Atch 6 Questions and Answers 8.pdf
PDF 156 KB Posted
- Attached to
- Posting Official Bid Opening Results of 5 May 2022. There were 8 bids received in response and listed on the attached Official Bid Opening Spreadsheet. The apparent Low Bidder, QBS Inc located in Alliance Ohio is highlighted in yellow. Federal contract opportunity
- Solicitation number
- FA252122B0002
About this file
This document contains a question and answer template for a solicitation to renovate an ICO facility at Cape Canaveral Space Force Station, Florida. The solicitation seeks a base bid and four possible additive items for work including replacing interior lighting, adding electric motors to garage doors, interior and exterior building modifications, installing an air compressor with sound mitigation, and providing an air-conditioned office. Questions from offerors cover topics such as responsibility for the fire service backflow, availability of geotechnical reports, and removal of equipment from affected areas prior to construction. Responses are provided by 45th Civil Engineer Squadron personnel.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
Contractor Name: Siler – SCF JV
POC: John K. Baxter
IFB Section __________ Paragraph _________
SOW/Technical Specification/Drawings paragraph/page: Plan Page C-102
Other (Specify) ___________________________
Question: The fire service backflow is noted “By Others”, will the contractor be tying into backflow provided by the Govt, or will contractor need to include?
Answer: 45 CES Response: Contractor will be tying into a fire water backflow device provided by others.
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) _____General______________________
Question: Provide current geotechnical report.
Answer: 45 CES Response: There is no geotechnical report available. Note, dwg page S-502, detail C3, requires geotechnical testing for pile installation, that will describe water table.
IFB Section __________ Paragraph _________
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) _______General____________________
Question: Verify that the Owner will be responsible for removing ALL equipment, unbolted furniture, personal effects, etc from the affected areas prior to construction.
Answer: 45 CES: This is to confirm the owner will be responsible for removing all equipment, unbolted furniture, personal effects, etc, from the affected areas prior to construction.
Atch 6
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
Other (Specify) ________General___________________
Question: Provide sign-in sheets for the pre-bid site walk/meeting.
Answer: Already posted on sam.gov.
Other (Specify) ______Mechanical_____________________
Question: Provide the firm and point of contact for the mechanical controls system.
Answer: 45 CES Response: POC for mechanical control system is Mr Tony Ward, HVAC Controls Engineer, Cape Launch Operations & Infrastructure (CLOIS), ASRC Federal.
Other (Specify) _________General__________________
Question: Confirm that the Government will allow proposers a minimum of seven (7) days to respond to the RFP starting from the date that the Government responds to 100% of the RFIs received.
Answer: The Government allows a minimum of this time when posting and if the Government deems it necessary to extend the bid date it will be accomplished via amendment. There will be no confirmation since it will depend if the RFI has any bearing on the terms or the answer is clearly shown, the due date for submission is 13 Apr and there should be sufficient time and if there is a delay the Government will make the determination to extend the bid due date via amendment on the complexity of the questions.