Multiple Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)
Schriever AFB, CO
TASK ORDER
FOR
Building 120
1. Project Requirements: The work requested in this project consists of the Contractor furnishing all layout, survey, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals necessary to perform all of the work outlined below and in the Multi Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)
– General Requirements document.
1.1. Contractor shall patch and repair holes and dings in existing walls.
1.2. Contractor shall paint all surfaces outlined in Building 120 Task Order Sizing document, to include all metal door trim (that has existing protective paint coatings) and metal doors (that have existing protective paint coatings. Paint colors shall match the blue/grey color scheme. The gymnasium shall be the only exception. Areas currently covered in blue color shall be painted Graystone. White areas above shall be painted White Winged Dove color.
1.2.1. This project includes removal of wallpaper, painting of gypsum board walls and in some instances ceilings (restrooms), metal doors, and metal trim.
1.2.2. Contractors shall use protective coatings (i.e. plastic sheet or tape) when necessary to protect existing infrastructure.
Room # Room Perimeter (LF) Wall Height 101/102/103/113/116 (To include lobby raised ceiling area)
435 9
122 42 9 121 86 9 123 96 9 118 39 9 Gym Bathroom 38 9 117 343 20 105 181 9 107 255 9 109 117 9 110 25 9 109A 21 9 112 140 9 114 123 9 124 162 9
Door/Room # Location 117 (5) Gym Bathroom Outdoor storage 124 (2) 109A 116 (Rear gym exit)
Notes Paint Area (SF)
23060
| B120 Task Order |
| Attachment B - B120 Floor Plan |
| B120 Sizing |