Fairchild_Site_Visit_Minutes_(17_Apr_2013).pdf

PDF 104 KB Posted

Attached to
Fairchild Aircraft Maintenance Federal contract opportunity
Solicitation number
FA3002-12-R-0022
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Pre-preposal conference and site visit minutes

View the file

Other files for this federal contract opportunity

Other files attached to Fairchild Aircraft Maintenance, newest first.
File Type Posted
Fairchild__PWS_Conformed_0004.pdf PDF
Fairchild_RFP_Amendment_(FA3002-12-R-0022-0004).pdf PDF
Fairchild_RFP_PWS_Change_Matrix_(0004).pdf PDF
RFP_Questions_Answers_(6_May_13).pdf PDF
RFP_Questions_Answers_(24_Apr_13).pdf PDF
Fairchild_RFP_Amendment_(FA3002-12-R-0022-0003).pdf PDF
Fairchild_Site_Visit_Conference_Attendance-Randolph_Personnel_(17_Apr_2013).pdf PDF
Pre-Preposal_Conf_MX_Briefing.pptx PPTX presentation
Pre-Preposal_Conf_Site_Visit_Briefing.pptx PPTX presentation
Fairchild_Site_Visit_Conference_Attendance_(17_Apr_2013).pdf PDF
Fairchild_RFP_Amendment_(FA3002-12-R-0022-0002).pdf PDF
Atch_6_-_PPQ.docx DOCX document
Amendment_1.pdf PDF
Atch_5_-_PPQ_Cover_Letter_(7_Mar_13).docx DOCX document
Atch_8_-_PP_Consent_Form_(31_Jan_13).docx DOCX document
Atch_1_-_Fairchild_PWS_(10_Apr_13).pdf PDF
Atch_2_-_Wage_Determination_(19_Jun_12).pdf PDF
Atch_9_-_Question_and_Comment_Sheet_(31_Jan_13).xlsx XLSX spreadsheet
Fairchild_Executive_Summary.pdf PDF
Atch_4_-_Manpower_Matrix_(31_Jan_13).xlsx XLSX spreadsheet
Atch_7_-_PP_Information_Sheet_(31_Jan_13).docx DOCX document
Fairchild_RFP_(FA3002-12-R-0022).pdf PDF
Atch_3_-_QASP_(25Oct2012).pdf PDF
Atch_6_-_PPQ_(25_Jan_13).docx DOCX document
Question_and_Comment_Sheet.xlsx XLSX spreadsheet
Fairchild_Draft_Section_L_ _M_(LPTA)_17_Jan_13.pdf PDF
Fairchild Draft PWS.pdf PDF
Answers to RFI.docx DOCX document
Answers to RFI.docx DOCX document
RFI(Final).docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR EDUCATION AND TRAINING COMMAND (AETC)

17 Apr 2013

MEMORANDUM FOR AETC/CONS/A4PM

FROM: 36 RQF/MAQI

SUBJECT: Fairchild Site Visit for contract FA300212R0022

1. The Fairchild Site Visit was held 17 April 2013 at 0800 hrs in the 36 RQF conference room. Personnel in attendance were:

2. The meeting opened with introductions followed by the day’s agenda. Contract Solicitation, explanation of one-on-one meetings, rules for the site visit and Past Performance were presented by Ms. Michelle Spencer. Mr. Anthony Agullard briefed how Technical Capability would be evaluated.

Questions/Answers:

- Mr. Dan Adams asked if the slideshow presentations would be available after the site visit.

-- Ms. Michelle Spencer stated the slides would be available and will be posted at FBO.

- Mr. Dan Adams questioned the 8 April 13 suspense question and comment sheet.

-- Mrs. Michelle Spencer explained the discrepancy was a typo and would correct via amendment.

Mr. Dan Adams, Akima Technical Solutions Mr. Raymond James, Doss Aviation, INC.

Maj Johnson 36 RQF/CC Ms. Ma. Elena Cortezano AETC/CONS (via conference line) Mr. Anthony Agullard AETC/A4PM (via conference line) Mr. John Kochart AETC/A4PM (via conference line) Ms. Michelle Spencer AETC/CONS (via conference line) Mr. Kenneth McCright AETC/CONS (via conference line) Ms. Gloria Marshall AETC/CONS (via conference line) Ms. Antoinette Davis AETC/CONS (via conference line) Mr. Todd Joyner AETC/CONS (via conference line) MSgt Bergman 36 RQF/CCOR MSgt Clements 36 RQF/COR

- Mr. Dan Adams had a question about the format that the email questions should be in for the one-on-one meetings.

-- Mrs. Michelle Spencer explained the format in the solicitation was correct.

3. MSgt Bergman briefed the different areas of the Performance Work Statement followed by Major Johnson presenting the 36 RQF MX Site Visit Mission Brief.

Questions/Answers

- Mr. Dan Adams questioned the delivery date for a QC plan.

-- Mr. Anthony Agullard clarified QC Plan is due on Pre-Performance Conference.

- Mr. Dan Adams wanted to know if the maintenance trailer was dispatched for all TDY’s.

-- MSgt Bergman/Maj Johnson explained that the trailer was dispatched on a case by case basis depending on the TDY.

- Mr. Dan Adams had a question on the aircraft FLIR system pertaining to the mounting on the side.

-- Maj Johnson confirmed the mounting location but explained the possibility of that changing depending on a new system installation.

4. Mr. Dan Adams of Akima Technical Solutions and Mr. Raymond James of Doss Aviation, INC both declined the offer to visit the Tacoma Command Post for a site visit.

5. A site visit of the hangar area was conducted at 0850. The visit consisted of the hangar/offices, the maintenance trailer and the flight line and concluded at 0915.

6. If additional information is needed on any issue please contact the COR office @ DSN 657-

3587.

ADRIAN T. BERGMAN, MSGT, USAF

Chief Contracting Officer Representative

1st Ind, 36RQF/CC

Approved/Disapproved.

MATTHEW K. JOHNSON, Major, USAF 36 Rescue Flight and Functional Commander

DEPARTMENT OF THE AIR FORCE
FROM: 36 RQF/MAQI
2013-04-18T12:40:58-0700
BERGMAN.ADRIAN.T.1152397999
2013-04-18T14:21:46-0700
JOHNSON.MATTHEW.KRISTOPHER.1146263700