About this file

This document contains questions and answers regarding Solicitation FA2521-22-B-0002 for Project DBEH 20-1501 to renovate Facility 35420 at Cape Canaveral Space Force Station in Florida. The solicitation requires replacement of interior lighting, addition of electric motors to garage doors, interior and exterior building modifications, installation of a rotary air compressor with sound mitigation, and construction of a 20'x20' air-conditioned office. Questions addressed clarification on items included in the solicitation, specifications for metal roofing and wall panels to be replaced, ADA requirements for stairs, and whether surveys had been conducted for asbestos, lead, or PCBs at the facility.

View the file

Other files for this federal contract opportunity

Other files attached to Posting Official Bid Opening Results of 5 May 2022. There were 8 bids received in response and listed on the attached Official Bid Opening Spreadsheet. The apparent Low Bidder, QBS Inc located in Alliance Ohio is highlighted in yellow., newest first.
File Type Posted
Official Bid Opening Spreadsheet.xlsx XLSX spreadsheet
Atch 6 Questions and Answers 13 Atch 1 pictures.pdf PDF
Atch 6 Questions and Answers 13.pdf PDF
Atch 5 Blank Badge Form Updated.pdf PDF
Atch 6 Questions and Answers 5.pdf PDF
Atch 6 Questions and Answers 6.pdf PDF
Atch 6 Questions and Answers 10.pdf PDF
Atch 6 Questions and Answers 11 Atch 1 GEOTECH.pdf PDF
Atch 6 Questions and Answers 2.pdf PDF
Atch 6 Questions and Answers 4 Revision.pdf PDF
Atch 6 Questions and Answers 7.pdf PDF
Atch 6 Questions and Answers 8.pdf PDF
Atch 6 Questions and Answers 9.pdf PDF
Atch 6 Questions and Answers 11.pdf PDF
Amendment FA252122B0002 0002.pdf PDF
Atch 6 Questions and Answers 3.pdf PDF
Atch 6 Questions and Answers 12.pdf PDF
Atch 6 Questions and Answers 1.pdf PDF
Atch 6 Questions and Answers 11 Atch 2 SEPTIC CALCS.pdf PDF
Questions and Answers 7.pdf PDF
Questions and Answers 5.pdf PDF
Questions and Answers 6.pdf PDF
Questions and Answers 8.pdf PDF
Questions and Answers 3.docx.pdf PDF
Questions and Answers 4.docx.pdf PDF
PKAC Sign In Sheet - Site Visit.pdf PDF
Question and Answer Outside The Box1.pdf PDF
Atch 5 BLANK BADGE FORM Corrected.pdf PDF
Amendment 0001 SF 30.pdf PDF
Atch 3 WD FL20220001-25 Feb 2022.pdf PDF
Atch 5 BLANK BADGE FORM.pdf PDF
Solicitation FA252122B0002.pdf PDF
Atch 1 Specs. DBEH 20-1501 15 Feb 2022.pdf PDF
Atch 2 Drawings DBEH 20-1501 2022 02 24.pdf PDF
Atch 4 GPP Certification Form.pdf PDF
Atch 6 Questions Template.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWER TEMPLATE

Solicitation: FA2521-22-B-0002

Project Number: DBEH 20-1501

Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL

Contractor Name: _William Industrial & Marine

POC: _Andrew Smith

IFB Section Paragraph

SOW/Technical Specification/Drawings paragraph/page C-103

Other (Specify)

Question:

Sheet C-103 shows a new fire backflow device concrete pad (by others) and new fire hydrant (by others).

However, none of these items are listed in the key notes. Are these items to be included under this solicitation?

Response: The hydrant and BFP are not part of this project, they are not under this solicitation.

SOW/Technical Specification/Drawings paragraph/page A4/AD-101

Detail A4/AD-101 – Are the metal wall panels, between the eave and the soffit, to be removed?

Response: These wall panels are part of the roof system, yes, these panels are required to be replaced.

SOW/Technical Specification/Drawings paragraph/page A-202

Question: _Note #1, A-202 – Will the stair treads need to meet ADA heel proof requirements?

RESPONSE: Stair is accessing a Storage Mezzanine area in a Storage Facility. No accommodations need to be made for ADA Heel Proof Requirements accessing the storage Mezzanine

QUESTION AND ANSWER TEMPLATE

Solicitation: FA2521-22-B-0002

Project Number: DBEH 20-1501

Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL

SOW/Technical Specification/Drawings paragraph/page 01 45 00.00 10 3.4.3

Specification Section 01 45 00.00 10 3.4.3 “Experience Matrix”. Given the limited complexity of this project, will this requirement be needed for the solicitation?

Response: The QC for structural (mezzanine), Civil, environmental (septic system) and mechanical (new

A/C) work will be responsible to submit shop drawings and overseeing construction compliance, therefore need to demonstrate a competent understanding for these labor categories. The experience matrix is required.

SOW/Technical Specification/Drawings paragraph/page A-203

What type of metal roof is to be installed? Screw down panel, standing seam? Existing roof was standing seam. Please provide specifications.

Response: Replace with like, use standing seam metal roof.

SOW/Technical Specification/Drawings paragraph/page _N/A_

Has a survey been conducted for ACM, LBP and/or PCBs?

Response: There is no asbestos or lead abatement report for this facility. The facility was constructed in 1993. The facility has few candidate substrates where these items are concern, no sheetrock, and no large painted interior surfaces.

File details come from the government source that posted it. Updated .