This document contains questions and responses related to a solicitation for renovations to an ICO Facility at Cape Canaveral Space Force Station in Florida. The solicitation seeks a contractor to provide labor, equipment, and materials to renovate and repair Facility 35420, including replacement of interior lighting, installation of electric motors on garage doors, interior and exterior building modifications, installation of an air-conditioned rotary air compressor with sound mitigation, and construction of a 20'x20' air-conditioned office space. Key issues addressed include fire sprinkler design assumptions and code compliance, exceptions to fire detection and alarm standards, sizing of water supply lines, and permitting requirements for an on-site sewage treatment and disposal system. The solicitation number is FA2521-22-B-0002 and was issued by the Department of the Air Force Space Command.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
Contractor Name: _QBS, Inc________________________
POC: _Matthew Martin_____________________
IFB Section _01 11 00.00 30_________ Paragraph __1.2.7_______
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) ___________________________
Question: _There is a serious flaw in fire sprinkler design assumptions; as designed, the fire sprinkler design will not satisfy the UFC 3-600-01 code as it’s referenced in the spec. paragraph. Specifically, the referenced UFC code requires a storage occupancy to be calculated based on building height/potential storage, not planned storage height like the 13’ height as the contract design supposes. To meet the UFC 3-600-01 (for bldg. height) would require greater flow and greatly increased sprinkler pipe sizes vs.
what’s currently scoped. The only way the currently scoped design could be used is with letter from the AHJ acknowledging that they understand it won't meet the UFC as written. Please advise.
Response: Sprinkler system design reflects sprinklers at all the highest points in main facility, and the highest points in the new occupied spaces. Please provide specific reference in drawing if there is a more specific concern.
IFB Section _28 31 64.00 10_________ Paragraph __2.1_______
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) ___________________________
Question: What exceptions to the NFPA 72, UFC 3-600-01 and UFC 4-021-01 are acceptable as directed by the Contracting Officer when it comes to the fire detection, alarm and mass notification systems as referenced in spec. para. 2.1?
Response: There are no exceptions. If there is a more specific concern, please make the question more specific.
IFB Section __________ Paragraph _________
SOW/Technical Specification/Drawings paragraph/page _C-102__________
Other (Specify) ___________________________
Atch 6
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
Question: Is it the Government’s intent for the contractor to assume the diameter sizing of the Fire Suppression line of 4’’ and the domestic water line of 2” are sized greatly enough to provide sufficient water pressures, especially when considering the distance the water lines travel to the building?
Response: Yes.
IFB Section ____33 11 00______ Paragraph ___3.2.5______
SOW/Technical Specification/Drawings paragraph/page __C-102_________
Other (Specify) _________________________
Question: _In reference to RFI answer issued 4-12-22, “the construction contractor will accomplish the permitting for the OSTDS, per FAC 64-e-6”, is it acceptable that an out-of-state, non-Florida state-licensed GC hire a certified septic system installer to accomplish the permitting for the OSTDS who would complete the necessary draft forms as listed, the DH4015 which after review by 45SW would then be submitted to DOH?
Response: The septic system installer must be certified in the method required by FAC 64-e-6.