Questions and Answers 7.pdf
PDF 121 KB Posted
- Attached to
- Posting Official Bid Opening Results of 5 May 2022. There were 8 bids received in response and listed on the attached Official Bid Opening Spreadsheet. The apparent Low Bidder, QBS Inc located in Alliance Ohio is highlighted in yellow. Federal contract opportunity
- Solicitation number
- FA252122B0002
About this file
This document contains the official bid opening results for solicitation number FA252122B0002 from the Department of the Air Force Space Command. There were eight bids received in response to the solicitation to renovate Facility 35420 at Cape Canaveral Space Force Station, Florida. The scope of work includes replacement of interior lighting, installation of electric motors on garage doors, interior and exterior building modifications, installation of a rotary air compressor with sound mitigation, and construction of a 20'x20' air-conditioned office. QBS Inc. located in Alliance, Ohio was identified as the apparent low bidder. The bid included pricing for the base bid as well as four possible additive items that may or may not be awarded depending on funding availability.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
Contractor Name: _QBS, Inc________________________
POC: _Matthew Martin_____________________
IFB Section _23 00 00_________ Paragraph __3.7 and 3.10_______
SOW/Technical Specification/Drawings paragraph/page __Drawing pg. M-102_________
Other (Specify) ___________________________
Question: _The spec refers to duct leak testing but leak tests not typically performed on mini-splits.
There is simply Exhaust fan exhaust duct and the Fan Coil outside air intake ducts. Please confirm that duct leak testing is truly intended.______________________________________________________
45 CES Response: This is to confirm, duct leak testing is not required for the Fan Coil Unit Outside Air and exhaust fan duct.
IFB Section _23 00 00_________ Paragraph __3.10_______
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) ___________________________
Question: Para 3.10 refers to performance tests done post TAB, Test and Balance. Is this performance testing simply commissioning of the system?______________________________________________
45 CES Response: Correct, this is startup and testing of the split system condensing unit and fan coils and associated systems.
IFB Section _23 00 00_________ Paragraph __3.11_______
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) ___________________________
Question: _____Para. 3.11 refers to performing and documenting Indoor Air Quality presumably per SMACNA. Will this also require a building flush out with outside air typical of LEED certified buildings?
45 CES Response: No, the facility does not require this and is not intended to meet LEED typical requirements.
IFB Section ____N/A______ Paragraph ___N/A______
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
SOW/Technical Specification/Drawings paragraph/page __N/A_________
Other (Specify) ___________________________
Question: _Please issue the site visit attendance list from site visit on 04/07/22.____
Response: This was been posted on sam.gov under the solicitation on 12 Apr 22.