Attch_3_GEODSS_Staffing_Matrix.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Ground-Based Electro Optical Deep Space Surveillance Industry Day Federal contract opportunity
Solicitation number
FA251719RA005
Issued by
Department of the Air Force Space Command

About this file

This document contains instructions and templates for a staffing matrix and labor category position descriptions to support a federal contract opportunity. The staffing matrix templates require offerors to provide details on labor categories, position numbers, applicable PWS paragraphs, hours, FTEs, and whether positions will be performed by the prime or subcontractor for each GEODSS site for an 8-month base period and 6 one-year option periods. The labor category position description template requires relevant experience, education, certifications, security clearance level, and responsibilities for each position. Additionally, the related federal contract opportunity is for an industry day hosted by the Department of the Air Force Space Command regarding the Ground-Based Electro Optical Deep Space Surveillance program under solicitation FA251719RA005.

Attachment 3 - GEODSS Staffing Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Ground-Based Electro Optical Deep Space Surveillance Industry Day, newest first.
File Type Posted
GEODSS_FA251719RA0050004.pdf PDF
Attch_4_CLIN_Schedule_Worksheet_v3.xlsx XLSX spreadsheet
Attch_4_CLIN_Schedule_Worksheet_v2.xlsx XLSX spreadsheet
Attch_1_GEODSS_PWS_v3.docx DOCX document
GEODSS_FA251719RA0050003.pdf PDF
GEODSS_FA251719RA005_Conformed_Copy_as_of_12_July_2019.docx DOCX document
GEODSS_RFP_Questions_and_Answers_Round_2.pdf PDF
Attch_1_GEODSS_PWS_v2.pdf PDF
GEODSS_Site_Visits_Attendance_Roster.pdf PDF
GEODSS_FA251719RA0050002.pdf PDF
GEODSS_PreProposal_Conference.pptx PPTX presentation
Attch_6_GEODSS_DRAFT_CPAR_Matrix_v2.xlsx XLSX spreadsheet
GEODSS_FA251719RA0050001.pdf PDF
Detachment_3_Site_Visit_Attendee_List.pdf PDF
GEODSS_Site_Visit_Schedule_&_Agenda_Det_3_Maui_HI.pdf PDF
Q&A_Form_-_Socorro.pdf PDF
Q&A_Form_-_Maui.pdf PDF
Detachment_1_Site_Visit_Attendee_List_Corrected.pdf PDF
Detachment_1_Site_Visit_Attendee_List.pdf PDF
GEODSS_Site_Visit_Schedule_&_Agenda_Det_1_Socorro_NM.pdf PDF
Attch_5_GEODSS_DRAFT_DD_Form_254.pdf PDF
Addendum_A_SECTION_L_ADDENDUM_A.pdf PDF
Attch_1_GEODSS_PWS.pdf PDF
Attch_4_CLIN_Schedule_Worksheet.xlsx XLSX spreadsheet
GEODSS_Solicitation_-_FA251719RA005.pdf PDF
Attch_6_GEODSS_DRAFT_CPAR_Matrix.xlsx XLSX spreadsheet
GEODSS_Questions_Format.xlsx XLSX spreadsheet
Attch_2_Ops_and_Maint_Crew_Schedule_Format.xlsx XLSX spreadsheet
REVISED_FA251719RA005_GEODSS_Notice_of_Site_Visits.pdf PDF
GEODSS_Questions_and_Answers_-_Round_2.pdf PDF
GEODSS_Questions_and_Answers_-_Round_1.pdf PDF
FA251719RA005_GEODSS_Notice_of_Site_Visits.docx DOCX document
GEODSS_Instructions_for_Access_to_Bidders_Library.pdf PDF
FOUO_Guidance.pdf PDF
Attch_8_GEODSS_Questions_and_Answers_UPDATED_.xlsx XLSX spreadsheet
Attch_7_DRAFT_GEODSS_Provisions_and_Clauses.pdf PDF
GEODSS_Draft_Solicitation_-_FA251719RA005.pdf PDF
Attch_6_GEODSS_DRAFT_CPAR_Matrix_25_Mar_19.xlsx XLSX spreadsheet
Attch_1_GEODSS_PWS_28_Mar_19.pdf PDF
Attch_4_DRAFT_CLIN_Schedule_Worksheet_.xlsx XLSX spreadsheet
Attch_3_DRAFT_GEODSS_Staffing_Matrix_28_Mar_19.xlsx XLSX spreadsheet
Attch_5_GEODSS_DRAFT_DD_Form_254_20_Mar_19.pdf PDF
Attch_8_GEODSS_Questions_and_Answers_.xlsx XLSX spreadsheet
Attch_2_DRAFT_Ops_&_Maint_Crew_Schedule_Format_28_Mar_19.xlsx XLSX spreadsheet
Attch_1_-_Agenda.pdf PDF
Notice_of_Industry_Day.pdf PDF
Attch_3_-_Ground_Rules.pdf PDF
Attch_2_-_Base_Map_-_GEODSS.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions for Tab 1 & Tab 2

Instructions for the Staffing Matrix (Tab 1); include the following:
Labor Category/Position Title (use CBA labor category title, if applicable)
Position # (offeror numbering preference is acceptable)
Cross-utilization - indicate position being cross-utilized with an asterisk (*) and identify the other position number being cross-utilized with
PWS paragraphs covered by position(s) proposed - Ensure all Mission and Site Requirements are Covered
If the prime or subcontractor is proposed to perform for each labor category/position
Associated hours necessary to accomplish PWS requirements proposed for each labor category/position
Number of full-time equivalents (FTEs) based on hours proposed for each labor category/position
Provide a separate staffing matrix for each GEODSS site for 8 month base period and all option years
All site-applicable PWS paragraphs must be accounted for within the matrices, down to the subparagraph-level
NOTES:
1Offerors' format is acceptable as long as it includes all the required elements within the templates and examples; Microsoft Word or Excel may be used
2DO NOT include PWS Paragraph ranges (eg., X.1. - X.2 or X.1 through X.2) as this complicates Proposal Evaluation
3Ensure Labor Categories/Position Titles and #'s match proposed Operations and Maintenance Crew Schedules
4Ensure base period is for an 8 month period and Options include a full year (12 months) of hours
Instructions for Labor Category/Position Descriptions (Tab 2); include the following:
Labor Category/Position Title (use CBA labor category title, if applicable)
Position # (offeror numbering preference is acceptable)
Relevant experience
Relevant education
Applicable certification
Applicable licensing
Required security clearances (ensure Secret and the 10 TS/SCI positions are clearly identified)
Responsibilities associated with the GEODSS PWS and performance requirements
NOTES:
1Offerors' format is acceptable as long as it includes all the required elements within the templates and examples; Microsoft Word or Excel may be used
2Ensure Labor Categories/Position Titles and #'s match proposed Operations and Maintenance Crew Schedules
3Offerors' format must adhere to the font and formatting instructions in the RFP

Tab 1 - Staffing Matrix

GEODSS Staffing Matrix Format (Tab 1)
(See Instructions Tab for Staffing Matrix Requirements)
Contract Base Period (1 Sep 20 - 30 Apr 21) SITE:________________________
LABOR CATEGORY/ POSITION NUMBER (#)LABOR CATEGORY/POSITON TITLEPWS REQUIREMENT PARAGRAPHS PROPOSED TO PERFORMPRIME OR SUBCONTRACTORHOURSFTEs
2701EXAMPLE: Facility Maintenance2.X., 2.X.1., 2.X.1.2, 2.X.1.2.2., etc.
PRIMEXXXX
(e.g., 4160)XX

(e.g., 2)

Provide the same information (as above) for each site for each option year:
OPTION 11 May 2021 - 30 Apr 2022
OPTION 21 May 2022 - 30 Apr 2023
OPTION 31 May 2023 - 30 Apr 2024
OPTION 41 May 2024 - 30 Apr 2025
OPTION 51 May 2025 - 30 Apr 2026
OPTION 61 May 2026 - 30 Apr 2027

Tab 2 - Labor Cat_Position Desc LABOR CATEGORY/POSITION DESCRIPTIONS (Tab 2)

(See Instructions Tab for Labor Category/Position Description Requirements)
EXAMPLE
Position #/Title: 2701 - Facility Maintenance
Relevant Experience:
4-8 years of experience as a Facility Manager. Familiar with advanced civil engineering practices, HVAC, power, plumbing, fuel, and HAZMAT operations and has 2+ years of supervisory experience. Familiar with autoCAD and able to operate normal office equipment to include computers, faxes, and copiers. Experience in construction work and operation and maintenance of electric utilities, including facility backup generators and uninterruptible power supplies.
Education:
Associates Degree in Engineering/Mechanical/Technical field, or equivalent experience.
Certifications/Licensing:
- Electrician Training and certification by applicable State/National Code
- Plumbing and Backflow Prevention Training and Certification by applicable State/National code/Uniform
Plumbing Code
- Lightning Protection/Grounding System Training and Certification – National
- HVAC system Training and Certification with EPA compliance by State/National Code
- Fire System Training - National
Security Clearance:
U.S. Citizen and possess DoD security Clearance
Responsibilities:
- Perform facility maintenance and minor repair as well as facility manager functions
- Operate, maintain, repair all RPIE, PCCIE and support equipment
- Provide preventative maintenance of RPIE and PCCIE
- etc.

File details come from the government source that posted it. Updated .