Questions and Answers 2.pdf
PDF 408 KB Posted
- Attached to
- Posting Official Bid Opening Results of 5 May 2022. There were 8 bids received in response and listed on the attached Official Bid Opening Spreadsheet. The apparent Low Bidder, QBS Inc located in Alliance Ohio is highlighted in yellow. Federal contract opportunity
- Solicitation number
- FA252122B0002
About this file
This document contains questions and answers regarding Solicitation FA2521-22-B-0002 for Project DBEH 20-1501 to renovate Facility 35420 at Cape Canaveral Space Force Station in Florida. The solicitation requires replacement of interior lighting, addition of electric motors to garage doors, interior and exterior building modifications, installation of a rotary air compressor with sound mitigation, and construction of a 20'x20' air-conditioned office. Questions addressed clarification on items included in the solicitation, specifications for metal roofing and wall panels to be replaced, ADA requirements for stairs, and whether surveys had been conducted for asbestos, lead, or PCBs at the facility.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002
Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
Contractor Name: _William Industrial & Marine
POC: _Andrew Smith
IFB Section Paragraph
SOW/Technical Specification/Drawings paragraph/page C-103
Other (Specify)
Question:
Sheet C-103 shows a new fire backflow device concrete pad (by others) and new fire hydrant (by others).
However, none of these items are listed in the key notes. Are these items to be included under this solicitation?
Response: The hydrant and BFP are not part of this project, they are not under this solicitation.
SOW/Technical Specification/Drawings paragraph/page A4/AD-101
Detail A4/AD-101 – Are the metal wall panels, between the eave and the soffit, to be removed?
Response: These wall panels are part of the roof system, yes, these panels are required to be replaced.
SOW/Technical Specification/Drawings paragraph/page A-202
Question: _Note #1, A-202 – Will the stair treads need to meet ADA heel proof requirements?
RESPONSE: Stair is accessing a Storage Mezzanine area in a Storage Facility. No accommodations need to be made for ADA Heel Proof Requirements accessing the storage Mezzanine
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002
Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
SOW/Technical Specification/Drawings paragraph/page 01 45 00.00 10 3.4.3
Specification Section 01 45 00.00 10 3.4.3 “Experience Matrix”. Given the limited complexity of this project, will this requirement be needed for the solicitation?
Response: The QC for structural (mezzanine), Civil, environmental (septic system) and mechanical (new
A/C) work will be responsible to submit shop drawings and overseeing construction compliance, therefore need to demonstrate a competent understanding for these labor categories. The experience matrix is required.
SOW/Technical Specification/Drawings paragraph/page A-203
What type of metal roof is to be installed? Screw down panel, standing seam? Existing roof was standing seam. Please provide specifications.
Response: Replace with like, use standing seam metal roof.
SOW/Technical Specification/Drawings paragraph/page _N/A_
Has a survey been conducted for ACM, LBP and/or PCBs?
Response: There is no asbestos or lead abatement report for this facility. The facility was constructed in 1993. The facility has few candidate substrates where these items are concern, no sheetrock, and no large painted interior surfaces.