposal, the Government will assign a rating of either “Acceptable” or “Unacceptable”. A rating of unacceptable in one or more technical subfactors will constitute an overall unacceptable rating for the technical evaluation.

TECHNICAL RATINGDEFINITION
AcceptableProposal clearly meets the minimum requirements of the solicitation.
UnacceptableProposal does not clearly meet the minimum requirements of the solicitation.

TECHNICAL CAPABILITY

Risk is inherent in the government’s evaluation/assessment of this Factor. Risks have the potential to disrupt schedule, increase costs, degrade performance, increase need for Government oversight, or increase likelihood of unsuccessful contract performance. A rating of “Unacceptable” in one or more technical subfactor(s) will constitute an overall rating of “Unacceptable” for the technical evaluation.

TECHNICAL PROPOSAL

What makes an acceptable proposal Tell us the

HowYour technical approach
Who and how manyYour workforce
WhatThe services you will provide
When(If applicable)

Acceptable -- Meets specified minimum performance or capability requirements necessary for acceptable contract performance

Performance Work Statement MSgt Adrian Bergman Chief, Contracting Officer Representative

36 RQF/MAQI

PERFORMANCE WORK STATEMENT

Aircraft Maintenance Expectations Maintenance Requirements Aircraft Inventory & Flying Hours Government Furnished Facilities/Property Quality Control/Contracting Officer Rep Services Summary

Expectations:

Provide safe, reliable, mission capable aircraft to support the 36 RQF flying mission requirements Aggressively work toward meeting AETC Aircraft Availability and maintenance goals

Maintenance Requirements On-Equipment (flight line maintenance) Limited off-equipment maintenance/host unit provides remaining support (NDI, PMEL, Fabrication, AGE) Periodic/Phase maintenance Off-Station recovery Support Deployments Provide Mission Essential Ground Personnel

Aircraft Inventory & Flying Hours Four (4) UH-1N Helicopters Projected Flying Hours FY14 – FY19 – 1512 annual

Existing Facilities Hanger 1005/Hanger Cusick Spare Parts Includes bench stock Tools including special tools/test equipment

ADPE

Quality Control Service Provider shall have a government approved Quality Control plan Contracting Officer Representative (COR) Government oversight provided by 2 COR personnel assigned to the 36 RQF

Performance ObjectivePerformance Threshold
Aircraft Availability2.0
Maintenance Non-Delivery2% or Less
Maintenance Scheduling Effectiveness95% or Higher
Average Fleet Time200 +/- 10%
Foreign Object Damage2.0
Break Rate12.0

Rules of Engagement for Site Visit Ms. Michelle Spencer Contract Specialist

AETC CONS

RULES OF ENGAGEMENT

Group must remain together for security reasons Cell phones must be turned off or on silent Be courteous of incumbent contractor and staff Please refrain from discussions with them while on tour

All questions will be written on the provided questionnaire and submitted to the contracting office Only clarification questions concerning the sites will be answered during the site visit

Official responses will be posted on FBO via RFP Amendment

For all questions, include:

Company Name

POC

E-mail address Phone Number

Return to all of the following:

Liz Preston, elizabeth.preston@us.af.mil
Michelle Spencer, belinda.spencer@us.af.milAntoinette Davis, antoinette.davis.1@us.af.mil

One-on-One Sessions

ONE-ON-ONE SESSIONS

Held via telephone conferencing on 19 Apr 13 Starting at 0800 hrs CST Limited to 15 minutes Interested parties will receive an e-mail on 18 Apr 13 with confirmation of their one-on-one session, as well as instructions for dialing in to the session

Government panel comprised of:

Contracting Officer Program Manager Contracting Officer Representative Contract Administrators

Questions?

image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .