About this file

This document contains questions and responses related to a solicitation for renovations to an ICO Facility at Cape Canaveral Space Force Station in Florida. The solicitation seeks a contractor to provide labor, equipment, and materials to renovate and repair Facility 35420, including replacement of interior lighting, installation of electric motors on garage doors, interior and exterior building modifications, installation of an air-conditioned rotary air compressor with sound mitigation, and construction of a 20'x20' air-conditioned office space. Key issues addressed include fire sprinkler design assumptions and code compliance, exceptions to fire detection and alarm standards, sizing of water supply lines, and permitting requirements for an on-site sewage treatment and disposal system. The solicitation number is FA2521-22-B-0002 and was issued by the Department of the Air Force Space Command.

View the file

Other files for this federal contract opportunity

Other files attached to Posting Official Bid Opening Results of 5 May 2022. There were 8 bids received in response and listed on the attached Official Bid Opening Spreadsheet. The apparent Low Bidder, QBS Inc located in Alliance Ohio is highlighted in yellow., newest first.
File Type Posted
Official Bid Opening Spreadsheet.xlsx XLSX spreadsheet
Atch 6 Questions and Answers 13 Atch 1 pictures.pdf PDF
Atch 6 Questions and Answers 13.pdf PDF
Atch 6 Questions and Answers 1.pdf PDF
Atch 6 Questions and Answers 11 Atch 2 SEPTIC CALCS.pdf PDF
Atch 5 Blank Badge Form Updated.pdf PDF
Atch 6 Questions and Answers 5.pdf PDF
Atch 6 Questions and Answers 10.pdf PDF
Atch 6 Questions and Answers 11 Atch 1 GEOTECH.pdf PDF
Atch 6 Questions and Answers 2.pdf PDF
Atch 6 Questions and Answers 4 Revision.pdf PDF
Atch 6 Questions and Answers 7.pdf PDF
Atch 6 Questions and Answers 8.pdf PDF
Atch 6 Questions and Answers 9.pdf PDF
Atch 6 Questions and Answers 11.pdf PDF
Amendment FA252122B0002 0002.pdf PDF
Atch 6 Questions and Answers 3.pdf PDF
Atch 6 Questions and Answers 12.pdf PDF
Questions and Answers 7.pdf PDF
Questions and Answers 5.pdf PDF
Questions and Answers 6.pdf PDF
Questions and Answers 8.pdf PDF
Questions and Answers 2.pdf PDF
Questions and Answers 3.docx.pdf PDF
Questions and Answers 4.docx.pdf PDF
PKAC Sign In Sheet - Site Visit.pdf PDF
Question and Answer Outside The Box1.pdf PDF
Atch 5 BLANK BADGE FORM Corrected.pdf PDF
Amendment 0001 SF 30.pdf PDF
Atch 4 GPP Certification Form.pdf PDF
Atch 6 Questions Template.docx DOCX document
Atch 3 WD FL20220001-25 Feb 2022.pdf PDF
Atch 5 BLANK BADGE FORM.pdf PDF
Solicitation FA252122B0002.pdf PDF
Atch 1 Specs. DBEH 20-1501 15 Feb 2022.pdf PDF
Atch 2 Drawings DBEH 20-1501 2022 02 24.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWER TEMPLATE

Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501

Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL

Contractor Name: _QBS, Inc________________________

POC: _Matthew Martin_____________________

IFB Section _01 11 00.00 30_________ Paragraph __1.2.7_______

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) ___________________________

Question: _There is a serious flaw in fire sprinkler design assumptions; as designed, the fire sprinkler design will not satisfy the UFC 3-600-01 code as it’s referenced in the spec. paragraph. Specifically, the referenced UFC code requires a storage occupancy to be calculated based on building height/potential storage, not planned storage height like the 13’ height as the contract design supposes. To meet the UFC 3-600-01 (for bldg. height) would require greater flow and greatly increased sprinkler pipe sizes vs.

what’s currently scoped. The only way the currently scoped design could be used is with letter from the AHJ acknowledging that they understand it won't meet the UFC as written. Please advise.

Response: Sprinkler system design reflects sprinklers at all the highest points in main facility, and the highest points in the new occupied spaces. Please provide specific reference in drawing if there is a more specific concern.

IFB Section _28 31 64.00 10_________ Paragraph __2.1_______

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) ___________________________

Question: What exceptions to the NFPA 72, UFC 3-600-01 and UFC 4-021-01 are acceptable as directed by the Contracting Officer when it comes to the fire detection, alarm and mass notification systems as referenced in spec. para. 2.1?

Response: There are no exceptions. If there is a more specific concern, please make the question more specific.

IFB Section __________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page _C-102__________

Other (Specify) ___________________________

Atch 6

QUESTION AND ANSWER TEMPLATE

Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501

Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL

Question: Is it the Government’s intent for the contractor to assume the diameter sizing of the Fire Suppression line of 4’’ and the domestic water line of 2” are sized greatly enough to provide sufficient water pressures, especially when considering the distance the water lines travel to the building?

Response: Yes.

IFB Section ____33 11 00______ Paragraph ___3.2.5______

SOW/Technical Specification/Drawings paragraph/page __C-102_________

Other (Specify) _________________________

Question: _In reference to RFI answer issued 4-12-22, “the construction contractor will accomplish the permitting for the OSTDS, per FAC 64-e-6”, is it acceptable that an out-of-state, non-Florida state-licensed GC hire a certified septic system installer to accomplish the permitting for the OSTDS who would complete the necessary draft forms as listed, the DH4015 which after review by 45SW would then be submitted to DOH?

Response: The septic system installer must be certified in the method required by FAC 64-e-6.