Multiple Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)
Schriever AFB, CO
TASK ORDER
FOR
Building 120
1. Project Requirements: The work requested in this project consists of the Contractor furnishing all layout, survey, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals necessary to perform all of the work outlined below and in the Schriever Paint – General Requirements document.
1.1. Contractor shall patch and repair holes and dings in existing walls.
A. This shall include but is not limited to: patching the wall behind the banner in the main lobby, foyer behind resale machines (west wall), west wall of main lobby (behind marketing TV), main hall outside of cardio room (east wall), weight room (east wall), cardio room (east lower wall below windows), aerobics room west wall, room 123, supply room (doorway).
1.2. Contractor shall remove all fatheads (gym and lobby logos). Contractor shall not remove pictures or award boards. Contractor shall not put any original pictures or logos back up on the walls.
1.3. Contractor shall paint all surfaces, outlined in the sizing floor plan, to include all metal door trim (that has existing protective paint coatings) and metal doors (that have existing protective paint coatings. Paint colors shall match the blue/grey color scheme. The gymnasium shall be the only exception to the previous mentioned colors. Areas currently covered in blue color shall be painted Graystone. White areas above shall be painted White Winged Dove color.
A. This project includes removal of wallpaper, repairing any holes from removing existing wallpaper, painting of gypsum board walls and in some instances ceilings (restrooms), metal doors, and metal trim.
B. Contractors shall use protective coatings (i.e. plastic sheet or tape) when necessary to protect existing infrastructure.
1.4. Contractor shall replace existing cove base throughout facility to match color scheme.
1.5. This facility is located within Schriever Air Force Base and will require bass access. Crew must be able to pass back ground checks. See attachment 10, Security Requirements.
1.6. The room schedule for the order of rooms to be painted is as follows:
A. Room # 117 Gymnasium B. Gym Bathroom C. Room # 118 Gym Storage D. Room # 124 Aerobics Room E. Room # 115 Racquetball Court F. Room # 114 General Fitness Room Area G. Room # 112 Cardio H. Room # 109 Weight Room I. Room # 109A Janitors Room J. Room #106/107 Men’s Locker Room K. Room # 104/105 Women’s Locker Room L. Rooms 101/102/103/113/116 (to include lobby raised ceiling) M. Room # 122 Manager’s Office
i. The contractor shall move furniture prior to painting and move furniture back to its original location once painting is concluded.
N. Room # 121 General Office
Multiple Facility Painting Requirement (MFPR) Indefinite Delivery Indefinite Quantity (IDIQ)
Schriever AFB, CO
i. The contractor shall move furniture prior to painting and move furniture back to its original location once painting is concluded.
O. Room # 123 Storage Laundry
i. The contractor shall move furniture prior to painting and move furniture back to its original place once painting is concluded. Some items that are bolted to the ground (i.e.
washer and dryer) shall not be moved.
P. Room # 110 Weight Room Closet
Room # Room Perimeter (LF) Wall Height 101/102/103/113/116 (To include lobby raised ceiling area)
435 9
122 42 9 121 86 9 123 96 9 118 39 9 Gym Bathroom 38 9 117 343 20 105 181 9 107 255 9 109 117 9 110 25 9 109A 21 9 112 140 9 114 123 9 124 162 9
Door/Room # Location 117 (5) Gym Bathroom Outdoor storage 124 (2) 109A 116 (Rear gym exit)
Notes Paint Area (SF)
23060