Multiple Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)

Schriever AFB, CO

TASK ORDER

FOR

Building 30

1. Project Requirements: The work requested in this project consists of the Contractor furnishing all layout, survey, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals necessary to perform all of the work outlined below and in the Multi Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)– General Requirements document.

1.1. Contractor shall patch and repair holes and dings in existing walls.

1.2. Paint colors shall match Tan/Neutral Scheme outlined in Attachment 2

1.2.1. This project includes painting of gypsum board walls and in some instances ceilings (restrooms), metal doors, and metal door trim.

1.2.2. Contractors shall use protective coatings (i.e. plastic sheet or tape) when necessary to protect existing infrastructure.

1.3. This facility is located within Schriever Air Force Base’s restricted area and will require an escort able to pass back ground checks. See attachment 10, Security Requirements.

Room # Room Perimeter (LF) Wall Height (ft) 108 54 10 107 54 10 101 54 10 102 54 10 103 242 10 110 58 10 104 40 10

Door/Room # Location 105 southeast

Notes Paint Area (SF)

Total Paint Area (drywall) 5560

B30 Task Order
Attachment B - B30 Floor Plan
B30 Sizing