14- Bldg 30 Task Order_Floor Plan_Sizing.pdf

PDF 421 KB Posted

Attached to
Amendment 3 Multi Facility Schriever AFB Painting IDIQ Federal contract opportunity
Solicitation number
FA255021R0003
Issued by
Department of the Air Force Space Command

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 3 Multi Facility Schriever AFB Painting IDIQ, newest first.
File Type Posted
RFIs_2_PAINTING IDIQ.pdf PDF
Solicitation Amendment FA255021R00030003 SF 30.pdf PDF
B30 Task Order_Revised_Amendment 0002.pdf PDF
Solicitation Amendment FA255021R00030002 SF 30.pdf PDF
RFIs_PAINTING IDIQ.pdf PDF
B120 Task Order_Revised_Amendment 0002.pdf PDF
Amendment 0001 FA255021R00030001.pdf PDF
15- Bldg 120 Task Order_Floor Plan_Sizing.pdf PDF
16- Section L and M.pdf PDF
Solicitation - FA255021R0003.pdf PDF
9- Facility Excellence Plan.pdf PDF
6- Design Guide_Final.docx DOCX document
8- SAFB Overreaching Environmental.rtf RTF text file
12- Liquidated Damages Painting IDIQ.pdf PDF
10- Security Requirements.docx DOCX document
2- Schriever Paint Schemes.pptx PPTX presentation
5- Installation Facility Standards.pdf PDF
11- Wage Determination CO20200022_30 Oct20.pdf PDF
7- SAFB Environmental Supplement - 2020MAR_Final.docx DOCX document
1 -MFPR IDIQ SOW_14AUG20.docx DOCX document
17- Tables for RFP.xlsx XLSX spreadsheet
13- Submittal Register AF Form 66.xlsx XLSX spreadsheet
4- Safety Requirements.docx DOCX document
3- Environmental Requirements.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Multiple Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)

Schriever AFB, CO

TASK ORDER

FOR

Building 30

1. Project Requirements: The work requested in this project consists of the Contractor furnishing all layout, survey, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals necessary to perform all of the work outlined below and in the Multi Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)– General Requirements document.

1.1. Contractor shall patch and repair holes and dings in existing walls.

1.2. Paint colors shall match Tan/Neutral Scheme outlined in Attachment 2

1.2.1. This project includes painting of gypsum board walls and in some instances ceilings (restrooms), metal doors, and metal door trim.

1.2.2. Contractors shall use protective coatings (i.e. plastic sheet or tape) when necessary to protect existing infrastructure.

1.3. This facility is located within Schriever Air Force Base’s restricted area and will require an escort able to pass back ground checks. See attachment 10, Security Requirements.

Room # Room Perimeter (LF) Wall Height (ft) 108 54 10 107 54 10 101 54 10 102 54 10 103 242 10 110 58 10 104 40 10

Door/Room # Location 105 southeast

Notes Paint Area (SF)

Total Paint Area (drywall) 5560

B30 Task Order
Attachment B - B30 Floor Plan
B30 Sizing

File details come from the government source that posted it. Updated .