17- Tables for RFP.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Amendment 3 Multi Facility Schriever AFB Painting IDIQ Federal contract opportunity
- Solicitation number
- FA255021R0003
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submission Req for Proposal
| TITLE | HARD COPIES | PAGE MAXIMUM | DVDs |
| Volume I - Executed Contract Documentation and Price Proposal | Original and |
one (1) copy
| No page limitation | 1 | |
| Volume II - Technical Proposal | Original and |
one (1) copy 10 pages 1
Factor 1- Technical
| Table 1. Technical Acceptable/Unacceptable Rating Method | |
| Adjectival Rating | Description |
| Acceptable | The proposal acceptably meets specified requirements of the solicitation. |
| Unacceptable | The proposal does not meet specified requirements of the solicitation |
Base Coefficient Worksheet
| Insert the proposed coefficient in Section B for each coefficient including the option periods. Limit coefficient to four (4) decimal places. The offeror’s price proposal shall contain downward-sloping pricing for the total weighted average coefficient for each option period. Downward-sloping pricing must be reflected by the fourth decimal place (see example below). Offers which do not comply with this requirement shall be considered non-responsive and not eligible for award. Include the coefficient worksheet. | |
| Standard Hours-Secured Area (Order $750,000 and Below) | 43% |
| Standard Hours-Secured Area (Order Above $750,000) | 1% |
| Standard Hours-Non-Secured Area (Order $750,000 and Below) | 49% |
| Standard Hours-Non-Secured Area (Order Above $750,000) | 1% |
| Non-Standard Hours-Secured Area (Order $750,000 and Below) | 3% |
| Non-Standard Hours-Secured Area (Order Above $750,000) | 1% |
| Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) | 1% |
| Non-Standard Hours-Non-Secured Area (Order Above $750,000) | 1% |
| Total: | 100% |
| COEFFICIENT SCHEDULE B | |
| Base Period: DATE OF AWARD, THROUGH 28 FEBRUARY 2024 | |
| B0001 Standard Hours-Secured Area (Order $750,000 and Below) | ______________ |
| B0002 Standard Hours-Secured Area (Order Above $750,000) | ______________ |
| B0003 Standard Hours-Non-Secured Area (Order $750,000 and Below) | ______________ |
| B0004 Standard Hours-Non-Secured Area (Order Above $750,000) | ______________ |
| B0005 Non-Standard Hours-Secured Area (Order $750,000 and Below) | ______________ |
| B0006 Non-Standard Hours-Secured Area (Order Above $750,000) | ______________ |
| B0007 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) | ______________ |
| B0008 Non-Standard Hours-Non-Secured Area (Order Above $750,000) | ______________ |
Option Pd 1 Worksheet Option Period One:
| B0009 Standard Hours-Secured Area (Order $750,000 and Below) | ______________ |
| B0010 Standard Hours-Secured Area (Order Above $750,000) | ______________ |
| B0011 Standard Hours-Non-Secured Area (Order $750,000 and Below) | ______________ |
| B0012 Standard Hours-Non-Secured Area (Order Above $750,000) | ______________ |
| B0013 Non-Standard Hours-Secured Area (Order $750,000 and Below) | ______________ |
| B0014 Non-Standard Hours-Secured Area (Order Above $750,000) | ______________ |
| B0015 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) | ______________ |
| B0016 Non-Standard Hours-Non-Secured Area (Order Above $750,000) | ______________ |
Option Pd 2 Worksheet Option Period Two:
| B0017 Standard Hours-Secured Area (Order $750,000 and Below) | ______________ |
| B0018 Standard Hours-Secured Area (Order Above $750,000) | ______________ |
| B0019 Standard Hours-Non-Secured Area (Order $750,000 and Below) | ______________ |
| B0020 Standard Hours-Non-Secured Area (Order Above $750,000) | ______________ |
| B0021 Non-Standard Hours-Secured Area (Order $750,000 and Below) | ______________ |
| B0022 Non-Standard Hours-Secured Area (Order Above $750,000) | ______________ |
| B0023 Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) | ______________ |
| B0024 Non-Standard Hours-Non-Secured Area (Order Above $750,000) | ______________ |
EXAMPLE- Coefficient Worksheet
| The following is an EXMAPLE of the evaluation for the base period: | |||
| Schriever AFB (Base Year) | Anticipated Work % | Proposed Coeff. | Weighted Coeff. |
| Standard Hours-Secured Area (Order $750,000 and Below) | 43% | 1.27 | 0.5461 | |
| Standard Hours-Secured Area (Order Above $750,000) | 1% | 1.25 | 0.0125 | |
| Standard Hours-Non-Secured Area (Order $750,000 and Below) | 49% | 1.17 | 0.5733 | |
| Standard Hours-Non-Secured Area (Order Above $750,000) | 1% | 1.15 | 0.0115 | |
| Non-Standard Hours-Secured Area (Order $750,000 and Below) | 3% | 1.32 | 0.0396 | |
| Non-Standard Hours-Secured Area (Order Above $750,000) | 1% | 1.3 | 0.013 | |
| Non-Standard Hours-Non-Secured Area (Order $750,000 and Below) | 1% | 1.22 | 0.0122 | |
| Non-Standard Hours-Non-Secured Area (Order Above $750,000) | 1% | 1.2 | 0.012 | |
| SUBTOTAL | 100% | 1.2202 |
| Below is an example of downward sloping coefficients based on the calculated coefficient. | |
| Base Period | 1.2202 |
| Option Period 1 | 1.2201 |
| Option Period 2 | 1.22 |
| TOTAL | 3.6603 |
Total (Base Year plus Option Period, used for proposal evaluation) 3.6603/3 Ordering Periods = 1.2201
1.2201 x $5,000,000.00 = $6,100,500.00 as the Total Evaluated Price (TEP)
File details come from the government source that posted it. Updated .