About this file

This document contains questions and answers related to a solicitation for renovations to Facility 35420 at Cape Canaveral Space Force Station in Florida. The solicitation is for a base bid plus four potential additive items for work including replacement of interior lighting, addition of electric motors to garage doors, interior and exterior building modifications, installation of an air-compressed with sound mitigation, and construction of a 20'x20' air-conditioned office. Bidders are asked to provide pricing for a rock and pipe septic system as the base bid but an alternative multi-pipe system will be considered if it provides benefits to the government and meets Florida regulatory requirements. The 45th Civil Engineer Squadron provides responses to questions clarifying that the contractor is responsible for obtaining necessary septic permitting and fees. Geotechnical information and septic system sizing calculations are available from the contracting officer.

View the file

Other files for this federal contract opportunity

Other files attached to Posting Official Bid Opening Results of 5 May 2022. There were 8 bids received in response and listed on the attached Official Bid Opening Spreadsheet. The apparent Low Bidder, QBS Inc located in Alliance Ohio is highlighted in yellow., newest first.
File Type Posted
Official Bid Opening Spreadsheet.xlsx XLSX spreadsheet
Atch 6 Questions and Answers 13.pdf PDF
Atch 6 Questions and Answers 13 Atch 1 pictures.pdf PDF
Atch 6 Questions and Answers 2.pdf PDF
Atch 6 Questions and Answers 4 Revision.pdf PDF
Atch 6 Questions and Answers 7.pdf PDF
Atch 6 Questions and Answers 8.pdf PDF
Atch 6 Questions and Answers 9.pdf PDF
Atch 5 Blank Badge Form Updated.pdf PDF
Atch 6 Questions and Answers 5.pdf PDF
Atch 6 Questions and Answers 6.pdf PDF
Atch 6 Questions and Answers 10.pdf PDF
Atch 6 Questions and Answers 11 Atch 1 GEOTECH.pdf PDF
Amendment FA252122B0002 0002.pdf PDF
Atch 6 Questions and Answers 3.pdf PDF
Atch 6 Questions and Answers 12.pdf PDF
Atch 6 Questions and Answers 1.pdf PDF
Atch 6 Questions and Answers 11 Atch 2 SEPTIC CALCS.pdf PDF
Questions and Answers 7.pdf PDF
Questions and Answers 5.pdf PDF
Questions and Answers 6.pdf PDF
Questions and Answers 8.pdf PDF
Questions and Answers 3.docx.pdf PDF
Questions and Answers 2.pdf PDF
Questions and Answers 4.docx.pdf PDF
PKAC Sign In Sheet - Site Visit.pdf PDF
Question and Answer Outside The Box1.pdf PDF
Atch 5 BLANK BADGE FORM Corrected.pdf PDF
Amendment 0001 SF 30.pdf PDF
Atch 5 BLANK BADGE FORM.pdf PDF
Atch 3 WD FL20220001-25 Feb 2022.pdf PDF
Solicitation FA252122B0002.pdf PDF
Atch 1 Specs. DBEH 20-1501 15 Feb 2022.pdf PDF
Atch 2 Drawings DBEH 20-1501 2022 02 24.pdf PDF
Atch 4 GPP Certification Form.pdf PDF
Atch 6 Questions Template.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWER TEMPLATE

Solicitation: FA2521-22-B-0002 Project Number: DBEH 20-1501

Project Description: Renovate ICO Facility35420 at Cape Canaveral SFS, FL

Contractor Name: __CORE Engineering & Construction, Inc._______________________

POC: __Lou Hambro____________________

IFB Section __________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page __Drawing Sheet C-502_________

Other (Specify) ___Onsite Sewage Treatment & Disposal System________________________

Question: _Sheet C-502, Detail A2 indicate emitter lines for the sewage disposal. The detail is marked not to scale. However, no engineering or basis of design for the emitters or required linear feet of drip field has been provided to the Contractor/Constructor.

Answer: 45 CES Response: For reference purposes only, please refer to attached calculations.

Please provide a standard rock and pipe system or approved equivalent.

IFB Section __33 11 00________ Paragraph ____3.2.5_____

SOW/Technical Specification/Drawings paragraph/page ___________

Other (Specify) _Septic Tank permitting__________________________

Question: ____Is Contractor responsible for obtaining the Department of Health/FDEP sewage permit (and any fees) that is required prior to construction?

Answer: 45 CES Response: Yes, refer to specification 33 11 00 section 3.2.5.

IFB Section __33 11 00________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page __Drawing Sheet C-502_________

Other (Specify) ___________________________

Question: Regarding the septic tank, is the design intent to provide a rock and pipe style drain field?

Answer: 45 CES Response: Yes, design intent is to install rock and pipe system.

IFB Section __33 11 00________ Paragraph _________

Atch 6

Other (Specify) ___________________________

Question: Is a multi-pipe septic system acceptable as an alternative to rock and pipe?

Answer: 45 CES Response: For base bid, assume rock and pipe system. If a multi-pipe septic system: provides benefit to the Gov’t (cost and/or schedule), meets Florida Administrative Code (F.A.C.), Chapter 64E-6, and fits within the project area, please identify that as an approved alternative to rock and pipe.

IFB Section __33 11 00________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page __Drawing Sheet C-502_________

Other (Specify) ___________________________

Question: Is the septic contractor restricted to the 25x30 foot area for the drainfield?

Answer: 45 CES Response: For reference purposes only, please refer to attached calculations.

Contractor can expand outside designated are, minimize impact to the vegetated area to the south.

Other (Specify) ___________________________

Question: Has geotechnical work been performed? Is there any soil boring information available for the drain field area?

Answer: 45 CES Response: Yes, Geotech borings were conducted on September 18, 2020 by Universal Engineering Sciences. Request geotechnical report from Contracting Officer.

Other (Specify) ___________________________

Question: Are the sizing criteria/calculations for the septic system available?

Answer: 45 CES Response: For reference purposes only, please refer to attached calculations.

System requirements are set by Florida Administrative Code (F.A.C.), Chapter 64E-6.

IFB Section __________ Paragraph _________

SOW/Technical Specification/Drawings paragraph/page __Drawing Sheet CD-101

Other (Specify) ___________________________

Question: Please provide extent of demolition for the 1.5” water line. No depth, pipe type, or length is provided.

Answer: 45 CES Response: Reference drawing sheet CD101, Flag 1 and drawing sheet C001 note 4.

IFB Section 13 34 19 Paragraph 1.10.2/2.5.2

SOW/Technical Specification/Drawings paragraph/page: A-203

Other (Specify) ___________________________

Question: If an exposed fastener metal roof is used (see plan details), it cannot receive a weather tightness warranty as required in the specifications. Please clarify whether exposed fastener is desired.

Answer: 45 CES Response: The requirement is to match existing, which is standing seam metal roof. A weather tightness warranty will be required.