Multiple Facility Painting Requirement (MFPR)
Indefinite Delivery Indefinite Quantity (IDIQ)
Schriever AFB, CO
TASK ORDER
FOR
Building 30
1. Project Requirements: The work requested in this project consists of the Contractor furnishing all layout, survey, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals necessary to perform all of the work outlined below and in the
Schriever Paint – General Requirements document.
1.1. Contractor shall patch and repair holes and dings in existing walls.
1.2. Paint colors shall match Tan/Neutral Scheme outlined in Attachment 2, Schriever Paint
Schemes.
1.2.1. This project includes painting of gypsum board walls, ceilings, vestibule entry ways, black pillars, guard room (room 110), restroom (room 104), and the holding cell (not shown on as-built – located next to Mechanical room 106).
1.2.2. Contractors shall use protective coatings (i.e. plastic sheet or tape) when necessary to protect existing infrastructure.
1.3. Contractor shall replace existing cove base in vestibules to match color scheme.
1.4. This facility is located within Schriever Air Force Base’s restricted area and will require an escort able to pass back ground checks. See attachment 10, Security Requirements.
Room # Room Perimeter (LF) Wall Height (ft) Notes Paint Area (SF) Door/Room # Location
108 54 10 Tan/Neutral Scheme 540 105 SE
107 54 10 Tan/Neutral Scheme 540 Holding Cell SE
101 54 10 Tan/Neutral Scheme 540
102 54 10 Tan/Neutral Scheme 540
103 242 10 Tan/Neutral Scheme 2420
110 58 10 Tan/Neutral Scheme 580
104 40 10 Tan/Neutral Scheme 400
Holding Cell 66 10 Tan/Neutral Scheme 660
BUILDING 30 - PAINT - IDIQ SEED PROJECT
Total Paint Area