Exhibit Q- Summary of Required RFP Submittal Documents.pdf

PDF 195 KB Posted

Attached to
Main Ring Electrical P-F3 to P-F4 15KV Cable Installation, FESS Project 3-7-103B
Solicitation number
375108-CD
Issued by

About this file

This document is a Summary of Required Solicitation Documents for a federal contract opportunity at Fermilab, focused on medium voltage power utility installation. The Technical Proposal section requires offerors to demonstrate corporate capabilities in underground utility construction, including ten years of industry experience, NFPA 70E compliance, and specific technical expertise in medium voltage cable installation, removal, splicing, and testing. Offerors must provide four past project examples, detailed project descriptions, and key personnel with specific qualifications, including a Project Manager with five years of experience, a Project Superintendent with ten years of experience, and a Safety Engineer with five years of experience.

The Business Management & Price Proposal section requires a firm fixed price proposal, a bid guarantee of 20% (not exceeding $3 million), and several supporting documents including Subcontractor Annual Representations & Certifications, Proposal Certifications, and comprehensive safety and quality documentation. Required safety documents include the Fermilab Subcontractor Injury & Illness Data Questionnaire, Construction Environmental, Safety & Health Certification, NCCI Workers Compensation Experience Rating form, OSHA 300A Form logs, and a Corporate Safety and Health Quality Plan. The solicitation emphasizes technical capabilities in underground utility work, safety compliance, and detailed project documentation.

View the file

Other files

File Type Posted
Amend 03 to RFP 375018-CD.pdf PDF
375108-CD Amendment 2 Revised Drawings.pdf PDF
Amend 02 to RFP 375108-CD.pdf PDF
375108-CD Amendmant 2 Revised Response to Questions.pdf PDF
375108-CD Amendment 2 Revised Exhibit R - Proposal Form.pdf PDF
375108-CD Amendment 1 Revised Exhibit R - Proposal Form.pdf PDF
375108-CD Amendment 1 Revised Drawings.pdf PDF
375108-CD Amendmant 1 Response to Questions.pdf PDF
Amend 01 to RFP 375108-CD.pdf PDF
1.0 RFP 375108-CD.pdf PDF
Exhibit B1- Section 16010 General Electrical Requirements.pdf PDF
Exhibit B3- Section 16125 15KV Cable Installation.pdf PDF
Exhibit C- 010010 General Requirements.pdf PDF
Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit J - Bond Payment FL-42.pdf PDF
Exhibit K- Bond Performance FL-40.pdf PDF
Exhibit L - Statement of Acknowledgment (SF-1413).pdf PDF
Exhibit A- P-F3 TO P-F4 15KV Cable Installation SOW.pdf PDF
Exhibit E- 013300 Submittals.pdf PDF
Exhibit N - SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf PDF
Exhibit O - Proposal Certifications Form PUR-466_FFDG.pdf PDF
Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf PDF
Exhibit B Drawings.pdf PDF
Exhibit B4- Section 16450 Grounding and Bonding.pdf PDF
Exhibit B5- Section 16950 Testing Electrical Systems.pdf PDF
Exhibit D- 013100 ESH Requirements.pdf PDF
Exhibit F- 014100 Quality Requirements.pdf PDF
Exhibit R - Proposal Form 375018-CD F3 to F4 15KV Cable Installation.pdf PDF
Exhibit B2- Section 16121 Medium Voltgage Cable.pdf PDF
Exhibit H - 2025 Construction Insurance Requirements.pdf PDF
Exhibit I - Bond Bid FL-41.pdf PDF
Exhibit M - Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit P- Davis Bacon Wage Rates.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF REQUIRED SOLICITATION DOCUMENTS

PART 1: TECHNICAL PROPOSAL (RESPONSES TO TECHNICAL EVALUATION CRITERIA)

Offerors shall respond to the following technical criteria:

1. Corporate Capabilities

Offeror shall provide information and demonstrate each sub-criterion below either in the form of its corporate capabilities or a project summary.

• Offeror shall provide information and demonstrate each sub-criterion below either in the form of its corporate capabilities or a project summary.

• Experience installing or coordinating the installation of medium voltage power utilities under public roadways.

• Having at least ten (10) years of construction industry experience in the installation of new medium voltage power underground utilities, including experience connecting into an existing power system installed in underground concrete encased duct bank systems. Must be familiar with confined space entry and ODH requirements for manhole entry.

• NFPA 70E compliant and have experience of electrical installation of similar voltages.

2. Current/Past Projects

FRA will evaluate the extent to which the Offeror’s previous experience with projects of a similar size, scope, and complexity demonstrates the Offeror’s capability to successfully perform the requirements of this project. Offeror shall provide at least four (4) project experiences completed within the past ten (10) years that are of similar type, size, scope, and complexity as described in the solicitation documents.

Items of interest for the project experience are:

• Installation of medium voltage jacketed concentric neutral power cable in duct bank systems.

• Removal of medium voltage jacketed concentric neutral power cable in duct bank systems.

• Splicing of medium voltage jacketed concentric neutral power cable.

• Termination of medium voltage jacketed concentric neutral power cable.

• Testing and phasing of medium voltage jacketed concentric neutral power cable in duct bank systems.

• Excavation and concrete equipment pad construction

• Electrical duct bank construction

Project Experience shall include the items listed above as well as the following:

• Customer Name;

• Project Name and Location;

• Project Description;

• Total Contract Amount; and

• Project Start and Completion Date. If a current project, please provide the Percent (%) Complete and the projected completion date.

3. Key Personnel Experience will be evaluated to determine the degree of and relevance of experience the Key Personnel possess related to the subject requirements. Evaluation of experience will factor in the length and degree of experience in the relevant technical areas. Please note that as a condition of contract award and performance, the Subcontractor may not substitute proposed Key Personnel named in their proposal without FRA approval. The replacement staff must possess education and experience equivalent to or exceeding that of the individual being replaced.

Key Personnel must have the following experience:

• Project Manager – Five (5) years of construction industry experience, completed three

(3) projects of similar size/scope, municipal project experience, and previous experience with DOE national laboratory work.

• Project Superintendent – Ten (10) years of construction industry experience, completed five (5) projects of similar size/scope, underground utility project experience, and completed the 30-hour OSHA Training Course and NFPA 70E training and previous experience with DOE national laboratory work.

• Safety Engineer – Five (5) years of construction industry experience, a Certified Safety Professional of comparable professional registration, completed five (5) projects with Project Safety Program.

4. Bonding

The Offeror must be capable of obtaining performance and payment bonds to the full cost of the project, including the cost of any change orders. The Offeror shall stipulate its bonding capacity for the project.

Part 2 - Business Management & Price Proposal

The Business Management proposal shall contain the following documents/items:

1) Price Proposal Form

The proposed pricing shall be a firm fixed price for the work. The Price Proposal Form is required to be completed and signed.

2) Bid Guarantee/Bond

The offeror shall provide a bid guarantee in the amount of not less than 20 percent (not to exceed $3 million) of the proposal price. Failure to furnish a bid guarantee in the proper form and amount, by the time set for the due date of the offers, may be cause for rejection of the offer. The bid guarantee shall be in the form of a firm commitment, such as a bond, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds, or notes of the United States.

3) Subcontractor Annual Representations & Certifications (SARC), Form SARC

The successful Offeror’s submittal of this completed form will be incorporated in the resultant subcontract. If an offering entity is a joint venture, association, consortia, or partnership, each member entity must submit an individual Representations and Certifications Form.

4) Proposal Certifications, Form PUR-466

All appropriate sections are required to be completed and signed by a company official.

5) Safety and Quality Documents

The following documents are required to be submitted with the proposal:

• Fermilab Subcontractor Injury & Illness Data Questionnaire (completed and signed).

• Construction Environmental, Safety & Health Certification (CESHC) (completed and signed).

• The National Council on Compensation Insurance (NCCI) Workers Compensation Experience Rating form for the past three years.

• Occupational and Safety Health Administration (OSHA) 300 A Form logs for the past three years.

• Corporate Safety and Health and Quality Plan (if your company’s plan has not already been accepted by FFDG).

• Sample Certificate of Insurance.

File details come from the government source that posted it. Updated .