About this file

This document contains questions and answers regarding solicitation FA2521-22-B-0002 for Project DBEH 20-1501. The project involves renovating Facility 35420 at Cape Canaveral SFS, FL, including replacing interior lighting, adding electric motors to garage doors, interior/exterior modifications, installing an air-conditioned rotary air compressor with sound mitigation, and providing a 20'x20' air-conditioned office. There were no asbestos or lead abatement reports, as the facility was constructed in 1993 with few candidate substrates. Drawings provided graphical and non-graphical scales for dimensions. The apparent low bidder was QBS Inc. located in Alliance, Ohio.

View the file

Other files for this federal contract opportunity

Other files attached to Posting Official Bid Opening Results of 5 May 2022. There were 8 bids received in response and listed on the attached Official Bid Opening Spreadsheet. The apparent Low Bidder, QBS Inc located in Alliance Ohio is highlighted in yellow., newest first.
File Type Posted
Official Bid Opening Spreadsheet.xlsx XLSX spreadsheet
Atch 6 Questions and Answers 13 Atch 1 pictures.pdf PDF
Atch 6 Questions and Answers 13.pdf PDF
Atch 5 Blank Badge Form Updated.pdf PDF
Atch 6 Questions and Answers 5.pdf PDF
Atch 6 Questions and Answers 6.pdf PDF
Atch 6 Questions and Answers 10.pdf PDF
Atch 6 Questions and Answers 11 Atch 1 GEOTECH.pdf PDF
Atch 6 Questions and Answers 2.pdf PDF
Atch 6 Questions and Answers 4 Revision.pdf PDF
Atch 6 Questions and Answers 7.pdf PDF
Atch 6 Questions and Answers 8.pdf PDF
Atch 6 Questions and Answers 9.pdf PDF
Atch 6 Questions and Answers 11.pdf PDF
Amendment FA252122B0002 0002.pdf PDF
Atch 6 Questions and Answers 3.pdf PDF
Atch 6 Questions and Answers 12.pdf PDF
Atch 6 Questions and Answers 11 Atch 2 SEPTIC CALCS.pdf PDF
Questions and Answers 7.pdf PDF
Questions and Answers 5.pdf PDF
Questions and Answers 6.pdf PDF
Questions and Answers 8.pdf PDF
Questions and Answers 2.pdf PDF
Questions and Answers 3.docx.pdf PDF
Questions and Answers 4.docx.pdf PDF
PKAC Sign In Sheet - Site Visit.pdf PDF
Question and Answer Outside The Box1.pdf PDF
Atch 5 BLANK BADGE FORM Corrected.pdf PDF
Amendment 0001 SF 30.pdf PDF
Atch 3 WD FL20220001-25 Feb 2022.pdf PDF
Atch 5 BLANK BADGE FORM.pdf PDF
Solicitation FA252122B0002.pdf PDF
Atch 1 Specs. DBEH 20-1501 15 Feb 2022.pdf PDF
Atch 2 Drawings DBEH 20-1501 2022 02 24.pdf PDF
Atch 4 GPP Certification Form.pdf PDF
Atch 6 Questions Template.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWER TEMPLATE

Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501

Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL

Contractor Name: _Outside The Box, LLC________________________

POC: ___Jeff Neidigh___________________

IFB Section __________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) __All drawings_________________________

Question: ____________We are requesting drawings that are to scale, please provide ASAP so we can continue our takeoffs _

45 CES Response: All drawing pages with construction details are provided with a graphical scale and/or non-graphical scale. Drawing pages, which are narrative in content, are not provided with a scale. Some pages are provided with non-graphical scale only; most of these are for small details, which do not have long dimensions. On these pages, dimensions are provided for some of these details, which can be used for take-offs. Regarding the page size, you can open the document properties and see the drawing is 34”x22” which is ANSI D, if a properly sized print set is more helpful. If there is a specific example the above does not answer, please provide so it can be specifically addressed. _______________________________________________

IFB Section 02 82 00__________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) ___________________________

Question: Please provide the asbestos / lead abatement report or provide quantities and locations of what needs to be abated. __

45 CES Response: There is no asbestos or lead abatement report for this facility. The facility was constructed in 1993. The facility has few candidate substrates where these items are concern, no sheetrock, and no large painted interior surfaces.