Questions and Answers 3.docx.pdf
PDF 218 KB Posted
- Attached to
- Posting Official Bid Opening Results of 5 May 2022. There were 8 bids received in response and listed on the attached Official Bid Opening Spreadsheet. The apparent Low Bidder, QBS Inc located in Alliance Ohio is highlighted in yellow. Federal contract opportunity
- Solicitation number
- FA252122B0002
About this file
This document contains questions and answers related to solicitation FA2521-22-B-0002 for project DBEH 20-1501. The project involves renovating and repairing Facility 35420 at Cape Canaveral Space Force Station in Florida, including replacing interior lighting, adding electric motors to garage doors, modifying interior and exterior buildings, installing a rotary air compressor with sound mitigation, and providing a 20'x20' air-conditioned office. Questions addressed include requests for drawings to be provided to scale for accurate takeoffs, inquiries about asbestos and lead abatement requirements and related reports or quantities, and whether geotechnical reports are available given dewatering needs mentioned in the drawings. Responses indicate all drawings are to scale as specified, no asbestos or lead abatement work is required, and drawing S-502 details C3 references future geotechnical testing describing the water table.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002
Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
Contractor Name: _Outside The Box, LLC________________________
POC: ___Jeff Neidigh___________________
IFB Section __________ Paragraph _________
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) __All drawings_________________________
Question: ____________We are requesting drawings that are to scale, please provide ASAP so we can continue our takeoffs
___The drawings are still not to scale when printed in ANSI D nor Arch D, ANSIE or arch E. I have spent over an hour trying to get them to scale to no avail.
Please have A&E save the print file into the proper size and re-issue. Most of that do the take-offs do not actually print out on paper but use our digitizing programs and can make some adjustment but if not properly fitted to size, misstates will be made and no one needs that. Please consider re-issuing the drawings to scale
Response: The prior response is still accurate. All of the drawings are drawn to the specified scale. Note there are dimensions on the drawings, recommend those be used to supplement.
IFB Section 02 82 00__________ Paragraph _________
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) ___________________________
Question: Please provide the asbestos / lead abatement report or provide quantities and locations of what needs to be abated.
QUESTION AND ANSWER TEMPLATE
Solicitation: FA2521-22-B-0002
Project Number: DBEH 20-1501
Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL
_Are spec sections 02 82 00 and 02 83 00 being removed?
Response: No asbestos or lead abatement requirement is specified. No work is being requested that needs to be removed. The specs do not need to be removed.
IFB Section _01 11 00_________ Paragraph _____1.2.8____
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) ___________________________
Question: ____See above, to address what hazardous materials testing and drawings , cost estimates, and specifications to mitigate ______
Response: See response to same above questions.
IFB Section __________ Paragraph _________
SOW/Technical Specification/Drawings paragraph/page ___________
Other (Specify) ____Geotech Report_______________________
Question: ____Is there a geo report available so we can determine what dewatering may be required? The water table in the report will assist us determine what method we may need to use.
Response: There is no geotechnical report available. Note, dwg page S-502, detail C3, requires geotechnical testing for pile installation that will describe water table.