Multiple Facility Painting Requirement (MFPR)

Indefinite Delivery Indefinite Quantity (IDIQ)

Schriever AFB, CO

TASK ORDER

FOR

Building 30

1. Project Requirements: The work requested in this project consists of the Contractor furnishing all layout, survey, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals necessary to perform all of the work outlined below and in the

Schriever Paint – General Requirements document.

1.1. Contractor shall patch and repair holes and dings in existing walls.

1.2. Paint colors shall match Tan/Neutral Scheme outlined in Attachment 2, Schriever Paint

Schemes.

1.2.1. This project includes painting of gypsum board walls, ceilings, vestibule entry ways, black pillars, guard room (room 110), restroom (room 104), and the holding cell (not shown on as-built – located next to Mechanical room 106).

1.2.2. Contractors shall use protective coatings (i.e. plastic sheet or tape) when necessary to protect existing infrastructure.

1.3. Contractor shall replace existing cove base in vestibules to match color scheme.

1.4. This facility is located within Schriever Air Force Base’s restricted area and will require an escort able to pass back ground checks. See attachment 10, Security Requirements.

Room # Room Perimeter (LF) Wall Height (ft) Notes Paint Area (SF) Door/Room # Location

108 54 10 Tan/Neutral Scheme 540 105 SE

107 54 10 Tan/Neutral Scheme 540 Holding Cell SE

101 54 10 Tan/Neutral Scheme 540

102 54 10 Tan/Neutral Scheme 540

103 242 10 Tan/Neutral Scheme 2420

110 58 10 Tan/Neutral Scheme 580

104 40 10 Tan/Neutral Scheme 400

Holding Cell 66 10 Tan/Neutral Scheme 660

BUILDING 30 - PAINT - IDIQ SEED PROJECT

Total Paint Area

B30 Task Order_Revised
Copy of Attachment A - B30 Sizing
B30 Floor Plan
Attachment B - B30 Floor Plan