About this file

This document contains the official bid opening results for solicitation number FA252122B0002 from the Department of the Air Force Space Command. Eight bids were received in response to the project to renovate Facility 35420 at Cape Canaveral Space Force Station, Florida. The scope of work includes replacing interior lighting, adding electric motors to garage doors, interior and exterior building modifications, installing a rotary type air compressor with sound mitigation, and providing a 20'x20' air-conditioned office. The apparent low bidder is QBS Inc. located in Alliance, Ohio. The bid includes pricing for a base bid and four potential additive items that may or may not be awarded depending on available funds.

View the file

Other files for this federal contract opportunity

Other files attached to Posting Official Bid Opening Results of 5 May 2022. There were 8 bids received in response and listed on the attached Official Bid Opening Spreadsheet. The apparent Low Bidder, QBS Inc located in Alliance Ohio is highlighted in yellow., newest first.
File Type Posted
Official Bid Opening Spreadsheet.xlsx XLSX spreadsheet
Atch 6 Questions and Answers 13 Atch 1 pictures.pdf PDF
Atch 6 Questions and Answers 13.pdf PDF
Atch 5 Blank Badge Form Updated.pdf PDF
Atch 6 Questions and Answers 5.pdf PDF
Atch 6 Questions and Answers 6.pdf PDF
Atch 6 Questions and Answers 10.pdf PDF
Atch 6 Questions and Answers 11 Atch 1 GEOTECH.pdf PDF
Amendment FA252122B0002 0002.pdf PDF
Atch 6 Questions and Answers 3.pdf PDF
Atch 6 Questions and Answers 12.pdf PDF
Atch 6 Questions and Answers 2.pdf PDF
Atch 6 Questions and Answers 4 Revision.pdf PDF
Atch 6 Questions and Answers 8.pdf PDF
Atch 6 Questions and Answers 9.pdf PDF
Atch 6 Questions and Answers 11.pdf PDF
Atch 6 Questions and Answers 1.pdf PDF
Atch 6 Questions and Answers 11 Atch 2 SEPTIC CALCS.pdf PDF
Questions and Answers 7.pdf PDF
Questions and Answers 5.pdf PDF
Questions and Answers 6.pdf PDF
Questions and Answers 8.pdf PDF
Questions and Answers 2.pdf PDF
Questions and Answers 4.docx.pdf PDF
PKAC Sign In Sheet - Site Visit.pdf PDF
Questions and Answers 3.docx.pdf PDF
Question and Answer Outside The Box1.pdf PDF
Amendment 0001 SF 30.pdf PDF
Atch 5 BLANK BADGE FORM Corrected.pdf PDF
Atch 3 WD FL20220001-25 Feb 2022.pdf PDF
Solicitation FA252122B0002.pdf PDF
Atch 1 Specs. DBEH 20-1501 15 Feb 2022.pdf PDF
Atch 2 Drawings DBEH 20-1501 2022 02 24.pdf PDF
Atch 5 BLANK BADGE FORM.pdf PDF
Atch 4 GPP Certification Form.pdf PDF
Atch 6 Questions Template.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWER TEMPLATE

Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501

Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL

Contractor Name: _QBS, Inc________________________

POC: _Matthew Martin_____________________

IFB Section _23 00 00_________ Paragraph __3.7 and 3.10_______

SOW/Technical Specification/Drawings paragraph/page __Drawing pg. M-102_________

Other (Specify) ___________________________

Question: _The spec refers to duct leak testing but leak tests not typically performed on mini-splits.

There is simply Exhaust fan exhaust duct and the Fan Coil outside air intake ducts. Please confirm that duct leak testing is truly intended.______________________________________________________

45 CES Response: This is to confirm, duct leak testing is not required for the Fan Coil Unit Outside Air and exhaust fan duct.

IFB Section _23 00 00_________ Paragraph __3.10_______

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) ___________________________

Question: Para 3.10 refers to performance tests done post TAB, Test and Balance. Is this performance testing simply commissioning of the system?______________________________________________

45 CES Response: Correct, this is startup and testing of the split system condensing unit and fan coils and associated systems.

IFB Section _23 00 00_________ Paragraph __3.11_______

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) ___________________________

Question: _____Para. 3.11 refers to performing and documenting Indoor Air Quality presumably per SMACNA. Will this also require a building flush out with outside air typical of LEED certified buildings?

45 CES Response: No, the facility does not require this and is not intended to meet LEED typical requirements.

IFB Section ____N/A______ Paragraph ___N/A______

Atch 6

QUESTION AND ANSWER TEMPLATE

Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501

Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL

SOW/Technical Specification/Drawings paragraph/page __N/A_________

Other (Specify) ___________________________

Question: _Please issue the site visit attendance list from site visit on 04/07/22.____

Response: This was been posted on sam.gov under the solicitation on 12 Apr 22.