15- Bldg 120 Task Order_Floor Plan_Sizing.pdf

PDF 465 KB Posted

Attached to
Amendment 3 Multi Facility Schriever AFB Painting IDIQ Federal contract opportunity
Solicitation number
FA255021R0003
Issued by
Department of the Air Force Space Command

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 3 Multi Facility Schriever AFB Painting IDIQ, newest first.
File Type Posted
Solicitation Amendment FA255021R00030003 SF 30.pdf PDF
RFIs_2_PAINTING IDIQ.pdf PDF
B120 Task Order_Revised_Amendment 0002.pdf PDF
RFIs_PAINTING IDIQ.pdf PDF
B30 Task Order_Revised_Amendment 0002.pdf PDF
Solicitation Amendment FA255021R00030002 SF 30.pdf PDF
Amendment 0001 FA255021R00030001.pdf PDF
14- Bldg 30 Task Order_Floor Plan_Sizing.pdf PDF
16- Section L and M.pdf PDF
Solicitation - FA255021R0003.pdf PDF
4- Safety Requirements.docx DOCX document
3- Environmental Requirements.docx DOCX document
5- Installation Facility Standards.pdf PDF
11- Wage Determination CO20200022_30 Oct20.pdf PDF
7- SAFB Environmental Supplement - 2020MAR_Final.docx DOCX document
1 -MFPR IDIQ SOW_14AUG20.docx DOCX document
17- Tables for RFP.xlsx XLSX spreadsheet
13- Submittal Register AF Form 66.xlsx XLSX spreadsheet
9- Facility Excellence Plan.pdf PDF
6- Design Guide_Final.docx DOCX document
8- SAFB Overreaching Environmental.rtf RTF text file
12- Liquidated Damages Painting IDIQ.pdf PDF
10- Security Requirements.docx DOCX document
2- Schriever Paint Schemes.pptx PPTX presentation
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Multiple Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)

Schriever AFB, CO

TASK ORDER

FOR

Building 120

1. Project Requirements: The work requested in this project consists of the Contractor furnishing all layout, survey, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals necessary to perform all of the work outlined below and in the Multi Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)

– General Requirements document.

1.1. Contractor shall patch and repair holes and dings in existing walls.

1.2. Contractor shall paint all surfaces outlined in Building 120 Task Order Sizing document, to include all metal door trim (that has existing protective paint coatings) and metal doors (that have existing protective paint coatings. Paint colors shall match the blue/grey color scheme. The gymnasium shall be the only exception. Areas currently covered in blue color shall be painted Graystone. White areas above shall be painted White Winged Dove color.

1.2.1. This project includes removal of wallpaper, painting of gypsum board walls and in some instances ceilings (restrooms), metal doors, and metal trim.

1.2.2. Contractors shall use protective coatings (i.e. plastic sheet or tape) when necessary to protect existing infrastructure.

Room # Room Perimeter (LF) Wall Height 101/102/103/113/116 (To include lobby raised ceiling area)

435 9

122 42 9 121 86 9 123 96 9 118 39 9 Gym Bathroom 38 9 117 343 20 105 181 9 107 255 9 109 117 9 110 25 9 109A 21 9 112 140 9 114 123 9 124 162 9

Door/Room # Location 117 (5) Gym Bathroom Outdoor storage 124 (2) 109A 116 (Rear gym exit)

Notes Paint Area (SF)

23060

B120 Task Order
Attachment B - B120 Floor Plan
B120 Sizing

File details come from the government source that posted it. Updated .